Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 9239 - Evaluation of Moderately High-Pressure Water-Jet Assist Applied to Single Drag Bit ToolsBy J. L. Thompson
The U.S. Bureau of Mines conducted a water-jet-studies program using a single-bit, in-seam test unit to determine effects of a moderately high-pressure (up to 10,000 psi) water-jet-assisted cutting sy
Jan 1, 1989
-
RI 2661 Exhaust Gases From Engines Using Ethyl GasolineBy B. G. H. Thomas, W. P. Yant, A. C. Fieldner, R. R. Sayers, W. J. McConnell
"One of the outstanding problems confronting automotive engineers in attempting to construct motors of greater economy is that of eliminating the ""knock"" from the operation of the engine. Recent inv
Dec 1, 1924
-
IC 7794 Report Of Bureau Of Mines Research And Technologic Work On Coal And Related Investigations, 1955 ? Introduction And SummaryBy E. P. Carman
This report is the 20th in a series summarizing Bureau of Mines research and technologic work on coal and related investigations; it is the second4/ to be issued on a calendar-year basis. Previous rep
Jan 1, 1957
-
SFMOMA Expansion – Multiple Uses of Ground Improvement – A Case StudyBy Scott A. Walker, Frank L. Rollo
"The San Francisco Museum of Modern Art (SFMOMA) in downtown metropolitan San Francisco, California, is supported on a mat foundation. Although the mat foundation of the original museum was designed t
Jan 1, 2014
-
Pillar Optimization For Initial Design And Retreat RecoveryBy Charles Steed
The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t
Jan 1, 2003
-
Mine Pillar Design Using the Ground Reaction Curve ConceptBy Ravi Ray, Kostas Kaklis, Zach Agioutantis
"Modern underground mining is becoming more complex and geotechnically challenging. The engineer uses numerical, analytical, and data-driven methods (empirical and/or experimental) or their combinatio
Jan 1, 2019
-
OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? IntroThis appendix contains the list of equipment, their corresponding number and their specifications with the quotations from the vendors/ manufacturers who can supply this equipment. The listings are ar
Jan 1, 1979
-
MLA 50-86 - Mineral Resources Of The Little Jacks Creek Study Area, Owyhee County, Idaho ? SummaryBy Richard A. Winters
In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 34,000 acres of the 58,040-acre Little Jacks Creek Wilderness Study Area (ID-111-6) in order to evaluate
Jan 1, 1986
-
IC 7261 Recent Developments In Fuel Supply And DemandBy Arno C. Fieldner
Six years ago, I addressed the annual meeting of the American Society for Testing Materials on "Fuels of Today and Tomorrow."3/ Since then, our country has been drawn into another great war of veritab
Jan 1, 1943
-
The Next Decade Of Change - Mining's New Future Management, Metrics, Methods, Machines, Maintenance, MoneyThe reduced need for traditionally trained and educated personnel in the mining industry is systemic to the changing mining industry. Our universities and other training institutions are doing just fi
Jan 1, 2011
-
OFR-16(3)-80 Three-Dimensional Finite Element Analyses Of Single- And Double-Entry Portions Of Sunnyside Mine No. 1By D. E. Van Dillen
Three-dimensional structural analyses of three instrumented areas of a deep, longwall coal mine have been performed using the finite element code BMINES. The three Instrumented areas include two singl
Jan 1, 1978
-
Deep Soil Mixing Utilizing Multi-Auger Equipment And Procedures - General - Background InformationBy Robert Jakiel
The following paper is being presented to provide a basic understanding of the equipment and procedures used in multi-auger deep soil mixing as part of the program for the Deep Foundations Institute (
Jan 1, 2001
-
RI 7603 Recovery Of Aluminum From Aluminum-Silicon AlloysBy E. L. Singleton
The Bureau of Mines investigated extraction of aluminum from aluminum-silicon alloys as a means of utilizing domestic aluminum silicate ores for aluminum production. Aluminum was extracted from alu
Jan 1, 1972
-
-
RI 8299 Wood Precharring: A Novel Fire-Retardancy TechniqueBy Calvin K. Lee
This Bureau of Mines report describes a simple fire-retardant treatment for wood. The treatment involves preheating the wood surface at high heat flux (~0.6 cal/cm2 sec) to form an in situ surface cha
Jan 1, 1978
-
RI 6386 Laboratory Continuous Flotation of Bertrandite and Phenacite From Mount Wheeler, Nev., Beryllium OresBy William I. Nissen, Richard Havens
Continuous flotation studies were made at a 50 - lb - per - hr feed rate to confirm the effectiveness of a batch - scale procedure for concentrating phenacite and bertrandite minerals from Mount Wheel
Jan 1, 1964
-
Axial Capacities Of Drilled Displacement Piles Predicted By Spt And Cpt Based MethodsBy Sam Warren, Antonio Marinucci, Genesis Z. Figueroa, Anne Lemnitzer
Drilled Displacement Piles (DDP) provide an ideal deep foundation solution that combines the benefits of ground improvement with traditional advantages of piling systems. This paper consolidates data
May 1, 2022
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
Analysis of Twin Road Tunnels Using Numerical Modelling TechniquesBy D R. Wines
The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi
Mar 8, 2011
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box JackingBy Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001