  • AUSIMM
    The Geology of the Golden Cross Orebody - Complex Veining and Evolving Mining Responses

    By W C. Cook, S J. Mathews, A H. Purvis

    The Golden Cross Gold Mine is located at the head of the Waite kauri Ri ver, 8 km northwest of Waihi near the southern end of the Coromandel Range. The mine produces gold and silver from epithermal ve

    Jan 1, 1993

  • NIOSH
    OFR-32-84 Application Of Draft Power Sensor (DPS) Concepts To Pan Scrapers

    By H. S. Benson

    This report documents, from concept through field testing, the pan scraper Wheel Slip Monitor. The function of this device is to instantly warn the scraper operator of wheel slip and thus enable him t

    Jan 1, 1983

  • SME
    Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access Project

    By A. J. Thompson

    The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se

    Jan 1, 2012

  • ISEE
    Measuring Blast Movement to Reduce Ore Loss and Dilution

    By Darren Thorton, David Sprott, Ian Brunton

    Blasting causes movement of the rock and can be detrimental to the accurate delineation of the ore and waste regions within the resulting muck pile. The consequences can be ore loss and dilution. Howe

    Jan 1, 2005

  • NIOSH
    OFR-18-93 Manganese Retention In Simulated Wetlands: An Exploration Of Design Parameters

    By L. R. Stark

    Two wetland simulation experiments were carried out in order to determine the effects on manganese retention of several wetland design parameters, including flow rate, inlet pH, carbon supplementation

    Jan 1, 1993

  • AUSIMM
    Deep Leaching and Accelerated Post-Mine Oxidation in the 500 Orebody at Mount Isa

    Structurally- controlled deep leaching processes have removed vast quantities of carbonate from a substantial portion of the "silica-dolomite" enclosing the 500 copper orebody. Mine drainage

    Jan 1, 1968

  • NIOSH
    RI 5839 Bacteria In Mining And Metallurgy: Leaching Selected Ores And Minerals; Experiments With Thiobacillus Thiooxidans ? Summary

    By Joseph A. Sutton

    This study was undertaken by the Bureau of Mines to determine whether the sulfur-oxidizing bacterium Thiobacillus thiooxidans could use sulfur compounds to produce sulfuric acid in sufficient quantiti

    Jan 1, 1961

  • AUSIMM
    Paleodepth Studies of Epithermal Au-Ag Deposits in the North Island of New Zealand û Progress Toward a 4D Model

    By R L. Brathwaite

    Previous paleodepth studies of low-sulphidation epithermal Au-Ag deposits in the Coromandel region indicated that economic gold mineralisation was generally limited to a depth zone of 100 to 400 m bel

    Jan 1, 2003

  • SAIMM
    LHD optimization at an undergroundchromite mine

    By W. Mbhalati

    "Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat

    Jan 1, 2015

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    Seismic While Drilling (SWD) is a newly developed technology in the mining industry. Improving upon Measurement While Drilling (MWD) systems, SWD measures mechanical properties of the rock at incremen

  • NIOSH
    OFR-151-81 Evaluation And Demonstration Of A New Post Disaster EM Communication Technique For Mines

    By M. P. Ristenbatt

    A new automated post-disaster signaling system, intended to use through-the-earth EM propagation, was demonstrated in the laboratory at an input SNR of -34 dB. The system presently available requires

    Jan 1, 1981

  • SME
    The Interaction Of Tunnel Ventilation Systems And Cross Passageway Ways - Preprint 09-055

    By M. J. Gilbey

    Cross passageways between adjacent tunnels in passenger rail or transit systems may be used during train fire emergencies to evacuate passengers to points of safety in the non-incident tunnel. Rescue

    Jan 1, 2009

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • AIME
    Iron and Steel Division - Liquid Miscibility Gap in Iron-Tin System (TN)

    By K. C. Mills, E. T. Turkdogan

    A number of investigators1 6 have noted the presence of a liquid miscibility gap in the Fe-Sn binary system. However, the first attempt to measure the

    Jan 1, 1964

  • SAIMM
    Recycling And Environmental Issues Of Metallurgical Slags And Salt Fluxes

    By M. Reuter, U. Boin

    The target of the current metallurgical industry is to recycle and utilize all their by-products, so as to close the sustainable production loop. Slags are the important wastes and by-products of meta

    Jan 1, 2004

  • DFI
    The Design And Formation Of Bored Displacement Piles - A United Kingdom Perspective

    By David J. Baxter

    Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo

    Jan 1, 2006

  • AUSIMM
    Magma Suites and Metallogeny - Examples from the Canadian Cordillera

    By J R. Lang, J K. Mortensen

    The Canadian Cordillera contains numerous classic porphyry deposits and several unusual subtypes, including the alkaline suite of porphyry Cu-Au deposits and the Tombstone m

    Jan 1, 1995

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008

  • DFI
    A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? Synopsis

    By M. Makarchian

    Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num