Search Documents

  • AUSIMM
    Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines Operation

    By T Howard, J E. Everett

    BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc

    Jan 1, 2002

  • SME
    Educational Programs And Partnerships In Mineral Engineering

    By Wijnand Dalmijn, Hans de Ruiter

    Experience over the past eight years has proven that partnership and cooperation in mineral engineering education is essential to maintain programs in this field. At this moment the joint European Min

    Jan 1, 2005

  • SME
    Though Not a Record Year, the Coal Industry Performs Well in 1983

    By L. Westerstrom

    Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th

    Jan 5, 1984

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • AUSIMM
    Mining Methods at Iron Knob, South Australia

    In setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T

    Jan 1, 1936

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987

  • AIME
    Minerals Beneficiation - A Study of the Equilibrium Ion-Exchange Properties of an Oxidized Calcareous Iron Ore

    By F. W. Bowdish

    Analysis of data on the equilibrium exchange of sodium ions from salt solutions for calcium ions, from various fractions of an oxidized calcareous iron ore from Lorraine, France, strongly suggests tha

    Jan 1, 1963

  • NIOSH
    RI 5331 Physical Properties And Behavior Of The Newcastle Oil-Reservoir Sand, Weston County, Wyo. ? Summary

    By Oren C. Baptist

    [Several new oilfields have been developed in northwestern Wyoming during the past 10 years, production is obtained from discontinuous, permeable sands enclosed within impermeable shales. The energy t

    Jan 1, 1957

  • DFI
    Development and Experiences on Versatile Applications of RD-pile Wall

    By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen

    "Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist

    Jan 1, 2014

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • AUSIMM
    Flotation Circuit Optimisation - Towards More Sustainable Practice

    Flotation Circuit Optimisation - Towards More Sustainable Practice

    Sep 13, 2010

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • NIOSH
    IC 6966 Occurrence And Treatment Of Mercury Ore At Small Mines ? Introduction

    By M. W. Von Bernewitz

    The Bureau of Mines receives frequent requests for information on the treatment of mercury ores, but as its own and almost all other publications on mercury are out of print, the Bureau has prepared t

    Jan 1, 1937

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • IOM3
    Enhancement of dump truck operating efficiency: part 1: method of shovel and truck matching to obtain whole numbers; part 2: optimization of haul-road gradients; part 3: effect of reduced payload

    By I. R. Hanby

    A simple solution to the problem of whether to round the calculated number of trucks up or down to the nearest whole number is to adopt as criterion the minimum cost per unit volume/mass moved, assumi

    Jan 1, 1991

  • CIM
    Production Trends and Economic Characteristics of Canadian Gold Mines

    By M. Doggett

    All 231 Canadian primary gold mines that produced from 1946 to 2004 were analyzed with respect to their production and economic characteristics. Trend analysis revealed that the average annual capacit

    Jan 1, 2007

  • NIOSH
    OFR-97(1)-75 Quick Disconnect Couplers For Trailing Cables

    Three complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract

    Jan 1, 1974

  • AUSIMM
    Production of Aggregates in New Zealand û The Trends

    By J P. Ashby

    Compared with elsewhere in the world, New Zealand quarries have tended to be mostly small. The reasons for this are a combination of the relatively high transport costs, low population density and a p

    Jan 1, 1993

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

  • CIM
    Large adjustable-speed AC drives for the mining industry

    By G. Hausen, H. Micka

    "Modern signal and power electronics made adjustable-speed AC drives technically feasible and reliable and economically attractive. Cycloconverters are discussed as a proven technology for mine hoists

    Jan 1, 1988