Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A finite-element method model for a ferromanganese and silicomanganese pilot furnaceBy V. K. Risinggård, M. Sparta
We report on the development of a finite-element method model for a pilot furnace for the production of manganese alloys. The model is a multiphysics model that addresses material flow, electrical con
Apr 16, 2024
-
Optimizing of gas-shielded metal arc welding parameters for 10.5-12.5% chromium steel using 308L electrodesBy J. W. van der Merwe, A. M. Maleka, V. J. Matjeke
The 10.5–12.5% chromium, titanium-stabilized ferritic stainless steel (FSS) plates used to fabricate coal line jumbo wagons is susceptible to undesirable chromium depletion during welding with 309L el
Apr 5, 2023
-
Determining the expected and actual measurement performance of a by-line element analyser on a final product stream at Exxaro’s Grootegeluk 7 & 8 plants, H.N. Engelbrecht and M.V RoperBy and M. V Roper, H. N. Engelbrecht
Quality control interventions emanate from process upsets and trends that move product quality beyond the natural variation expected in a stable process. The ability to detect upset conditions and rea
Jan 1, 2020
-
Business Optimization for Platinum Mining Projects and OperationsBy P. J. Petit
"The complex planning required to achieve any planned production yields multiple and dissociated responses over the life of project (LOP). The customary decision-making process negates the possibiliti
Jan 1, 2016
-
The Impact Of The Draft Mineral And Petroleum Resources Royalty Bill On Gold Mine ReservesBy FT Cawood
The latest Draft MPRRB was released for public comment in October 2006. The main purpose of the Bill is to collect royalties at mines developed in terms of new-order mineral rights granted through the
Jan 1, 2007
-
Flyrock in surface mining–Part 3: Shock wave, stress wave, blasthole expansionBy T. Szendrei, S. Tose
The generally accepted view in rock blasting is that the sources of energy for the fracture and movement of rock reside in the shock wave and gas action resulting from the explosion, and yet the mecha
Oct 9, 2024
-
Investigation of the mechanism for fireside corrosion in coal-fired boilers in South AfricaBy J. W. van der Merwe, K. G. Moloko
Furnace wall tubes from 600 MW subcritical boilers at three coal-fired power stations were sampled and the fireside deposits examined to determine the mechanism of fireside corrosion. This involved an
Jun 1, 2021
-
An integrated approach to panel width, fleet size, and change-out time optimization in room-and-pillar minesBy E. Córdova, A. Anani, W. Nyaaba
Optimization of panels, haulage fleet, and waiting area involves deterministic and low-fidelity methods and experiential knowledge. The process is challenging because coal recovery and operational cap
Apr 2, 2022
-
Preliminary assessment of coal blend quality combining gammaray spectrometry and magnetic susceptibility: A case study of the Sabinas Basin, MexicoBy J. A. Batista-Rodríguez, F. J. López-Saucedo
A new methodology is proposed for the preliminary assessment of coal blend quality, which combines gamma-ray spectrometry and magnetic susceptibility measurements. This methodology does not replacethe
Apr 2, 2022
-
Preventing another health tragedy: A framework to manage diesel particulate matter in underground minesBy J. D. Swanepoel, S. Horn, C. J. Badenhorst
Diesel particulate matter (DPM) is the particulate component of diesel exhaust, which includes diesel soot and aerosols. When released into the atmosphere, DPM can take the form of individual particle
Mar 5, 2025
-
Geotechnical Data Analysis to Select a Feasible Method for Development of a Long Axis, Large Diameter Vertical Ventilation ShaftBy E. J. Walls, W. C. Joughin
"In selecting a suitable method to sink a vertical shaft for underground access, a number of constraints influence the ultimate decision of where and how to develop the shaft, not least among these be
Apr 1, 2019
-
The concentration of rare earth elements from coal fly ashBy G. B. Abaka-Wood, J. Addai-Mensah, W. Skinner
Recently, coal fly ash has become a potential candidate as a secondary resource of rare earth elements (REE). In this investigation, we studied the recovery of REE from fly ash from a commercial power
Jan 2, 2022
-
The Renard Project Building A Canadian Diamond Resource BaseBy D. Skelton
The Renard kimberlite cluster is located in the Monts Otish region of Quebec, Canada. A Canadian National Instrument (NI) 43-101 compliant resource statement for the Renard kimberlites 2, 3, 4 and 9 a
Jan 1, 2010
-
Using laser scanner face mapping to improve geotechnical data confidence at Sishen mineBy T. M. Russell
"Face mapping is a simple but invaluable means of geological and geotechnical data acquisition whereby intact rock properties, rock mass properties, discontinuity properties, and structural orientatio
Jan 1, 2018
-
A Conceptual Study Into Optimizing The Delivery Of Trackbound Twin Ends Through Trackless Mechanized DevelopmentBy D. Nardini
The need to move towards faster and safer mine development is a key priority in mining houses globally. In addition to this, South Africa faces an array of challenges introduced by labour-intensive op
Jan 1, 2012
-
Probability of failure and factor of safety in the design of interramp angles in a large open iron ore mineBy A. F. Silva, R. Dockendorff, J. M. Girao Sotomayor, V. F. Navarro Torres, C. Castro
This paper shows the importance of performing probabilistic analyses in open pits, especially for mine planning, which can lead to more efficient ore extraction and meeting the acceptability criteria
Jul 2, 2022
-
Reflections on Narrow-Reef Platinum Mining Pillar Design Systems as Applied to a Large Platinum Exploration Feasibility ProjectBy J. N. Van der Merwe
"Platinum is a highly valuable resource, its safe and economic extraction is paramount. The success of platinum mining by the bord and pillar method depends heavily on a comprehensive and dependable p
Jan 1, 2017
-
Strapping of Pillars with Cables to Enhance Pillar StabilityBy J. Arzuúa, U. Castro-Filgueira, L. R. Alejano, F. Malan
"Pillar design for underground mining is typically done using empirical formulae or numerical modelling. Practical experience and recent literature, nevertheless, illustrate the shortcomings of these
Jan 1, 2017
-
Case Study: Using Software Optimization Techniques For The Optimal Allocation Of Equipment In A Mechanized Underground Mining EnvironmentBy D. Kok
A challenge in mine planning is the optimal allocation of resources to the appropriate workplaces within the shift cycle (labour, equipment type, and other resources) in order to carry out the shift c
Jan 1, 2012
-
Plasma soup for the pyrometallurgist’s soulBy B. S. Xakalashe, I. J. Geldenhuys, B. Bowman, M. W. Erwee, G. A. Venter, J. Zietsman, C. Sandrock, Q. G. Reynolds
Understanding the behaviour of plasma arcs is an important part of the design and operation of direct current electric arc furnace smelting processes, which are used in the industrial production of ma
Mar 4, 2025