Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Protection of Underground Mine Structures Due to Adjoining Open Pit Mine Blasting

    By L S. Shekhawat, M P. Roy, R K. Paswan, P K. Singh, A Joshi

    Blasting in the mining industry is being transformed, and can no longer be treated as an art or a practice purely dependent upon experiences of individuals. Examples of key drivers that have demanded

    Aug 24, 2015

  • AUSIMM
    Monitoring Sb in lead refining using advanced techniques in Industry 4.0

    By S Zummar, A Van den Bulck, T De Staercke, T Van Rompaey

    An increase of 22 per cent in lead usage is expected in the European Union by 2050. During lead refining, the Harris process is a critical step in which a salt melt is used to remove arsenic, tin and

    Aug 21, 2024

  • AUSIMM
    Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore Mine

    By B Yeganeh, A Sam, A Kohsari

    The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa

    Jan 1, 2007

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Structural Controls and Strain Partitioning in the Red October Gold Mine, Western Australia

    By D Howe, J Conn, J G. McLellan, K Gates

    The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean

    Aug 18, 2014

  • AUSIMM
    Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap Leach

    By D Readett

    The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t

    Aug 8, 2011

  • AUSIMM
    Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator

    By C Dick

    Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm

    Aug 8, 2011

  • AUSIMM
    Comparison of two and three‐dimensional seepage analysis in tailings dams – a case study

    By N Yarahmadi

    Characterization of pore pressure is critical for appropriate design of tailings dams. Furthermore, if seepage rates through tailing embankments increase unexpectedly or become uncontrolled, undesirab

    Jul 1, 2021

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing Plant

    By S Döpp

    Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during

    Jul 11, 2011

  • AUSIMM
    The Preparation and Consolidation of Tantalum Powder

    Following the preparation of tantalum oxide and carbide (1) an investigation of the details relating to the production of tantalum metal powder was planned. From the literature (2) it was evident that

    Jan 1, 1946

  • AUSIMM
    Predicting changes in static liquefaction susceptibility using cone penetration test results

    By J T. Sharp, M A. Styler, D McGowan, P W. Mayne

    Static liquefaction is a geotechnical hazard in mine tailings facilities. Soils that are contractive in shear are susceptible to static liquefaction. Tailings facilities are dynamic structures, typi

    Jul 23, 2018

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018