    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Bearing Capacity Of Piles Using Cavity Expansion Theory ? Summary

    By R. Bellotti

    The theory of cavity expansion in an infinite frictional soil mass whose strength is represented by a curved Mohr-Coulomb failure envelope has been used to predict with some confidence the cone resist

    Jan 1, 1987

  • AUSIMM
    Iron-Titanium Oxide Minerals from the Giles Complex, Central Australia

    A study of the accessory opaque iron-titanium oxide minerals of the Oiles Complex, central Australia, was an Important complement to an investigation of the magnetic properties of the Complex. These m

    Jan 1, 1971

  • SME
    Processing researchers continue efforts to streamline US mining

    By P. Rosten

    US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing

    Jan 5, 1985

  • NIOSH
    IC 6943 Design Of Small Wooden Head Frames ? Introduction

    By W. W. Staley

    This paper discusses the design of small head frames that will fill the needs of prospectors and small operators whose operations are conducted through shafts. The head frames considered were designed

    Jan 1, 1937

  • SAIMM
    Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - Synopsis

    By M. du Plessis

    This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar

    Jan 1, 2011

  • SAIMM
    Application Of Nanofiltration In Metal Recovery

    By I. W. van der Merwe

    Recently, a new kind of filtration has emerged, namely nano-filtration (NF). It is a membrane-based process which exhibits totally unique separation characteristics for dissolved salts as well as for

    Jan 1, 1998

  • NIOSH
    RI 3502 Time Study Analyses - Progress Report 3. Quarry Drilling ? Introduction

    By J. R. Thoenen

    In the summer of 1937 the authors began a series of time studies of the various processes employed in' the production of crushed stone. These studies, made at quarries situated in the eastern and

    Jan 1, 1940

  • TMS
    Hernan Videla Lira Smelter's Promising Future of the S02-Abatement Program

    By Germán Richter a

    To comply with the chilean air quality regulation requirements, the Hernan Videla Lira Smelter which is a custom smelter having to cope with a wide variety of concentrates, has developed a two-step mo

    Jan 1, 1996

  • AUSIMM
    Rock Mass Classification is Only Part of the Answer to Assess Raise Boring

    By J Wallis

    The stability of a raise bore is often assessed using the rock mass classification system published by McCracken and Stacey as a modification of the Q system. Often the assessment is done using a spre

    Jan 1, 2008

  • AIME
    Mine Models

    By H. H. Stoek

    MINE models have three distinct uses: 1. As exhibits in expositions and museums. 2. As exhibits in law suits. 3. As illustrations in teaching mining engineering. All three uses are in a sense educ

    Jan 4, 1917

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • SAIMM
    Hydraulic support instability mechanism and its control in a fully-mechanized steep coal seam working face with large mining height

    By F. T. Wang, Y. Yuan, S. H. Tu, X. G. Zhang

    Hydraulic support instability (HSI) is one of the most common causes of disasters in underground coal mining, posing a threat to the safety of mine workers and normal operation of the equipment. It is

    Jan 1, 2015

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • NIOSH
    Using Proximate Analysis to Characterize Airborne Dust Generation from Bituminous Coals

    By Steven J. Page, John A. Organiscak

    The amount of airborne respirable dust generated from break- age of different coals varies widely. This research was conducted to identify the facets of airborne respirable dust liberation from the co

  • AUSIMM
    Cuprous Hydrometallurgy Part VII. Separation and Purification of Copper(I) Chloride from a Chlorination Roast of Kambalda Nickel Matte using Solutions of Aqueous Acetonitrile

    By Parker A. J, Muir D. M

    Solutions of acetonitrile in water dissolve water soluble copper(I) chloride. Removal of volatile acetonitrile from the resulting solutions, by distillation with low grade steam, precipitates pure cop

    Jan 1, 1980

  • AUSIMM
    Sulphuric Acid Production at Port Pirie

    The production of sulphuric acid at Port Pirie by the contact process began in March 1924 with the commissioning of the Electrolytic Zinc Co.'s roasting and acid plant. This plant, operated by B.

    Jan 1, 1956

  • AUSIMM
    Borehole Ropeways at No 2 Ore Shaft, Mount Isa Mines Limited

    The No. 2 Ore-shaft, at Mount Isa Mines Limited, involving the use of boreholes as ropeways for the upper portion thereof, constitutes, we believe, a unique feature in hoisting installations. The bore

    Jan 1, 1939