Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, COBy Collin Stewart
Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac
Jan 1, 2006
-
Optimisation of Coke Breeze Addition in Iron Ore PelletsBy G. Paquet, E. Godin
"Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as
Jan 1, 1986
-
Responsible coal sourcing - taking the next stepBy R. Strandahl
As one of the largest private utilities globally, E.ON currently operates hard coal fired power stations in with a total installed capacity of some 20.000 MW: These thermal power plants consume domest
Jan 1, 2011
-
Advanced underwater acoustics for unchained operations in deep sea mining - S2C-network solution for underwater communication, geo-referenced navigation / positioning and monitoring purposesBy K. G. Kebkal, R. Bannasch
"Because the operation of tethered underwater vehicles in the deep ocean or under drifting ice areas is very complicated or impossible, the application of autonomous underwater vehicles (AUV) is prefe
Sep 1, 2014
-
ABB?S Belt Conveyor Systems Portfolio - IntroductionBy U. Richter
Conveyors are a highly effective means of transporting material over long distances. Recently there has been a trend toward long conveyor systems with high capacity single flights. These conveyor
Jan 1, 2012
-
Hydraulic Impacts Of Quarries And Pits: Critical Planning For Resource DevelopmentIntroduction Aggregate mining impacts on water resources are a source of concern to local governments. To evaluate those impacts, the Minnesota Department of Natural Resources conducted a four-year
Jan 1, 2007
-
Flotation Feed Size DistributionBy Claude Bazin
"Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show
Jan 1, 2006
-
The Cost And Benefit Of The Phase 2 Investigation For The Reach 4 Tunnel, How A Roll Of The Dice Came Up BIG In Las VegasBy Ray Brainard
The subsurface investigation for the Reach 4 Tunnel was expected to be completed in a single phase. This assumed that data from two nearby previous tunnels, combined with limited new subsurface inform
-
Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm WallsBy B. Sivarama Sarma, Biswabikash Rout
"Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes
Jan 1, 2017
-
Selective Froth Recovery (SFR) System To Increase Flotation RecoveryThe SFR system utilizes a skimmer or extractor placed at or near the slurry-froth interface where there is a higher concentration of valuable mineral particles. With assistance of hydrocyclones, it is
Jan 1, 2012
-
The Long-Term Performance of Surface Support Liners for Ground Control in a Underground MineBy Eric S. Weiss, Deno M. Pappas, Timothy M. Barton
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments with surface support liners which in
-
Impurities in a Murray Basin Zircon SandZircon producers are often required to lower impurity levels to meet customer specifications as most of these impurities adversely effect the end use. For example, zircon sand in foundry applications
Jan 1, 2000
-
Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - SynopsisBy J. J. Bezuidenhout
The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp
Jan 1, 2008
-
Research on the Roof Advanced Breaking Position of Large Mining Height Working Face in Shallow Coal SeamFully mechanized longwall mining with large mining heights (LMHs) in shallow-depth thick coal seams has been widely applied in Shenfu coalfield, China. Dynamic loading and rib spalling is serious when
Jul 28, 2020
-
Underground Construction For A Combined Sewer Overflow System In Providence, Rhode IslandBy John L. Kaplin
The underground construction for the Phase I Combined Sewer Overflow(CSO) Project is on an impressive scale by any measure, appearing more so in a midsize city like Providence, RI. The Narragansett Ba
-
How to Manage Machine Duty to Sustain High Production RatesBy P Meehan, R McAree, Z Guan
Equipment maintenance is 30 - 50 per cent of the operating costs for a typical mining company. While this is substantial, its importance is beyond its significance as a cost heading. Modern mining req
Jan 1, 2002
-
Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical ApproachBy Dave Bulled
"This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using
Jan 1, 2007
-
Comparative Real-Time Characterization Of Frother Bubble Thin FilmsBy M. Gouet-Kaplan, J. A. Finch, S. Gélinas
Methylisobutyl carbinol (MIBC) and methoxy polypropylene glycol (Dowfroth 250) bubble thin films were characterized by composition and thickness determinations, using FT-IR spectroscopy and UV-Visible
Jan 1, 2006
-
Development Of Fuzzy Rule-Based Systems For Industrial Flotation Plants By Use Of Inductive Techniques And Genetic AlgorithmsControl of flotation processes is mostly managed by plant operators, who assess the performance of the plant based on their own experience and other heuristic rules. These rules tend to be subjective
Jan 1, 2000
-
A Laboratory Investigation Into The Effect Of Specimen Size On The Strength Of Coal Samples From Different AreasBy J. N. Van der Merwe
The results of over 900 coal strength tests done during the period 1993?1994 for the SIMRAC project COL021A were re-analysed with a view to find a method to delineate areas or seams that can be groupe
Jan 1, 2003