Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY

    By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht

    The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou

    Jan 1, 2018

  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support

    By Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin

    "Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated

    Jan 1, 2016

  • DFI
    The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability

    By Kim Chan, Bryn Thomas, Ben Dening

    "Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra

    Jan 1, 2015

  • DFI
    Augered Cast-in-Place Pile Manual, Second Edition, 2003

    The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.

    Jan 1, 2003

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • DFI
    An In-Situ Model Test For A Large Hydraulic Press Foundation ? Synopsis

    By R. J. Yan

    There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea

    Jan 1, 2010

  • DFI
    Accuracy of Low-Strain Pile Integrity Test Results

    By Mahesh Hingorani

    Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv

    Jan 1, 2019

  • DFI
    Quality Control And Estimation Of Axial Resistance By Using An Expander Body, A Large-scale Pressuremeter

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    This paper describes the general principles of the expander body with post-grouting (EBI) system, and how it is similar in nature to a large-scale pressuremeter device. The results from the installati

  • DFI
    Lateral Vibration Response Of Full Scale Single Piles

    By A. Boominathan

    The behaviour of single piles under lateral dynamic loading is very critical and the study is still a current field of research since 1950's. Though many methods have been developed analytically

    Jan 1, 2002

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
    Site Specific Study for Foundation Design of Iswar Gupta Bridge

    By Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath

    "Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig

    Jan 1, 2015

  • DFI
    Numerical Study On Uplift Capacity Of Helical Pile Embedded In Clay

    By Muttharam M, Karthick Kumar V

    Helical piles foundation systems have been extensively used in engineering application. It is commonly adopted to resist the compression, uplift force, overturning moment and lateral forces. Helical p

    Nov 1, 2022

  • DFI
    Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway Upgrade

    By Henry Zhang

    This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re

    Nov 1, 2022

  • DFI
    The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension Piles

    By Qingwei Joshua Ong

    Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd

    Nov 1, 2022

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft

    By Stephen Buttling

    The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc

    Nov 1, 2022

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007