Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Energy Partitioning Following Tensile Failure in Three-Point Loading Tests of Nugget Sandstone Specimens "Mining, Metallurgy & Exploration (2020)"By J. M. Wempen, R. D. WEYHER, M. K. McCarter
Beam theory is a proxy for the behavior of intact, deforming roof strata above underground openings. Strong, stiff, intact strata have the ability to store significant strain energy when underground o
Jul 1, 2020
-
Exploration: Both a Boom and Bust Year - 1980 Annual ReviewBy Paul Russell, M. M. Kimberley, Erick F. Welland, Louis Cope, C. C. Mosher, William M. Shepard, William C. Larson, Graham Closs
Exploration activities in 1980 felt the effects of unstable economic conditions and oscillating metal prices. In the cyclical, boom-or-bust precious metals and uranium markets, precious metals activit
Jan 5, 1981
-
The Discovery, Evaluation And Development Of Gold Occurrences At The Dome Mine, South Porcupine, Ontario - A Working Model For Archean-Type Deposits (7c07f7ef-a02a-49ca-85f9-92f9b8e390e0)By Dean S. Rogers
The conventional role of exploration, development and grade control is examined in this paper within the context of the many and varied types of gold occurrences which are found at the Dome Nine. The
Jan 1, 1984
-
Spatial aspect of long-term openpit mine sequence optimization - SME Transactions 2015By R. Halatchev
This paper treats the spatial aspect of mine sequence optimization, revealing it in the context of determining the optimum number of cutbacks of an openpit mine. Cutback mining is currently a dominant
Jan 1, 2015
-
Openings for Nonmining PurposesBy Madan M. Singh
This section is unique to the Handbook in that it is the only section that deals with underground excavations for nonmining purposes. The editors were of the opinion that the section should be incorpo
Jan 1, 2008
-
Search For Candidates For Sales Comparison Approach In Non-disclosure States - SME Annual Meeting 2022By J. Gustavson, E. Mallard, F. Pirkle
The Sales Comparison Approach to estimating the value of a mineral property must always be attempted1 . In addition to other parameters, the approach depends heavily on the availability of transaction
Mar 2, 2022
-
Wetting The Coal Face For Dust Control In Longwall Mining At High Ventilation Air SpeedsBy J. -G. Swanson
Dust control in longwall coal mining depends primarily on the prevention of dust at the source and secondarily on the suppression of airborne dust. One of the primary methods for the prevention of du
Jan 1, 2012
-
Measurement of Overburden Failure Zones in Close Multiple-Seam Coal MiningBecause of its small interburden thickness, concentrated stress distributions, high coal seam metamorphism, and complex geological conditions, mining the five coal seams (Nos. 5, 7, 8, 9 and 12) of Ka
Jan 7, 2020
-
Development of Mine Haul Road Surfacing Condition Monitoring Through Digital Image Processing (SEPTEMBER 2015 Mınıng engıneerıng)By S. Pastor, S. Hahn
"As the concept of autonomous haulage systems (AHS) moves from prototypes to production-ready applications, the operating performance of the haul road will become critical to the overall success of au
Jan 1, 2015
-
Stress Redistribution in a Longwall Yield Pillar — a Comparison between Active Seismic Tomography and Theory (Mining, Metallurgy & Exploration)By Jessica M. Wempen, William G. Pariseau, Dallan J. Coons, Michael K. McCarter, Erik C. Westman
The abstract discusses the importance of proper pillar sizing in underground mining for safety and efficiency. It highlights the use of theoretical models, geotechnical measurements, and numerical mod
Mar 18, 2022
-
China’s Coal Industry at the CrossroadsBy Jerry C. Tien
Changes and the pace of change in China’s coal industry have been extraordinary during the past several years. At least 35 of the 94 former coal bureaus have been restructured into different mining c
Jan 1, 2003
-
Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO ProjectBy J. Chae, D. Pecha, R. Andrews
The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro
Jan 1, 2005
-
Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, CaliforniaBy David Young
This paper presents tunnel design considerations for the SR75/282 Transportation Corridor Project in Coronado, California. The project is managed by the City of Coronado in cooperation with Caltrans a
Jan 1, 2008
-
Owner Procured Tunnel Boring Machines––A DiscussionBy A. R. Biggart, A. Walters, G. J. E. Kramer
The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma
Jan 1, 2005
-
A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi CrossingBy Chester M. F. Peters
The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first
Jan 1, 1997
-
Cost And Production Analysis For Haulback Contour MiningBy J. H. Gasper
A cost analysis for two alternative contour mining methods is performed to compare their results. The methods evaluated are: 1) Front-End Loader/Truck Haulback and 2) Scraper Haulback. Before performi
Jan 1, 1992
-
Planning for the Drumanard Highway Tunnels, KentuckyBy Lawrence Williamson, Randall J. Essex, David P. Field
As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or
Jan 1, 2005
-
The Design Of Slope Stability Monitoring Systems ? 1. IntroductionBy Iain Weir-Jones
The efficient operation of an open pit mine presupposes that the slopes are maintained at an angle which closely approaches that of the ultimate stability of the slope. In order to do this in a safe m
Jan 1, 1975
-
Novel Flocculants For The Treatment Of Oil Sand TailingsTwo new inorganic-organic hybrid polymers, Al(OH)3-polyacrylamide (Al(OH)3-PAM) and Mg(OH)2-polyacrylamide (Mg(OH)2-PAM) were synthesized and successfully applied for the treatment of oil sand tailing
Jan 1, 2012
-
The Effects of Rock Mass Properties on Explosive Energy in Rock BlastingBy Yashar Pourrahimian, Magreth S. Dotto
Fragmentation by blasting is a critical process in hard rock mining. The blasting process and outcomes are highly influenced by rock mass properties and their response to higher stresses and loading r
Jun 25, 2023