Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    In Situ Strength Testing of Rocks with the Borehole Penetrometer

    By Kot F. von Unrug

    One of the major difficulties in the proper characterization of rocks surrounding excavations is the lack of data. The existing method for strength determination requires core drilling for sample coll

    Jan 1, 1998

  • SME-ICGCM
    Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground Conditions

    By Kirk W. McCabe

    RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un

    Jan 1, 1981

  • SME-ICGCM
    Field Test with Strain-gauged Friction Bolts at the Gold Hunter Mine, Mullan, Idaho, USA (f62ddf9f-aabd-4681-8d92-4a50602e035c)

    By Jeffrey Johnson

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

    Jan 1, 2003

  • SME-ICGCM
    Strata Movement Around Large Mining Height Face Area with Fully Mechanized Method in Steeply Dipping Thick Seam

    By Yongping Wu

    The steeply dipping coal seams in this paper refer to those with the angle of inclination ranging from 35° to 55°. The reserves of the steep coal seams account for approximately 15%~20% of the total c

    Jan 1, 2014

  • SME-ICGCM
    Spatial Trends In Rock Strength - Can They Be Determined From Coreholes? (51393e91-3e75-4a8d-ac36-e107a993fe35)

    By Christopher Mark

    Mine planning for a new reserve is based on information obtained from exploratory coreholes. A critical component of an exploration program is the geotechnical evaluation. Poor assumptions about roof

    Jan 1, 2004

  • SME-ICGCM
    Gob Canopy Roof Support for Difficult Natural Conditions

    By Jay Hilary Kelley

    This paper proposes a modification of longwall roof support to meet new difficult mining conditions that are anticipated in the future. A gob canopy is a movable appendage attached on the rear of a lo

    Jan 1, 1997

  • SME-ICGCM
    Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof Support

    By Dale A. Didcoct

    Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c

    Jan 1, 1982

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic Survey

    By Wolfgang Schott

    The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h

    Jan 1, 2003

  • SME-ICGCM
    Violent Coal Pillar Collapse -A Case Study

    By André Zingano

    Pillar collapses have been studied for several years and can be classified into two types: nonviolent squeeze or violent pillar collapse, i.e., controlled or uncontrolled pillar collapse. Underground

    Jan 1, 2004

  • SME-ICGCM
    Ground Deformation In The Case Of Underground Mining Of Thick And Dip Coal Seams In The Jiu Valley Basin

    By Gheorghe Oncioiu

    The phenomena developed on the influence of thick coal seam no.3 mining, by horizontal slices and rocks caving roof control, in the Jiu Valley coal basin, are very complex. By analyzing the influence

    Jan 1, 1999

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    Remote Control Roof Bolting

    By Cosmo P. Fazio

    Remote control roof bolting is approaching reality with the continued improvement of a number of components and subsystems being developed by The Bendix Corporation under sponsorship of the U.S. Burea

    Jan 1, 1982

  • SME-ICGCM
    A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate Road

    By Stephen P. Signer

    A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r

    Jan 1, 1990

  • SME-ICGCM
    Seismic Events Due To Underground Mining Activities

    By R. Fritschen

    In order to investigate locations, source parameters, and source mechanisms of mining induced seismic events, a local network of seismic stations was installed at a coal mine in the eastern part of th

    Jan 1, 1999

  • SME-ICGCM
    Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case Study

    By Danny J. Van Roosendaal

    An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain

    Jan 1, 1995

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    Systems Used In Coal Mining Development In Long Tendon Reinforcement

    By Brian Clifford

    A wide range of different cablebolt systems are available and in use in hard rock and coal mines around the world. The birdcaged cablebolt was initially used in UK coal mines in conjunction with ro

    Jan 1, 2001