  • DFI
    Regulations Of Construction Vibrations

    By Mark R. Svinkin

    Regulations are needed to keep construction vibrations in tolerable limits. The existing regulations were developed for low-rise residential structures, but they are incorrectly used for different sup

    Jan 1, 2006

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • CIM
    Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting Technology

    By Eugen Gluck, Gus Van Weert, Peter Kondos

    "Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i

    Jan 1, 2009

  • AUSIMM
    Computer Simulation of Roadway Development to Support Longwall Mining

    Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fixed plant transport requirements to that of similar systems in service. This paper descr

    Dec 6, 2010

  • AIME
    Iron and Steel Division - Activity Coefficient of Copper in Liquid Iron, Fe-C, And Fe-C-Si Alloys at 1600°C

    By John Chipman, Peter J. Koros

    The distribution of copper between liquid silver and liquid iron, Fe-C, and Fe-C-Si alloys was studied at 1600°C. From the data and the activity of copper in silver obtained from the phase diagrams, t

    Jan 1, 1957

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - Summary

    By K. Nong, H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2007

  • AUSIMM
    An Aeromagnetic Survey Over an Extinct Geothermal System, Onemana, Coromandel Peninsula, New Zealand

    In March 1990, Heritage Mining conducted a 2000 line km high resolution aeromagnetic survey of all its prospects in the Coromandel Peninsula. One of the areas covered was the Onemana Peninsula, situat

    Jan 1, 1991

  • AUSIMM
    A Deformed Gold-Arsenopyrite-Pyrite Deposit Hosted in Peralkaline Granite Porphyry at Sams Creek, West Nelson, New Zealand

    By K Faure

    At Sams Creek a gold-bearing, peralkaline granite pophyry dike intrudes Ordovician-Silurian metapelite and quartzite. These metasedimentary rocks have undergone three phases of folding: a first phase

    Jan 1, 2003

  • SAIMM
    A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.

    By Simon St J Tose

    The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t

    Jan 1, 2006

  • SME
    Application Of Highwall Mining System For Recovering Coal Of End-Walls In China

    According to the previous research, it is found that the thickness of cover is mostly less than 100 m for highwall mining system. However, for most of the Chinese surface coal mines, the mining depth

    Jan 1, 2012

  • ISEE
    Acceleration and Deformation of an Explosively-Driven Metal Plate

    By Steven A. Mathe, Seokbin Lim

    Current analytical models can accurately predict the final velocity of explosively driven flyers and can somewhat predict the acceleration profile, but do little to address the deformation of the flye

    Jan 1, 2015

  • CIM
    Alkali/Alumina Molar Ratio Trends in Altered Granitoid Rocks Hosting Porphyry and Related Deposits

    By R. E. Whitehead

    "Alkali/alumina and MgO/alumina molar ratio plots graphically portray both chemical and mineralogical changes accompanying potassic, phyllic, argillic, chloritic, and alunitic alteration of quartz mon

    Jan 1, 2009

  • AUSIMM
    PACMANUS: An Active Seafloor Hydrothermal Field on Siliceous Volcanic Rocks in the Eastern Manus Basin, Papua New Guinea

    By J M. Parr, P M. Herzig, J B. Gemmell, S D. Scott

    PACMANUS is an actively-forming seafloor analogue of volcanic-hosted massive sulfide orebodies, situated on the crest of an andesite-dacite-rhyodacite ridge overlying rifted older arc crust in a back-

    Jan 1, 1995

  • ISEE
    A Tiered Approach to Mitigating the Environmental Effects of Underwater Blasting

    By Thomas M. Keevin, Gregory L. Hempen

    "Natural resource agencies, under various regulatory authorities, are challenged with permitting underwater explosive use while at the same time protecting aquatic resources. Deciding on whether or no

    Jan 1, 1995

  • DFI
    Aseismic Bearing Capacity Of Pile Foundation ? Synopsis

    By J. X. Wu

    An investigation on the seismic damage to buildings with pile foundations in Tianjin region, was conducted after the earthquake which hit Tangshan in 1976. It showed that most pile-founded buildings h

    Jan 1, 2010

  • ISEE
    Balancing Labor and Capital: A Global View

    By David Reddick

    The mining industry is in the midst of dramatic change. Mining activities are moving from industrialized first world countries (Canada, Australia, and the United States) to the third world. This shift

    Jan 1, 1997

  • ISEE
    Microphone Height Effects on Blast-Induces Air Overpressure

    By Randall M. Wheeler, Kenneth K. Eltschlager

    Blasting Seismographs use microphones to measure air overpressure from blasting. The microphone height above the ground has been the object of some controversy. The current ISEE “Field Practice Guidel

    Jan 1, 2005

  • DFI
    Secant Pile Shoring - Developments In Design And Construction

    By Eric S. Lindquist

    High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t

    Jan 1, 2011

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • NIOSH
    RI 7082 An Electrolytic Process For Separating Nickel And Cobalt

    By T. A. Sullivan

    Refining in a molten salt electrolyte was investigated as a means of recovering nickel containing less than 1 percent and preferably less than 0.2 percent cobalt from nickel products containing up to

    Jan 1, 1968