Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Variación de parámetros de resistencia y deformabilidad de macizos rocosos basándose en dos criterios de falla y la influencia de la voladura: Aplicación a la minería superficial evaluando geostadísticamente la probabilidad de ruptura y la estabiliBy Luis Martín Tejeda
El presente texto señala cómo los parámetros geotécnicos de resistencia y deformabilidad pueden generar mayor confiabilidad en un estudio técnico. En este sentido, la literatura geotécnica indica que
Sep 19, 2006
 - 
                    
                Mount Morgan Limited Gold Clean-up Practice at Oxide MillAt the present time this plant is treating by direct cyanidation 1,000 tons of ore from Open Cut mining and dumps, and 1,200 tons of current flotation tailing obtained from the Sulphide Mill, per day.
Jan 1, 1939
 - 
                    
                Reverberatory Smelting Plant, Mount MorganDuring the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States
Jan 1, 1939
 - 
                    
                Recovery of Nickel and Cobalt by Pyrometallurgical Process of Waste from Producing Program of Nickel Metal Hydride BatteriesBy Hui Wang
With the great increasing use of nickel metal hydride batteries recently, the waste of this kind batteries have been paid for close consideration. For the main reason that the waste of the batteries c
Jan 1, 2009
 - 
                    
                Optimización del Sistema de Control para los procesos de Extracción por Solventes y Depositación Electrolítica en Planta LESDE ToquepalaBy Adrián Del Carpio
Desde 1995 la planta de Lixiviación de Toquepala desarrolló un sistema de control automático para los procesos de extracción por solventes y electrodepositación. Sin embargo, con el desarrollo de la t
Sep 12, 2011
 - 
                    
                25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction GroutingBy Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
 - 
                    
                Thermodynamic properties of magnesium chloride amminesA study of the thermodynamic properties of magnesium chloride ammines was carried out with the ultimate objective that the thermal decomposition of the hexammine MgCl2.6NH3 may prove successful on a c
Jun 13, 1905
 - 
                    
                The Blue Asbestos Deposits of the Hamersley Ranges (19c1a807-8e29-4e48-b49c-0186628feb0e)Crocidolite deposits in the Hamersley Ranges, NW. of Western Australia, occur over a length of 180 miles and a width of 20' to 30 miles. Their stratigraphic environment and mineralogy is comparab
Jan 1, 1964
 - 
                    
                Some Rb-Sr Measurements on Granites Near Mount IsaRb-Sr measurements on total-rock samples of granitic rocks from the Mount Isa region have confirmed the existence of two periods of granite-forming activity. The Kalkadoon Granite, together with the E
Jan 1, 1966
 - 
                    
                PROCESSAMENTO E SINTERIZAÇÃO DE UM COMPÓSITO CERÂMICO DE CoFe2O4-BaTiO3By Rosana Silva Xavier
Compósitos magneto-elétricos (ME) combinam fases magnetostrictivas e piezoelétricas e podem ser utilizados na geração de energia a partir de vibrações e campos magnéticos presentes no ambiente, sendo
Aug 8, 2018
 - 
                    
                Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven PilesBy James A. Schneider
Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin
Jan 1, 2009
 - 
                    
                Institute of Metals Division - Intermediate Phase in the Uranium-Zirconium SystemBy A. N. Holden, W. E. Seymour
DURING the last several years, the U-Zr system has been studied at many laboratories as one of the research programs sponsored by the Atomic Energy Commission. The equilibria in part of this system ha
Jan 1, 1957
 - 
                    
                IC 8208 Loading And Transportation At Zinc-Lead Mines, The Eagle-Picher Co., Jo Daviess County, Ill. And Lafayette County, Wis.By William A. Beck
This report describes the loading and transportation practices employed at the zinc-lead mines of The Eagle-Picher Co., Jo Daviess County, Ill., and Lafayette County, Wis. The report also gives a brie
Jan 1, 1964
 - 
                    
                The Automatic Burning of CoalBy A. Ignatieff
"Demonstrations of Automatic Coal Burning EquipmentAT THE 1951 and 1952 Annual Coal Research Conferences sponsored by the Dominion Coal Board and attended by delegates from the Dominion and Provincial
Jan 1, 1953
 - 
                    
                IC 7526 Convetor Systems in Underground Iron-Ore Mines, Lake Superior DistrictBy Eugene O. Binyon
"Belt and shaker conveyors, used singly or as combined units, have for many years been an integral part of many coal-mine haulage systems. The belt conveyor has also been used extensively as a main ha
Oct 1, 1949
 - 
                    
                OFR-78(2)-80 Surface Mine Spoil Stability Evaluation Interior Coal Province - Volume II - Details Of Mine Visits & Detailed Procedures & Results Of Laboratory Testing (Appendix C)By Raymond P. Miller
This two volume report addresses slope stability of surface mine spoils within the Interior Coal Province. Sixteen (16) mines were visited, pertinent data and samples collected, and reported spoil ins
Jan 1, 1979
 - 
                    
                The Copper-Clay Deposits at Mount Lyell, TasmaniaThe copper-clay deposits consist largely of goethite and clayey mudstones carrying native copper, cuprite, and chalcocite. The mudstones are of Ordovician age, are interbedded with Fe-Mn carbonates, a
Jan 1, 1969
 - 
                    
                Wainui Mill - Processing Gold Ores of the Thames AreaThe Wainui Mill was conceived as a 60 - 90 t/d central mill to process gold ores of the Thames area of New Zealand from small mines in the district. The ores of the region exhibit various degrees of r
Jan 1, 1986
 - 
                    
                Geología económica del depósito aurifero Alpacay, Arequipa, PerúBy Roxana Barrantes Huamán
El presente texto describe la geología económica del depósito aurífero Alpacay ubicado en Arequipa, Perú. El depósito Alpacay es un típico depósito mesotermal, filoniano que es explotado por la Cía Mi
Sep 12, 2011
 - 
                    
                Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement PileBy Jiwei Duan
The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon
Jan 1, 2002