Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies
By John C. Stankus
Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted
Jan 1, 1990
-
Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)
By Craig Compton
Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,
Jan 1, 2007
-
Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines
By V. Eu. Anufriev
Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re
Jan 1, 1996
-
Coal-Mining-Induced Seismicity in Utah?Improving Spatial Resolution Using Double-Difference Relocations
By Kristineq Pankow
The August 2007 Crandall Canyon mine disaster raised national awareness of mining-induced seismicity (MIS) in Utah as well as general interest in how seismic monitoring might improve mine safety in th
Jan 1, 2008
-
Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts
By Damon P. Vandermaat
Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa
Jan 1, 2012
-
Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study
By Wenbing Xie
At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete
Jan 1, 2012
-
Analytical Investigation of Shaft Damages at West Elk Mine
By Tim Ross
Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear
Jan 1, 2006
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)
By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Application Of Tomographic Imaging To Stability Assessment
By Hamid Maleki
Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r
Jan 1, 1996
-
Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem Simulation
By D. Su
This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline
Jan 1, 1990
-
Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study
By P. Tsang
The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different
Jan 1, 1989
-
A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application
By Deren Zhu
Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by
Jan 1, 1989
-
State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)
By Alan A. Campoli
The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of
Jan 1, 1996
-
Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study
By Sandin E. Phillipson
The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area
Jan 1, 2012
-
Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study
By Mark K. Larson
Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th
Jan 1, 2012
-
Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits
By Krzysztof Kotwica
The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in
Jan 1, 2006
-
The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam
By M. Craig Miller
As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete
Jan 1, 1990
-
Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control
By Sudhir Kumar Kashyap
In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of
Jan 1, 2012
-
Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia
By Takashi Sasaoka
Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t
Jan 1, 2007
-
Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)
By R. Karl Zipf
The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o
Jan 1, 1996