Search Documents

  • SME
    Collapse and Remining of Tunnel TO8 at THSRC Contract C230

    By William Stewart, John Tinkler, Gary B. Hemphill

    Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin

    Jan 1, 2005

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • AUSIMM
    Using Haulage Accidents and Incident Reports to Identify the Impact of Substandard Haul Road Design on Operational Safety

    Well designed and maintained haul roads are the key to minimising truck haulage on-road hazards and costs, as well as increasing productivity. However, practically designing and managing a haul road f

    Dec 6, 2010

  • SME
    Enhancement Of Bacterial Iron And Sulfate Respiration For In-Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study

    By James M. Harrington, A. Azra Bilgin, JoAnn Silverstein

    The prevention of AMD in situ is more attractive compared to subsequent downgradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the micr

    Jan 1, 2005

  • SME
    M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway

    By Isabelle Lamb, Manfred K. Lechner, Daniel N. Adams

    Sydney Australia’s M5 East Motorway connects southwestern suburbs to the airport. Central to the project are twin 3.8 km roadway tunnels which are mostly driven through rock. In order to come up with

    Jan 1, 2001

  • AUSIMM
    Role of Bubbles in the Action of Flotation Agents

    Role of Bubbles in the Action of Flotation Agents

    Sep 13, 2010

  • DFI
    In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned

    By François G. Bernardeau

    Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement

    Jan 1, 2008

  • IIMP
    Informatización de datos Geológicos al servicio de las operaciones en la mina Iscaycruz

    By Boris Chacón

    Durante el desarrollo cotidiano de una operación minera, se obtienen diversos tipos de información como: muestreo, perforación diamantina, etc. las cuales, se originan en base a observaciones de campo

    Aug 25, 2002

  • AUSIMM
    The softening and melting behaviour of single and mixed iron ore burdens

    By B B. Du, Y N. Lu, L X. Wang, S L. Wu

    The cohesive zone in the blast furnace is largely affected by the softening and melting behaviour of ferrous burden because of its vital role in the blast furnace process. The Visual High Temperature

    Jul 24, 2017

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • ISEE
    Computer-Aided Design & High-Precision Systems in Drilling & Blasting

    By William Wilkinson, Vladisla Kecojevic

    Current three-dimensional (3D) computer design technology leveraged into drill and blast planning and operations is changing the way engineers and operations approach drill and blast design. Additiona

    Jan 1, 2004

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • DFI
    Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case History

    By R. Heath Forbes

    The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted

    Jan 1, 2011

  • SME
    Bio-Indicator Evaluation of Water Quality Impacts from Inactive and Abandoned Mines in the Bear Butte Creek Basin of the Black Hills

    By A. D. Davis, J. L. Sorensen, C. J. Webb

    Environmental impacts from acidic mine drainage are growing national concerns that are particularly acute in the headwaters of the Rocky Mountain region. In the Black Hills of South Dakota, approximat

    Jan 1, 1999

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • SAIMM
    Interactions Of Two-Liquid CaO-MgO-FetO-P2O5 Slag With MgO Refractories

    By T. Tamura

    It is known that the CaO-FetO-P2O5slag system has a wide liquid miscibility gap at steelmaking temperatures and this two-liquid slag phase has many advantages such as high activities of both FetO and

    Jan 1, 2004

  • AUSIMM
    FlowSim – A Versatile Flow Simulation Tool to Quantify Extraction and Design Alternatives for Block Caving

    By A Hekmat, M Fuentes, F Armijo, R Castro, F Rodriguez

    Interpreting the behaviour of granular material and simulating the gravity flow are complex processes in cave mining methods. In this paper, a new Cellular Automata based code – FlowSim – is used as a

    May 9, 2016