Updated Study of a Low Overburden Longwall Recovery with Pre-Developed Recovery EntryBy J. C. Stankus, R. Ochsner, B. Hanson
"Bull Mountains No. 1 mine of Signal Peak Energy made another success in its 4 Right pre-developed recovery entry on March 23 and 24, 2015, after the first successful cut-through and shield retrieval
Jan 1, 2016
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Development Metallurgy Guidelines for Copper Heap LeachBy J. E. Dreier, R. E. Scheffel, A. Guzman
"This paper outlines a comprehensive, cost-effective testing program for the acid-ferric sulfate heap leaching of oxide, supergene and primary copper ores. It is based on extensive experience in coppe
Jan 1, 2016
-
Applications of Wireless Indoor Positioning Systems and Technologies in Underground Mining: a Review - Mining, Metallurgy & Exploration (2021)By Rushikesh Battulwar, Javad Sattarvand, Joseph Seamons, Masoud Zare
In the last decade, new developments took place in the area of indoor positioning (or localization). Since the Global Navigation Satellite System (GNSS) cannot be used in underground mines, other tech
Sep 5, 2021
-
Simulation of Thermal Effects on the Flow Field in a Pilot-Scale Kiln - Mining, Metallurgy & Exploration (2021)By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG
The flow field and coal combustion process in a pilot-scale iron ore pelletizing kiln is simulated using a computational fluid dynamics (CFD) model. The objective of the work is to investigate how the
Apr 20, 2021
-
Roof and Ground ControlBy Robert Stefanko
13.1-SUBSIDENCE AND GROUND MOVEMENT ROBERT STEFANKO 13.1.1-SUBSIDENCE AND FAILURE This treatment of subsidence and ground movement will be confined to subsidence control for limiting surfac
Jan 1, 1973
-
Opencast Mining Of Brown Coal In Eastern Europe (53316393-306c-401a-9c67-5ad911520cfd)By Yoginder P. Chugh
Most mines are large producing 0-25 mmt annually. The coal is mine.) at depths ranging from .0-150 m 120-500 ft mining at 300 m .(,1000 ft) depth is anticipated in the future. Single and multiple seam
Jan 1, 1980
-
Myths In Grinding Mill Q.A. -Uncovering The Costs (ae289d48-02bd-40c1-b9cd-43039ca5a205)By V. Svalbonas
The process of grinding mill quality assurance brings with it associated truths and myths. When the mill quality assurance process took its first great steps forward in the late 1970s and early 1980s,
Jan 1, 1999
-
The Alumbrera Pipeline, World's Longest Copper Ore Concentrate Sluny PipelineBy Fred Morelko, Michael Connelly, Brad L. Ricks
INTRODUCTION The $1.1 billion Bajo la Alumbrera Project, started up in 1997 by Minera Alumbrera Limited in the Catamarca Province of Northwestern Argentina, is the first large scale modern mining p
Jan 1, 1998
-
Development Of A Fiberglass Cable BoltBy D. A. Peterson
Laboratory testing was completed to determine the effectiveness of a fiberglass cable bolt (FCB) as a cuttable rock support for a continuous, hard-rock mining method. The FCB consists of four Polystal
Jan 1, 1993
-
Ground rippability classification by decision trees - SME Transactions 2015By E. Siami-Irdemoosa, S. R. Dindarloo
Ease of excavation or rippability, also called diggability or excavatibility, is a critical decision-making parameter in the selection of both the overburden removal method and the required equipment
Jan 1, 2015
-
Surface Mine Blasting Near Transmission PipelinesIndustry and regulatory agencies have requested guidance on safe blasting near transmission pipelines. The US Bureau of Mines (USBM) and Amax Coal Co. studied surface coal mine overburden blasting nea
Jan 1, 1995
-
The Effect of Overburden Depth on Casing Deformations of Shale Gas Wells in Longwall Chain Pillars—Recent Mine-by ExperiencesBy Peter Zhang, Daniel Su, Berk Tulu, Bo Hyun Kim, Zoheir Khademian
Over 2,000 shale gas wells have been drilled in the Pittsburgh Seam longwall reserves. As longwall panels are laid out, some of these shale gas wells must be located in longwall chain pillars. With lo
Jun 25, 2024
-
Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024By Andrew Chegwidden, Tara Wilk
Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m
Jun 23, 2024
-
Heap Leach Solution Application At Coeur-Rochester (b25c6c16-b3b4-42ec-816f-c1af312bfe3e)By A. L. Wilder
Coeur d'Alene Mines Corporation's newest precious metals property is located in the old Rochester Mining District approximately twenty-five miles northeast of Lovelock, Nevada. Built at an e
Jan 1, 1988
-
Analysis of Effect of Waterhead on Stability of Excavation Face of Slurry Balanced ShieldBy Ming-yi Zhang, Zhong-nian Yang, Xiao-ming Guan, Quan-wei Liu
"In slurry balanced shield tunneling, how to ensure the safety of construction and to reduce the influence on the environment has arisen wide attention of scholars both at home and abroad. But now it
Jan 1, 2016
-
The Efects of Rock Mass Strength and Joint Orientation on Pillar Stability in Underground Coal MinesBy S. M. Hossaini, M. Ataei, H. Moosavi
The abstract highlights the importance of pillar stability in underground coal mines and the influence of rock mass strength and joint orientation on pillar behavior. The study employs numerical model
Apr 4, 2022
-
3. Computer-Assisted Mineralization Modeling at Kennecott Copper Corporation ? IntroductionBy R. K. Davey
Before the introduction of computerized procedures, mineralization modeling (compilation of level maps), ultimate pit studies, ore reserve compilations, and long-range mine planning all were performed
Jan 1, 1979
-
3.3 Open-Pit Limits Analysis - 1. Technical OverviewBy Y. C. Kim
One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi
Jan 1, 1979
-
2022 MPD Student Poster Contest – Winning AbstractsBy Qingqing Huang, Mohammad Rezaee
The Mineral & Metallurgical Processing Division (MPD) of the Society for Mining, Metallurgy & Exploration held the 12th MPD Student Poster Contest on March 2, 2022, during the MINEXCHANGE 2022 SME Ann
Nov 22, 2022