  • CIM
    The Industrial Way to Make Product Cost Calculations in Crushing & Screening

    By Per Hedvall, Jan-Eric Ståhl

    "The main objective of this study is to introduce the new Sandvik’s production cost-model within Crushing & Screening (C&S) technology. So far, there have been different ways of determining different

    Jan 1, 2016

  • CIM
    Evaluation of Friction Stir Welding for Sheet Metal Resonant Structures

    By L. St-Georges

    In aerospace and transportation industries, severe problems are related to fatigue failure. Aluminium is frequently used in these industries to optimize the solidity and minimise the weight of the str

    Jan 1, 2006

  • CIM
    Experience in the Low Pressure Casting in Printed Molds of a Thin Bladed Aluminum A356 Impeller

    By G. Morin, F. Chiesa, B. Tougas, B. Duchesne, Jocelyn Baril, N. Giguère

    "An aluminum A356 compressor impeller was sand cast using the Low Pressure technique. The casting was limited in size (170 mm in diameter, 1.2 kg in weight) and very intricate in shape thus making 3D

    Jan 1, 2018

  • CIM
    Continuous Uranyl Peroxide Precipitation From Combined Solvent Extraction Strip Liquor And Ion Exchange Eluate For The Honeymoon Uranium Project

    By K. Bowes, M. D. Maley, R. J. Ring

    The Honeymoon Uranium Project is an acid In-Situ Recovery (ISR) mine in South Australia. It was previously operated for approximately 18 months before being placed on care and maintenance in 2014, it

    Jan 1, 2020

  • CIM
    Amenability of Gold Ores to Coarse Particle Gangue Rejection (Preconcentration) Processes

    "Decreasing gold-in-ore grades is one of the main drivers of poorer productivity and rapidly escalating unit costs. Grinding costs, water use and reagent consumption are all intimately related to the

    Jan 1, 2016

  • CIM
    Presidential Address, M.S.N.S. (bf4510d8-a24d-490d-bccc-7b42645f0b7b)

    By G. G. Bowser

    THE time has come when, as your President, 1 turn the helm over to my worthy successor. When 1 was reminded by our Secretary that 1 had to prepare an address for this meeting, 1 was at a loss for a su

    Jan 1, 1943

  • CIM
    Analysis Of LEFM Parameters And Fatigue Propagation Of Sent Cracked Am6ob Magnesium Specimens

    By Nur Hossain

    Analysis of Linear Elastic Fracture Mechanics (LEFM) parameters via the Virtual Crack Closure Technique (VCCT) has been obtained for SENT specimens of AM6OB magnesium alloy. It is found that the ratio

    Jan 1, 2010

  • CIM
    Characterization of the 75% Gd0.8Sr0.2Co03_6 / 25% Ce0.9Gd0.102-8 composite cathode system for use in intermediate temperature solid oxide fuel cells

    By L. B. Kilius

    The composite cathode system based on Ce0.9Gdo.1O2_,5 electrolyte with a painted cathode was used for an intermediate temperature (500-700°C) solid oxide fuel cell. This cathode system was chosen due

    Jan 1, 2005

  • CIM
    Energy Saving Opportunities in the Minerals Industry Newmont Gold Australia Case Study

    By Marcin Ziemski

    This paper reports on an energy efficiency analysis completed as part of a research project looking at energy reduction opportunities in minerals processing operations. The plant discussed is a gold

    May 1, 2007

  • CIM
    Experimental and Numerical Investigation of Two-Dimensional Granular Flow Through Bins

    By P. D. Barrette

    This paper deals with the flow of granular materials in bins. A hybrid Lagrangian-Eulerian numerical model is introduced. The model is based on Particle-In-Cell (PIC) advection, and continuum equation

    May 1, 2007

  • CIM
    Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine Life

    By Kathy S. Kalenchuk

    Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas

    Jun 1, 2012

  • CIM
    Geochemical methods for the discovery of blind mineral deposits (7d3f5bad-e4f1-459a-85b8-0e3f33752c98)

    By R. W. Boyle

    "EDITOR'S NOTEPart 1 of this paper, published in the August issue, covered lithochemical surveys based on major, minor and trace elements in whole-rock samples from primary enveloping halos.Part

    Jan 1, 1982

  • CIM
    Seeking Hydrometallurgical Pathways for Chalcopyrite Leaching: Development of a Thermodynamic Model

    By C. S. Touchard, F. Bourgeois, L. Cassayre, Julcour-Lebigue C.

    Developing a hydrometallurgical process that can overcome the refractory nature of chalcopyrite (CuFeS2) to leaching still eludes the minerals industry, despite major research efforts spanning decades

    Jan 1, 2019

  • CIM
    Environmental Excellence In Exploration (E3)

    The Environmental Excellence in Exploration (E3) project is driven by the recognition that the minerals industry can only maintain its long term viability by ensuring its continued access to lands to

    May 1, 2002

  • CIM
    Development and Applications of Microsegregation Models for Solidifying Light Metallic Alloys

    By S. Uddin

    Microsegregation manifests its effect on microstructural evolution of cast or welded alloys which in turn influences their important mechanical and electro-chemical properties. In the above context, m

    Jan 1, 2007

  • CIM
    A Supply System for Western Canadian Thermal Coal

    By E. G. Bazeley

    The paper reviews the scope, timing and financial impact of this significant project, which involves the supply and transportation of nearly 4 million tons per year of bituminous coal and lignite from

    Jan 1, 1978

  • CIM
    Aging effects in 319 alloys

    By N. R. Andrade-Gonzalez

    The present work was performed on four alloys containing Al-6 2 wt pct Si-3 5 wt pet Cu, with magnesium in the range of 0.02-0 40 wt pct, and strontium in the range of 0-165 p p m Tensile bars were ca

    Jan 1, 2004

  • CIM
    ISO Management Standard for Energy Management - WIIFM (What's In It For Metallurgy?)

    By A. Taylor, E. Thorn Corthay, R. Storey

    In response to requests from its stakeholders, the International Standards Organisation is engaged in development of an international standard for Energy Management Systems (EnMS) which will become "I

    Jan 1, 2010

  • CIM
    Depleted Uranium Processing and Fluorine Extraction

    By Steve T. Laflin

    Since the beginning of the nuclear era, there has never been a commercial solution for the large quantities of depleted uranium hexafluoride generated from uranium enrichment. In the United States alo

    Aug 1, 2010

  • CIM
    Challenges in Pneumatic Conveying of Concentrate and Flue Dust at Copper Smelters

    By E. Lehtila, J. J. Talja, R. Jahila

    Kopar Oy is acknowledged for engineering and manufacturing of robust systems for bulk material handling, especially at power plants and non-ferrous smelters. We have over thirty years of experience wi

    Jan 1, 2019