Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Aligning Resource Estimates with Mine PlanningBy D Kentwell
A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma
Nov 24, 2014
-
Selective Open Pit Mining and Ore Treatment at Croydon Gold Mine, North QueenslandBy Kandemir H, Stafford G
The Croydon Gold Mine is located in northwest Queensland and is a joint venture between Central Coast Exploration N.L. and Pancontinental Mining Ltd. The mining operation commenced in 1987 and co
Jan 1, 1989
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
The Copper-Lead-Sulphur System at High Temperatures, and its Application to Continuous Copper DrossingBy Willis GM
The matte-metal-equilibria in the system Pb-Cu-S have been studied at temperatures between 720 and 920¦C by direct sampling and D.T.A. methods. These results are compared with those of other worker
Jan 1, 1975
-
Production of Submicron Particles by Autogenous Grinding with a Stirred MillBy Sano S, Ishikawa T, Nagaoka H, Hayashi Y, Hasegawa M
The stirred mill is regarded as one of the most efficient devices for micronising materials and has come to be actively used for preparation of fine particles. Recently, the demand for ultrafine par
Jan 1, 1993
-
In-Pit Crushing and ConveyingBy I Lourel
In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t
Jan 1, 2009
-
Hydraulic Boulder Fragmentation Using Small Explosive ChargesBy P Worsey, B Lane
The recommended maximum explosive weight for boulder blasting using internal charges is 0.15 kg/m 3 (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, creating increas
Jan 1, 1999
-
Seismic Stability Analysis of Sangan Iron Mine Project Tailings DamBy N Ganjian, A Delavar, F Rashidi Nejad
Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft
Jul 27, 2015
-
Slope stability is a critical issue for the open pit mining communityBy M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale
In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person
Jun 22, 2022
-
Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head GradeBy K Jupp, T J. Howard
Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled
Jan 1, 2009
-
Ernest Henry Underground Mine – Access and Support Infrastructure DesignBy P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Improving the dewatering efficiency of clay-rich tailings in saline waterBy D Liu, M Edraki, L Berry
The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater
Jul 23, 2018
-
Coal Seam Degasification by use of Hydraulic Fracturing in Vertical Wells Case HistoriesBy Barro L
Very large reserves of gas are contained in coal. Because of the low permeability of the coal gas flow rates are very low. Fracturing of the coal can be achieved by use of the nitrogen - foam frac
Jan 1, 1982
-
Ground Control Hazard Analysis in Multi-Seam MiningBy Zhou Y, Karmis M, Haycocks C
Hazard analysis utilizes interaction mecha- nisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using charac
Jan 1, 1992
-
Description of Transportable Bulk Testing Plants for use in Diamond ExplorationDiamond bearing deposits are extremely low grade and require large bulk samples to be tested to determine the grade and quality of the stones. The semi portable plants, for treatment of these bulk
Jan 1, 1984
-
Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken HillBy Johns AS
Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.
Jan 1, 1978
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Automated Production Data Collection and Reporting at a Large Open Pit MineBy T Mattiske
The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,
Jan 1, 2002
-
Planning and Cost Criteria for Mining InfrastructureBy Mahony BK
This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans
Jan 1, 1983
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011