Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ventilation considerations and modelling of lithium battery fires inunderground mining

    By C M. Stewart

    Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for

    Oct 12, 2022

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Scaled depth of burial application to increase blast efficiency in PT. Indo Muro Kencana

    By A Suwandhi, H Utama

    PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (

    Jun 22, 2022

  • AUSIMM
    Health Tracking Project ù The Development of a National Framework for Managing Occupational Illness and Disease in the Australian Minerals Industry

    The Health Tracking project is one of five projects being undertaken as part of the Minerals Industry Cooperation Initiative (MICI) û a national initiative sponsored by the Minerals Council of Austral

    Jan 1, 2005

  • AUSIMM
    The role of scale in prediction of mine drainage chemistry

    By N McIntyre, M Edraki, K R. Jain

    From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch

    Aug 2, 2023

  • AUSIMM
    South Deep ù The Challenges

    Over years of exploration the massive and tabular orebodies in the area to the South West of Western Areas Gold Mine had been assessed as containing about 50 million ounces of gold û a world class ore

    Jan 1, 2002

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine

    By K Rees

    In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow

    Mar 26, 2012

  • AUSIMM
    Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant Modelling

    By V Ser, R Crosbie

    To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)

    Jan 1, 2005

  • AUSIMM
    Dependence of Flame Front Speed on Iron Ore Sintering Conditions

    By J Zhao, C E. Loo

    The flame front is a narrow region in the iron ore sintering bed where coke particles combust. The maximum flame front temperature is as high as 1400°C. At high temperatures, the sinter mix compo

    Jul 13, 2015

  • AUSIMM
    SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining Solutions

    By W Curlewis, D Hake, Z Cuthbert

    The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int

    Sep 17, 2014

  • AUSIMM
    Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine

    By T Purvis, J Calverd, A-K Greve

    The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h

    Mar 24, 2014

  • AUSIMM
    Integration of Sustainability Into Mining Schools - Counter-Cyclical Strategies

    By M Scoble

    This paper is based upon the experiences of collaborating academics in two mining schools and their personal view of attempts to integrate the principles of sustainable development into mining educati

    Jan 1, 2009

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    Petrochemical Variations of Island Arc's Andesites (Kurile Island Arc)

    The problem of comparison of island arc's andesites in terms of petrochemical data is exa- mined. It is definitely established that only two main factors exist controlling the petroche- mical v

    Jan 1, 1987

  • AUSIMM
    Linking safety factor to probability of failure

    By S M. Gover

    Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty

    Jul 23, 2018

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: I. Occurrence, Mineralogy and Physical Properties

    By See G. T

    Bentonites and fuller's earths from seven localities in N.S.W. have been analysed with respect to occurrence, mineralogy and physical properties and areas for future prospecting have been indicat

    Jan 1, 1959

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012