Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dampier Port Upgrade Project - An Overview of Engineering, Procurement and Construction Management Project ManagementBy A Radici, S Russell
The Dampier Port Upgrade was completed in 2007 and is the largest project in Rio Tinto Iron Ore's expansion program. The project doubled Dampier Port's iron ore shipping capacity over a five
Jan 1, 2009
-
Continuous Haulage Prospects for Underground Coal MinesDetailed observations were made for two existing continuous miner and shuttlecar systems. A simple model for the shift average cycle consisted of three time components - delays, mining and transport
Jan 1, 1982
-
The Permeability of Some Australian CoalsBy Doig ID, Phillips HR
As a prelude to studying the sorption desorption and permeability behaviour of coal cores in a triaxial stressing rig using sorb- able gases, the air permeability of typical cores was measured. Lump
Jan 1, 1982
-
Solar Salt, Lunar AmbitionsSolar Salt, Lunar Ambitions I Bauerti The title of this paper is `Solar Salt, Lunar Ambitions'. It is largely the result of a lack of imagination and a tight deadline. I was seeking a catchy ti
Jan 1, 1995
-
Future Trends in the Non-Ferrous Metal Industry of the WorldBetween, 1980 and 1984, the demand for non- ferrous metals in the free world grew annually by 1.5 per cent for copper, 0.4 per cent for lead, 1.4 per cent for zinc, and 2.5 per cent for nickel. The
Jan 1, 1986
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
Technical Aspects of Reopening Gold Mines in VictoriaBy McCarthy PL
Widespread interest in reopening Victorian gold mines, regenerated by increased gold prices, has highlighted the technical problems prevailing. A combination of historical lease legislation, minim
Jan 1, 1982
-
Spoil Pile Instability with Reference to the Goonyella Mine, QueenslandThe characteristics and causes of the spoil pile failures at the Goonyella Mine are described, and research results from investigations of spoil pile instability are discussed. Some effects on spoil
Jan 1, 1981
-
Reducing Social Risk and Impact by Engaging Local CommunitiesIn todayÆs evolving and globalised world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to æengage
Jan 1, 2007
-
A Computer Study of Single Track Iron Ore Railway OperationBy Blair J. R
A Train Performance Calculator (TPC) is an essential tool in railway operations, as a means of acquiring quickly a precise measure of the performance of the system. Traditionally the TPC was used in
Jan 1, 1977
-
Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal SystemBy Susanto A
As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the
Jan 1, 1989
-
Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, IndonesiaBy H Indirawati, R Ayres, A Nur Kasnanto, S Konopa
As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current
Nov 21, 2018
-
Synergistic Collaboration of Humans and Automated Systems – Innovative Steps Towards Fully Autonomous and Continuous Mining SystemsBy E Widzyk-Capehart, P Vallejos, R Asenjo, J Ruiz-del-Solar
Throughout the minerals industry, it is evident that a new wave of technological innovation is needed as the mining sector looks for ways to achieve higher security and safety as well as higher produc
Nov 4, 2015
-
Selective Grinding to Improve Copper Recovery at Mount LyellBy Bisshop J. P W
Maximum recovery of sulphide minerals by flotation is achieved over a limited size range. Valuable particles above and below this range have a smaller probability of being recovered. In the normal
Jan 1, 1977
-
Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 KBy G H. Park, Y J. Jun, J H. Park
The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on
Jun 19, 2024
-
Are Your Megaproject Schedules and Costs Under – or Out of – Control?By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson
"Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu
Mar 8, 2016
-
Successful Mineral Resource Development at the Ernest Henry Copper-Gold Mine, NW QueenslandBy J D. Bryant
The Ernest Henry Copper-Gold mine, the third largest copper deposit in Australia, is located 35 km NE of Cloncurry in the Mt Isa-Cloncurry mineral district of NW Queensland. Ernest Henry Mining Pty Lt
Jan 1, 2003
-
Spontaneous combustion hazard assessment of McArthur River Mine waste rockBy P Marianelli, J Theiler, B Beamish, A Spillman
The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga
Jul 23, 2018
-
A day in the life of a mineworker in 2045By G McCullough, J Bassan, d P. Knights, C T. Farrelly
By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme
Sep 1, 2024