Search Documents

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • NIOSH
    IC 9415 Network Flow Model Analysis Of The Impact Of Chlorofluorocarbon Phaseout On Acid-Grade Fluorspar

    By Jennifer A. Slatnick

    Chlorofluorocarbons (CFC's), once universally accepted as ideal compounds for use in cooling and refrigeration, in foam production, and in cleaning electronic components, are being phased out and

    Jan 1, 1994

  • CIM
    The Importance of High-Pressure Compressed Air to Mining Operations

    By A. R. Pasieka, J. C. Wilson

    "Compressed air still remains an essential source of power in underground hardrock mining. As a power medium it has a high convenience factor, although, in many cases, it is expensive to generate and

    Jan 1, 1966

  • NIOSH
    IC 8628 Bureau Of Mines Test Procedures For Rocks

    This Bureau of Mines report is a reference manual of procedures used by the Bureau's Twin Cities Mining Research Center for obtaining rock properties. Included in the report are discussions on th

    Jan 1, 1974

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • CIM
    COM 2014 Keynote: Process Control Applications in Mining & Metallurgical Plants Symposium Manual Control, Process Automation - Or Operational Performance Excellence? What is the Difference?

    "The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Jan 1, 2014

  • CIM
    The State of Art in Environmentally Sustainable Nickel Smelting: Boliden Harjavalta Nickel Smelter

    By P. Pyykkö, E. Peuraniemi, J. Järvi, P. V. Latostenmaa, V. Törölä, S. Junnikkala

    "Nickel concentrate smelting started in Harjavalta in 1959. First, flash smelting - Peirce-Smith converting route was applied, and the high-grade converter matte was further refined to nickel cathodes

    Jan 1, 2014

  • DFI
    Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles

    By Mike Muchard

    Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an

    Jan 1, 2000

  • CIM
    Regional geochemical mapping for earth science and environmental studies

    By R. B. Barlow, J. A. C. Fortescue

    Originally developed for use in mineral exploration, regional geochemical mapping based on stream (and lake) sediment sampling is showing broader application in other areas of the earth sciences and i

    Jan 1, 1980

  • CIM
    Explore the Future of Mining

    By Joe Shoemaker

    Automated Spot Generation ? No Operators below the Highwall ? No Operator Wear and Tear ? Reduced Swing Time ? Single and Double Sided Loading ? Minimized Bench Width

    Aug 1, 2013

  • IIMP
    Aplicación del sistema de gestión Hochschild Mining DNV

    By Carlos Virrueta Zevallos

    El presente texto describe los lineamientos necesarios para construir un sistema de control de perdidas sólido en la Corporación HOCHSCHILD MINING DNV, el cual se basa en un liderazgo, compromiso y a

    Sep 12, 2011

  • NIOSH
    OFR-178(1)-82 Mine Power Systems - Volume I

    By Lloyd A. Morley

    This seven-chapter document is the first volume of a two-volume report that presents a comprehensive outline of coal-mine electrical power systems from theory to practice. Together, the two volumes co

    Jan 1, 1982

  • AUSIMM
    Risk Management in Minerals Procurement

    The nature of the specialty glass and ceramic business magnifies the dependency of the ultimate product on the unique properties of their raw materials used to make them. This dependency has implica

    Jan 1, 1989

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • SAIMM
    System Ductility Of Long Fibre Reinforced Shotcrete

    By H. A. D. Kirsten

    Shotcrete has become a strategic component of support in underground mines. The ductility of reinforced shotcrete makes it a safe and economic means of surface support under adverse static and dynamic

    Jan 1, 1998

  • CIM
    Integrated Experimental and Modelling Research on Copper-Making Slags

    By Sergei Decterov, Peter Hayes, Evgueni Jak, Taufiq Hidayat, Denis Shishin

    Copper smelter operations around the world are under sustained pressure to reduce costs and increase output. Through the provision of reliable data on fundamental properties of the chemical systems th

    Jan 1, 2014

  • CIM
    Lessons Learned from Measuring and Monitoring the Social License to Operate

    By Ian Thomson

    The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac

    Aug 1, 2013

  • CIM
    Finite Element Evaluation of the Residual Stress Fields Obtained by Hole Expansion on 6061-T6 Aluminum Welds

    By K. C. Viveros, R. R. Ambriz, C. García, F. De Villèle, A. Talha, D. Jaramillo

    Cold hole expansion on base metal, weld metal and heat affected zone of 6061-T6 aluminum alloy welds was simulated by means of finite element method. Three dimensional compact test models with a previ

    Jan 1, 2014

  • NIOSH
    Considerations For Using Roof Monitors In Underground Limestone Mines In The USA

    By Stephen C. Tadolini, Thomas E. Marshall, Cecil Banta, L. J. Prosser, Anthony T. Iannacchione

    The Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) endeavors to provide national and world leadership in the prevention of work-related illness, in

  • SME-ICGCM
    Seismic Tomography, an Ideal but Immature Tool for Coal Bump Prediction

    By Erik Westman

    Coal bumps remain one of the industry?s most devastating but least understood phenomena. If changes to the internal conditions of the rock mass could be observed there is hope that bumps could be fo

    Jan 1, 2008