Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    The Integrity of Cover Systems ù An Update

    By D J. Williams, E M. Rykaart

    Soil cover systems are routinely used to reduce acid rock drainage (ARD) from mine waste rock dumps and tailings impoundments. A technology for the analysis, design, instrumentation and monitoring of

    Jan 1, 2003

  • AUSIMM
    Managing Underground Risks in Singapore Through Geotechnical Interpretative Baseline Reports

    By L N. Loganathan

    Risk exposure in tunnel projects is extremely high due to various factors such as variability of subsurface conditions, selection of inappropriate design and tunnelling methods, improper risk assessme

    Jan 1, 2008

  • AUSIMM
    Pioneering Community Collaboration in Mineral Exploration Southern Flinders Ranges

    By I B. Miller

    Magnesium International Limited (MIL) has broken new ground in their desire to integrate their mineral development activities in the Southern Flinders Ranges of South Australia in to the communities o

    Jan 1, 2004

  • AUSIMM
    South Australian Coals And Their Troublesome Impurities

    By Lindner E, Bosio M

    South Australian coals are all low in rank and generally poor in quality, with difficult combustion characteristics. This circumstance makes the selection of a fuel source for future power generati

    Jan 1, 1977

  • AUSIMM
    Implementation of the Moura Recommendations - A Managers Perspective

    The tragedy of the Moura No. 2 incident has lost much of its emotional mileage for those organisations that thrive on loss and suffering. However, for the families, workers, mine owners and operators

    Jan 1, 1998

  • AUSIMM
    Mount Isa Copper Mines ù Role of the Mining Engineer

    By B J. Andrew, M R. Daley

    Mount Isa Copper Mines is a world-class mining operation producing approximately six million tonnes of ore per annum. With over 50 years of mining history and over 76 million tonnes of underground res

    Jan 1, 2005

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014

  • AUSIMM
    The Use of Computer Based Blasting Models in Mine Feasibility Analyses

    By S Williams, N McBride

    The aim of these analyses was to utilise the latest available production information for the Wandoo operation to determine the optimal blasting parameters, costing information and predicted results (f

    Jan 1, 1999

  • AUSIMM
    Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken Hill

    By G C. Reed, J M. Murray

    During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to

    Jan 1, 2000

  • AUSIMM
    Historic Gold Dredging on the West Coast

    Slide presentation at conference

    Jan 1, 1996

  • AUSIMM
    Newmont Waihi Operations ù An Overview

    The Newmont Waihi Operations are centred on the Martha mine at Waihi, New Zealand. The mine has produced over 6.6 million ounces of gold from both openpit and underground sources since operations bega

    Jan 1, 2002

  • AUSIMM
    Evaluation of a Single-Layer Desulfurised Tailings Cover

    By G W. Wilson, M Aubertin

    A desulfurised tailings cover was installed at the Detour Lake Mine in Ontario, Canada, to reduce oxygen penetration into the underlying sulfidic tailings. The cover ranges from one to 1.5 m in thickn

    Jan 1, 2003

  • AUSIMM
    Empowering mining communities – the importance of local business hubs for skills development

    By L Mackinlay

    The Apeketon Business Hub in Lihir, Papua New Guinea, emerged in 2019 through a partnership between Australian Business Volunteers (ABV) and Lihir Gold Limited (LGL), a subsidiary of Newmont Corporati

    Sep 1, 2024

  • AUSIMM
    Gold Rank Indicators - Exploration to Acquisition

    By Robinson T

    The paper describes a spreadsheet system that enables selection of projects and companies that meet the user's corporate exploration and/or acquisition philosophy. A regularly maintained commer

    Jan 1, 1988

  • AUSIMM
    Composite Wear Resistant Materials for Crushing, Grinding, and Screening Abrasive Ores

    By Norman TE

    The design of composite materials for wear resistant service aims at com- bining two or more materials in such a way as to achieve unique and useful properties not generally available in any single

    Jan 1, 1978

  • AUSIMM
    Distributed Graphics Processors Widened Dimensions For Mining Applications

    By Johnson MT

    The microprocessor revolution of the 1970's dramatically improved the price/per- formance of graphics hardware. Together with improved communications and new software concepts and standards th

    Jan 1, 1983

  • AUSIMM
    Sinking the New Broken Hill Consolidated Circular Airshaft

    The New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the

    Jan 1, 1940

  • AUSIMM
    The Development of a CADD Mine Design System

    By Gill L. F, Gleeson HB

    This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available

    Jan 1, 1989

  • AUSIMM
    The Use of Psychometric, Thermodynamic and Transport Property Software in Mine Ventilation and Gas Drainage Calculations

    By T J. M Harvey

    This paper gives an overview of the ASHRAE LibHuAirProp, CoolProp and REFPROP software packages. These packages were predominantly developed for heating, refrigerating and air conditioning engineers a

    Aug 31, 2015