SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event
By Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - Introduction
By Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis
By C. L. Liao
The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter
Jan 1, 2010
-
Construction Of Pile Foundation For Railway Viaducts
By M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation
By Emad Farouz
The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c
Jan 1, 2006
-
Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study
By David A. Staab
Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog
Jan 1, 2004
-
Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description
By Jean J. Abiassi
The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t
Jan 1, 1994
-
Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects
By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami
"Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha
Jan 1, 2015
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering Guidelines
By M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis
By S. L. Karunakaran
Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number
Jan 1, 1996
-
Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building Damage
By K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami
Jan 1, 2014
-
Skilled Operative Training For The Foundation Industry - Summary
By Geoffrey Birch
A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski
Jan 1, 2000
-
Acrylamide Grouting: Successfully Controlling Groundwater From Canada To South America
By Jom Gentry
Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
-
Formation Of Interlocking Jet Grout Columns At Large Depth
By Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008
-
Increasing Lateral Pile Stiffness Through Limited Soil Improvement
By Thomas J. Weaver
Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat
Jan 1, 2006
-
Resonant Pile Driving - Part I - The Promise & The Reality - Part II - Soldier Pile Installation - Light Rail Transit - Buffalo, New York - 1. Historic Background.
By D. R. Dance
The Resonant, or as it has more commonly come to be known the 'Sonic' Pile Driver, dates back to the early 1960's, when prototypes were produced by Charlie Guild, of Providence, Rhode I
Jan 1, 1987
-
Hybrid Shoring System for a Deep Temporary Excavation
By Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava
Jan 1, 2017
-
Predication Of Heave For Deep Excavation With Irregular Plane Shape
By Zhang Jiaju
For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method
Jan 1, 1991
-
Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998
By David A. Jack
The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa
Jan 1, 1998
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction
By Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994