Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Combining Dynamic Logistics Simulation with Process Modeling to Support Capacity Expansion Studies: Experience at ArcelorMittal Mines Canada Pellet PlantBy Jean-Pierre Côté, Alexandre Noiseux
"Hatch and ArcelorMittal Mines Canada have combined their expertise to develop a dynamic model of the latter’s Iron Ore Pellet Plant in Quebec, Canada. This model was used to predict the benefits of d
Jan 1, 2010
-
St. Andrew GoldfieldsBy P. Massi
"Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d
Jan 1, 1992
-
New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)By R. S. Simkus, J. R. Egan
"Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct
Jan 1, 1994
-
Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, OntarioBy A. C. Wilson
In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu
May 1, 2003
-
Mine Planning Guidelines for Developing Sustainable Closure Drainage SystemsBy Leslie F. Sawatsky
Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie
May 1, 2004
-
Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentrationBy Andrew Bamber
The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.
Oct 1, 2004
-
Improving mining and minerals plant performance: operations and maintenance working together using new information technologyOperations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc
Jan 1, 2009
-
Cut off Grade Optimizer Integrating Contaminant ConstraintsBy Sebastián H. Troncoso
Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block
Oct 1, 2009
-
Process Improvements at Bell Creek MillBy F. Flynn, P. Downey, G. Ritson
"Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git
Jan 1, 1997
-
Towards AG/SAG/ball mill on-line performance monitoringBy S. Caron, P. Radziszewski
Industrial practice in mineral processing shows that an important problem in understanding and monitoring in-mill parameters is due to the lack of fundamental knowledge and appropriate sensors. Howeve
Jan 1, 2004
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery CurvesBy D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
Concepts for Remote Mineral ProjectsBy L. J. Vincze
The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a
Jan 1, 1980
-
Cluff Lake Mill - Phase 2 ExpansionBy H. A. Schnell
"The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m
Jan 1, 1985
-
“Energy Management Program”By K. H. B. Wenzl
"Since the autumn of 1973, the world's attention was captured by the startling revelation that conventional energy supplies were not inexhaustible but were in fact quickly dwindling with future shorta
Jan 1, 1978
-
Sampling and assaying of coarse gold at La Herradura–Minera Penmont S. de R.L. de C.V., MexicoBy S. Cossio, J. L. Noyola, R. Espinosa
"Minera Penmont’s La Herradura is a joint venture between Industrias Peñoles, S.A. de C.V. and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura con
Jan 1, 2004
-
Investigation on Efficiency and Wear with the LCM Centrifugal MillBy Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler
"The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.
Jan 1, 1985
-
A Strategy to Reduce the Consumption of Sodium Sulfide in Flotation of Molybdenite at the Sarcheshmeh Copper ComplexBy S. Banisi, M. Poorkani
The Sarcheshmeh copper deposit contains 1 billion tones of ore averaging 0.7% copper and 0.025% molybdenum. It is located southeast of Iran and currently processes 41,000t/d. Molybdenite as a by-produ
Jan 1, 2005
-
Process Safety ManagementBy Ertugrul Alp
Alp & Associates - Who We Are ?? Canadian consulting company (1999-?) ?? Principal Consultant: Dr. Ertugrul Alp, P.Eng. ?? Over twenty-five years experience serving the chemical, mining, pulp & pap
May 1, 2008
-
Prospecting the Future: Meeting Human Resources Challenges in the Canadian Minerals and Metals IndustryBy Ryan Montpellier, Paul Hebert
"Prospecting the Future: Meeting Human Resources Challenges in Canada's Minerals and Metals Sector is a comprehensive sector study of the short- and long-term human resource issues and challenges faci
Jan 1, 2007
-
Hydromet Piloting: What the Mineral Processor can expectBy Ronald Molnar
"High demand for metals is driving the exploitation of lower grade and more complex orebodies. These projects are often the initiatives of junior mining companies with limited financial resources. In
Jan 1, 2006