Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Deformation Development Around Mine Roadways And Simulation Of Roadway Supports

    By E. Yasar

    This paper describes the use of the sand and plaster physical modelling technique to investigate the deformation around mine roadways using a variety of support methods in a particular form of stress

    Jan 1, 1995

  • SME-ICGCM
    Introduction to Rock Strength Borehole Probe (RSBP) for Estimation of Rock Strength in Roofbolt Drill Holes

    By I. Sedat Buyuksagis, Jamal Rostami, Ali Naeimipour

    "Improving the safety of underground openings and optimizing ground support systems requires reliable ground characterization. This includes understanding the joints, discontinuities, and rock strengt

    Jan 1, 2016

  • SME-ICGCM
    Calibrating LaModel for Subsidence

    By Keith A. Heasley, Jian Yang

    "LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He

    Jan 1, 2016

  • SME-ICGCM
    A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate Road

    By Stephen P. Signer

    A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r

    Jan 1, 1990

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    Effect of the Approaching Longwall Faces on Barrier and Entry Stability

    By Klaus-Dieter Beck

    RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred

    Jan 1, 2004

  • SME-ICGCM
    Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)

    By Ed Mchugh

    Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co

    Jan 1, 1999

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    Numerical Modeling Of Longwalls In Deep Coal Mines

    By Salah Badr

    Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar

    Jan 1, 2003

  • SME-ICGCM
    Design Considerations For Cable Truss Secondary Supports In Roadways Of Underground Collieries

    The purpose and current practice of cable trusses in underground coal mines is briefly outlined and details of various cable truss designs are presented. The main part of the paper describes the in-si

    Jan 1, 1992

  • SME-ICGCM
    Application Of Seismic Tomography For Assessing Yield Pillar Stress Conditions

    By Michael J. Friedel

    The fundamental problems associated with ground control reflect the inability of mining personnel to "see" the development of anomalous conditions. Toward this end, the U. S. Bureau of Mines is invest

    Jan 1, 1993

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Flexibolt Flexible Roof Bolts: A New Concept For Strata Control

    A high strength steel strand bolt has been developed by Barrett, Fuller & Partners as a replacement for conventional rigid bars for primary roof support in coal mines. It is based on a 23mm diameter m

    Jan 1, 1993

  • SME-ICGCM
    Design Of Shield Supports For The U.S. Coal Mining Industry

    By Alan Peacock

    Shield supports have been in use in the USA underground mines since 1975, and their development in the intervening time has been progressive and inovative. Specialized techniques are used to optimize

    Jan 1, 1981

  • SME-ICGCM
    Assessment of the Dynamic Loads Effect on Underground Mines Supports

    By Kazem Oraee-Mirzamani

    Blasting operations generate seismic effects in underground mines. These effects apply additional dynamic loads on the support system, which should bear both static and dynamic loads. Static loads are

    Jan 1, 2011

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    Stress Measurements for Safety Decisions in Longwall Coal (4b24fd83-539f-4e52-8928-06b50544afce)

    By Eric Zahl

    Researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health, Spokane, WA, have collaborated with three Western longwall coal mines in an ongoing effort

    Jan 1, 2002

  • SME-ICGCM
    A Comparison Of Overburden Response Due To Longwall Mining

    By David K. Ingram

    The objective of this U.S. Bureau of Mines (USBM) investigation was to characterize overburden response due to longwall mining. Subsurface strata and surface deformations were monitored at two sites i

    Jan 1, 1994

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997