Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ventilation And Climate Simulation Of Development Ends In Metal MinesBy P. Rostami
It is important to study the ventilation system in order to better design and control of the working environment in deep underground mines. With increasing depth, heat, and humidity performance may be
Jan 1, 2011
-
Mine Safety & Health - SME StatementEmployee safety and health is of paramount importance for SME and its members. Many SME members work daily in our Nation's mines or have a direct impact on others that work in the mines. SME s
Jan 1, 2011
-
Three-Dimensional Cfd Modeling Of Purging From Refuge ChamberThe MINER Act of 2006 mandated that all underground coal mines must install and maintain refuge chambers. Refuge chambers serve as a temporary shelter in case of emergency. Several factors affect the
Feb 27, 2013
-
New Technology Changes Blind Shaft DrillingBy Alan Zeni
Blind shaft drilling equipment has not changed substantially since the 1970s. Since it resides in a niche market between conventional shaft sinking and raise boring, the relatively small demand has re
-
How Safe Are Your Recent Mills? The Compatibility Between FEA And Welding CodesBy V. Svalbonas, M. Fresko
The present versions of the Welding Codes, such as BS7608, have long been known to be compatible with hand computations of membrane and bending stress, rather than detailed finite element solutions.
Jan 1, 2002
-
Preliminary Guidelines For Construction Of Large, Deep Underground CavernsBy W. G. Pariseau
Introduction Caverns of 50 m in linear dimension at depths below 2300 m with a life of more than 25 years are proposed for the next generation of water-filled neutrino detectors. Little precedent ex
Jan 1, 2006
-
Hobson And Rosedale Tunnels?New Technology In AucklandBy Harry Asche
The last 12 months has seen the construction of the first Earth Pressure Balance (EPB) TBM excavated tunnel in New Zealand on the Project Hobson sewer storage tunnel for Watercare Services Limited, wi
-
Impact of air velocity and support advance on shield-generated dustSteady increases in longwall production have required operators to apply greater quantities of ventilating air in an effort to control and dilute respirable dust. Significant increases in shearer spee
Jan 4, 2010
-
Rock Mechanics Applications To The Design Of Oil Shale Pillars ? IntroductionBy Jose F. T. Agapito
The mining engineer must be able to predict the structural behavior of the rock around underground openings so that he can answer questions relating to safety and economics. With the present status of
Jan 1, 1974
-
A Dissolution Kinetic Model For Metal Powders A Case Of Varying Surface AreaBy Kenneth N. Han, Peter Nam-soo Kim
A kinetic model for leaching of particulate metals in a batch system has been developed. The leaching mechanism has been analyzed by solving a series of ordinary differential equations relating hetero
Jan 1, 2005
-
Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero EmissionsBy Tuncel M. Yegulalp, Anuta Belova
This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu
Jan 1, 2005
-
Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage ProjectBy Pratoomkhuan N. Lertsgoon
A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study
Jan 1, 2003
-
Sustainability For Nature And MankindBy M. Javier
Defining the concept of sustainability is an important step for industry and society. It is necessary in order to clarify what it means when debunking the many misinterpretations pervasive in differe
Jan 1, 2012
-
Myths In Grinding Mill Q.A. — Uncovering The CostsBy V. Svalbonas
The process of grinding mill quality assurance brings with it associated truths and myths. When the mill quality assurance process took its first great steps forward in the late 1970s and early 1980s
Jan 1, 1999
-
Pogo Mine Control System: A Hybrid of DCS and PLCThe Pogo Mine, near Delta Junction, Alaska is a new 2500 STPD gold operation. The control system of the mine and milling operations are a hybrid of DCS (Distributed Control System) control and PLC (Pr
Jan 1, 2008
-
Rare Earths: A Magnet Producer?s Perspective - IntroductionBy S. Constantinides
Over the past 100 years we have witnessed a revolution in permanent magnetic materials. Prior to 1932 electrical machinery depended upon steels for both the soft and the permanent magnet structures.
Jan 1, 2011
-
Tom O’Neil: An Interview With the 2003 SME PresidentThe status and outlook for mining, in your view. Minerals remain a major part of the world’s economic foundation. The fortunes of the mining industry rise and fall with general economic trends, but m
Jan 1, 2003
-
Improvement On Mathematical Model For Studying Coal's Propensity Of Spontaneous Combustion (dd449287-9a34-46ab-911e-758c3fb8cfd4)By Xinyang Wang
It is believed that sulfur and volatile matter contents in coals are the main intrinsic properties to cause the self-heating of coal. Their oxidation at lower temperatures than that of fixed carbon to
Jan 1, 2013
-
Mine Production Scheduling Optimization At Newmont?s Twin Creeks MineNewmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore
Feb 27, 2013
-
Use Of Geologic Parameters For The Development Of Low-Grade Copper Reserves, Silver Bell Mine, AZBy Q. J. Browne, M. A. Miller
Silver Bell produces about 22,000T of fine copper annually from low-grade chalcocite and oxidized copper ore that is recovered by sulfuric acid leaching and SX-EW processing. The current mineable res
Jan 1, 2002