Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies

    By John C. Stankus

    Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted

    Jan 1, 1990

  • SME-ICGCM
    Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)

    By Craig Compton

    Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,

    Jan 1, 2007

  • SME-ICGCM
    Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines

    By V. Eu. Anufriev

    Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re

    Jan 1, 1996

  • SME-ICGCM
    Coal-Mining-Induced Seismicity in Utah?Improving Spatial Resolution Using Double-Difference Relocations

    By Kristineq Pankow

    The August 2007 Crandall Canyon mine disaster raised national awareness of mining-induced seismicity (MIS) in Utah as well as general interest in how seismic monitoring might improve mine safety in th

    Jan 1, 2008

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    Application Of Tomographic Imaging To Stability Assessment

    By Hamid Maleki

    Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r

    Jan 1, 1996

  • SME-ICGCM
    Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem Simulation

    By D. Su

    This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline

    Jan 1, 1990

  • SME-ICGCM
    Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study

    By P. Tsang

    The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different

    Jan 1, 1989

  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)

    By Alan A. Campoli

    The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of

    Jan 1, 1996

  • SME-ICGCM
    Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study

    By Sandin E. Phillipson

    The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area

    Jan 1, 2012

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • SME-ICGCM
    Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits

    By Krzysztof Kotwica

    The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in

    Jan 1, 2006

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control

    By Sudhir Kumar Kashyap

    In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of

    Jan 1, 2012

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996