Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Social Licence to Operate and Drivers for Change – Resource Reporting and Mine Material Characterisation

    By J Heyes, G A. Maddocks, R J. Stewart, G D. Corder

    Mining is an international business and vital contributor to national and global economies. It depends on the trust and confidence of investors and stakeholders for its financial and operational well-

    Jun 28, 2016

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Creating the Optimal Coal Working Section

    By P Lukic

    The definition of the working sections that will be used in a mine is usually initially made in the field by the geologist supervising the drilling program. These initial definitions are often made on

    Sep 26, 2011

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • AUSIMM
    Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine Planning

    By G Williams

    Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me

    Oct 5, 2011

  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016

  • AUSIMM
    Applying the Metrics Navigator to Establish Strategic Indicators for Mining

    By D Tanzil, H Jones

    Every mine will close! Charting a profitable course through mine operations to acceptable mine completion requires that risk and opportunity management planning of the mine life begin as early as poss

    Jan 1, 2009

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Legislation, Litigation and Liability

    Safety and health at work is about people. It is about people who plan for work, organise work and perform work. It is about those who come in contact with the workplace and those who are responsible

    Jan 1, 2005

  • AUSIMM
    Cayeli Mine journey to become a safer mine with an innovative approach – Think! Safety Program

    By S Flanagan, M M. Mete, A R. Tiryaki, M Guresci

    First Quantum Minerals (FQM) operates the Cayeli underground copper mine in Turkey. In response to a lost time incident (LTI) that occurred at the mine in 2022, the mine management decided to introduc

    Apr 16, 2024

  • AUSIMM
    New Mines in the New Age ù The Two Risks of Environmental Impact Assessment

    EIA is a test of a development proposalÆs legitimacy and asks two questions: not only æis the proposal competent?Æ but also ædoes the proposal have moral authority?Æ For reasons of miningÆs historic i

    Jan 1, 2004

  • AUSIMM
    Responsible Tailings Management

    By J Boshoff

    The management and operation of tailings storage facilities (TSFs) are often neglected until the process plant has to shut down as a result of this negligence or as a result of a catastrophic failure

    Jul 27, 2015

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    From Mt Goldsworthy to Area C ù Reflections on Forty Years of Iron Ore Exploration in the Pilbara

    By D A. Kepert, I J. Tehnas, M A. Pudovsk

    BHP Billiton (BHPB) was the first company to start iron ore mining in the Pilbara at Mt Goldsworthy in 1966 through Goldsworthy Mining Limited (GML - then Consolidated Goldfields Australia, Cyprus Min

    Jan 1, 2002

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012