Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    Evaluating the Effects of Non-coaxial Charges for Contour Blasting

    By J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt

    Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a

    Aug 24, 2015

  • AUSIMM
    The Development of the Escondida Leach Process and its Implementation in the Escondida Copper Cathode Plant

    BHP is the world's largest copper concentrate producer with production from mines at Escondida (Chile), Ok Tedi (Papua New Guinea), and Island Copper (Canada). The entire concentrate production

    Jan 1, 1995

  • AUSIMM
    Inception and Evolution of Cenozoic Arc-Type Volcanism in Northern New Zealand (886f7b72-4afb-4be4-a759-bffd9f4c1d50)

    By Black PM, Itaya T

    Arc-type volcanic activity has been a major feature of the late Cenozoic geological evolution of the Pacific-Australian plate boundary in the northern New Zealand region. The timelspace distribution

    Jan 1, 1995

  • AUSIMM
    3D estimation of variables with complexity in cross-correlation structures

    By N Madani

    Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model

    Nov 21, 2018

  • AUSIMM
    Assessing static liquefaction for upstream tailings dams

    By A Litwinowicz, M Laxman, A Fourie, A L. Li

    This paper presents a design approach and analytical methods that were used for assessing the potential of static liquefaction and developing the mitigation measures for a tailings dams. The rigour of

    Jul 1, 2021

  • AUSIMM
    Martabe integrated life-of-mine optimisation

    By K J. Grohs

    Martabe gold and silver mine is situated in northern Sumatra and comprises several deposits in steep terrain that are required to be developed in the optimal sequence for the best possible Net Present

    Jul 25, 2018

  • AUSIMM
    Weak Acid Dissociable Cyanide Analysis Required for International Cyanide Management Code (ICMI) Compliance û Recent Refinements to an Online Weak Acid Dissociable Cyanide Measurement Device

    By H S. Smit, P Lotz

    Gold mining companies who are signatories of the International Cyanide Management Code (visit www.cyanidecode.org for further information) are required to measure WAD cyanide on-line and destroy WAD c

    Jan 1, 2008

  • AUSIMM
    Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case Study

    By S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst

    Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t

    Sep 26, 2013

  • AUSIMM
    How innovation trumps isolation, one mine at a time

    By J Pearce, R Ramanathan

    hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel

    Jun 22, 2022

  • AUSIMM
    Broker's Rules of Thumb for Mineral Valuation: A Focus on Gold Equities

    By Dodd SF

    Valuation of mining companies and their underlying assets prepared by brokers' analysts are, by necessity, approximations. The reliability of the valuations is entirely proportional to the qua

    Jan 1, 1994

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Exploration and Mining – The Need for Innovation

    By J F. H Thompson

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Mineral exploration and mining are challenging businesses. Remote and at times harsh condit

    Mar 18, 2015

  • AUSIMM
    Management of dilution and mining recovery to maximise value

    By R Urie

    Dilution and loss of ore during the mining process invariably occur in all underground mining operations. This dilution and ore loss can have a significant effect on the performance and value generate

    Mar 29, 2023

  • AUSIMM
    Grouting Technologies for Soft Ground Tunnelling: Recent Developments

    Soil improvement technologies have been widely employed over the recent decades to overcome tunnelling problems in difficult grounds, their range of application growing proportionally to the technolog

    Jan 1, 1999

  • AUSIMM
    A coupled gas flow-geomechanical model based on energy analysis in coal and gas outburst simulation

    By F Soleimani

    Coal and gas outburst is a common hazard in coalmines and due to the complexity of its nature, efficaciously predicting the possibility of its occurrence is intricate. The mechanical and gas flow prop

    Oct 12, 2022

  • AUSIMM
    Strategic mine schedule optimisation

    By A Tsoy

    This abstract describes long-term mining schedule optimisation approach that may be suitable for complex marginal projects and is based on modern scheduling techniques. CITATION: Tsoy, A, 2018. Strate

    Nov 21, 2018

  • AUSIMM
    The Solid Foundation of a Career

    The following paper outlines the types of employment immediately available to graduates following their university degree, a discussion on mine manager requirements, mentions career advancement and ti

    Jan 1, 2006

  • AUSIMM
    The Business Case for Mine Closure Planning and an Overview of Anglo AmericanÆs Mine Closure Toolbox Approach

    By P R. Botha

    Mining has played a significant role in human development and without the mining sector, society would not enjoy a large number of the benefits that it does today. However, mining has also carried wit

    Jul 10, 2012

  • AUSIMM
    Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold Ores

    By A Hall, D Kratochvil, P Littlejohn

    Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe

    Sep 26, 2013