Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021By Jürg Künzle
The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m
Jun 13, 2021
-
A Case Study in Successful Progressive Design Build Tunneling - RETC2023By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and
Jun 13, 2023
-
Improvement of Precast Concrete Segmental Lining by Post-Tensioned StrandsBy Behzad Khorshidi
"The ultimate objectives of the post-tensioned strands are to connect the precast segments into a ring and provide pre-stress in the tunnel circumference. The method involves inserting the strand thro
Jan 1, 2016
-
Application Of Solution Mining To The Recovery Of PotashBy W. H. W. Husband
Rock salt has been mined by the solution method for many years in many countries. Attempts have been made in the past in Canada and various other countries to produce potash by the' same method.
Jan 1, 1971
-
Use Of Quarry Fines To Make A Construction AggregateBy S. C. Gaillard
Tailings are made of ground rock that is left over from removing valuable minerals. The tailings are usually fine particles that cause environmental issues for storage and disposal. Disposal of tailin
Jan 1, 2013
-
Mine production scheduling optimization at Newmont?s Twin Creeks Mine (7465774a-78ae-4d2d-b25a-11e1b6274c11)By P. Kawahata
Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on-site facilities depending on ore type
Jun 1, 2013
-
Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical ApproachBy Sunil Bodakunta, Sreenivasa Rao Islavath
The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu
Apr 28, 2022
-
Rigid Foam For Mine VentilationBy G. L. Alston
Rigid urethane foam can be used effectively for improving mine air conditioning systems by reducing heat and moisture transfer from mine rock to ventilating air and from mine rock to ventilation ducts
Jan 1, 1963
-
Forty Year History of Testing at NIOSH’s Mine Roof Simulator. What have we learned?By Timothy J. Matthews, Timothy J. Batchler, Daniel J. McElhinney
The National Institute for Occupational Safety and Health’s (NIOSH) Mine Roof Simulator (MRS) at the Pittsburgh Mining Research Division was commissioned for operation in 1981. The MRS was originally
-
Texas Gulf Sulphur Beneficiation Of North Carolina PhosphateBy Thomas J. Wright
The evaluation and development of the Eastern North Carolina phosphate deposit resulted in one of the world's largest and most modern phosphate mines and fertilizer complexes at an investment in
Jan 1, 1971
-
Promising options for solving the dolomite problem of the Florida phosphate resources—A brief reviewBy Dapeng Zhang, Brij Moudgil, Shibo Zheng, Chunhui Feng, Wenyi Song, Wending Xiao, Patrick Zhang
The separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. More than 50 percent of the phosphate reserve in Florida contains too much dolomite to proces
-
Feasible Bioprocessing Technologies for Low-Grade Iron OresBy H. X. Li, A. Correa, M. M. Zhang, W. Xuan, M. Andrade
"With increasing demand for steel and depletion of high-grade iron ore deposits, more research efforts are being directed toward extending the life of existing ore reserves and developing technology t
Jan 1, 2015
-
The New St. Mary?s Cement Company Plant A Development In Dry Process TechnologyBy J. O. Down
St. Marys Cement Company operates two cement plants in Southern Ontario, Canada. The original plant, located at St. Marys, a town 20 miles north of London, Ontario, began operations in 1912. A second
Jan 1, 1977
-
Mine Development - Resolution Copper: A Showcase For The Rio Tinto PhilosophyJust 104 km (65 miles) from Phoenix, AZ, Rio Tinto hopes its new Resolution Copper Mine will be a showcase for the Rio Tinto management philosophy. Its goal is to have a net positive impact. In every
Jan 1, 2010
-
Novel technology methods of enterprise unmanned traffic management (E-UTM) solutions for miningBy Aimee A. Woolsey
Enterprise unmanned traffic management (E-UTM) is a holistic system concept evolving from technological developments in radio frequency (RF), where dynamic tracking can be added into current and emerg
May 1, 2023
-
Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
An Integrated Method to Classify Ground-Fall Accidents and to Estimate Ground-Fall Trends in U.S. Mines Using Machine Learning Algorithms - SME Annual Meeting 2024By Yuting Xue, Gamal Rashed, Zoheir Khademian, Connor Brown, Khaled Mohamed
Ground falls in U.S. underground coal mines can lead to significant consequences, including loss of life, injuries, damaged equipment, and production stoppage. Improving the safety of the workplace is
Feb 1, 2024
-
Advancements in removing fluorine from copper concentrateBy Shangyong Lin, Wei Sun, Weiping Liu, Muhammad Azam, Junfeng Cheng, Yujie Zhao, David Asubonteng, Michael Ngoie
Copper concentrates have wide application in global smelting operations, comprising primarily of chalcopyrite (CuFeS2) as the principal mineral, accompanied by chalcocite (Cu2S) and bornite (Cu5FeS4)
Jan 1, 2024
-
Increasing Effectiveness of Mine Safety Training Using Inexpensive Camera and Rendering TechnologyBy M. A. Trevits, G. Frampton
"Mine safety training materials have long included pictures of mine conditions, equipment, hazards, etc. These images are invaluable to both the trainee and the trainer to convey many important concep
Jan 1, 2018
-
An Integrated Mine Plan: Connecting Long-, Medium- And Short-Term Planning`By Vivas
Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp?s flagship operation is Peñasquito, a world class, polymetallic deposit that star