Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • AUSIMM
    Thermodynamics of Indium Cadmium Melts

    By Iwu GO, Almond DP, Joasoo _

    The gravimetric integral Knudsen effusion method was used to measure cadmium activity values in binary liquid In-Cd alloys in the range 523 to 573 K. The activity measurements together with other s

    Jan 1, 1980

  • AUSIMM
    A Platform for Managing and Analysing Atmospheric Data in Underground Coalmines

    By S J. Schafrik, Z Agioutantis, E C. Jong, K Luxbacher

    Real-time monitoring of mine operating parameters is available at most mines. However, access to these data for an individual operation is typically underutilised by mine managers and technical person

    Nov 4, 2015

  • AUSIMM
    Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock type

    By W F. E Ouedraogo

    This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g

    Jun 22, 2022

  • AUSIMM
    Continuous Carbon Concentration Measurement at Newmont Boddington Gold

    By C McCamley

    "The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold

    Oct 10, 2016

  • AUSIMM
    Mining Administration and Legislation

    This paper discusses some topical issues on the mining administration and legislation fields including:  1. Licensing û Administration and associated specialist functions including:Processin

    Jan 1, 1982

  • AUSIMM
    Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation

    By M S. Cassola

    It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r

    Jul 11, 2011

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    The Mineral Resources Landscape - An Expanded Conceptualisation of Minerals Sustainability

    By D Giurco

    As part of global systems of mineral production and consumption, the Australian minerals sector is facing sustainability challenges across technological, social, ecological, economic and governance do

    Jan 1, 2009

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    The evolution of structural and lithological domaining on the Spotted Quoll nickel sulfide mineral resource estimate

    By A D. Wulfse, C M. D Barton

    Underground fractured aquifers in the Ernest Henry deposit are to a large extent controlled by deposit scale brittle structures. The underground mine has been subdivided into nine water zones based on

    Mar 22, 2022

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    Modern X-Ray Diffraction Techniques as a Fast Industrial Analysis Method for Iron Ores - From Exploration to Process Control

    By L Gobbo

    X-ray diffraction (XRD) provides useful information about the composition of an ore sample in terms of quantification of crystalline phases and amorphous content. The use of new, fast detection system

    Jan 1, 2009

  • AUSIMM
    Minister's Address

    The Honourable Neil Pickard has been in Parliament for something like sixteen years. He was Minister for Education in 1976, served as Shadow Minister in a number of portfolio areas while his party w

    Jan 1, 1989

  • AUSIMM
    A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming Conditions

    By Y Li, Z Fu, D J. Williams, E Topal

    Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface

    Jul 27, 2015

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014