Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Key Technologies of Integration of Coal Mining–Gangue Washing–Gob Backfilling
By Wei Yin, Yu Wu, Xiexing Miao
"For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in
Jan 1, 2015
-
Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams
By Jinwang Zhang, Zhaohui Wang, Jiachen Wang
"Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal
Jan 1, 2017
-
Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground Conditions
By Kirk W. McCabe
RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un
Jan 1, 1981
-
Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes
By Ken Mills
Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long
Jan 1, 1999
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)
By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
Techniques To Increase Yield Pillar Residual Strength
By Dennis R. Dolinar
The U.S. Bureau of Mines has modeled yield pillars to determine the effects of reinforcement techniques on pillar performance. Model pillars with width-to-height (w/h) ratios ranging from one to four
Jan 1, 1993
-
Method Of Selecting Suitable Types Of Powered Supports At Longwall Faces
By S. M. Hsiung
A model (support selection model) for the selection of suitable types of powered supports under various geological conditions is proposed. This model is developed by evaluating the support, performanc
Jan 1, 1988
-
The Failure Mechanism and Control Technology of Coal Wall of a Large Mining Height Panel
By Dezhong Kong, Jaichen Wang, Shengli Yang
"The stability control of longwall coal face is the key technology of large-cutting-height mining method. Therefore, a systematic study of the factors that affect coal face stability and its control t
Jan 1, 2015
-
Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining
By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes
"Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results
Jan 1, 2010
-
Floor Heave Control Outby the Seal Line in No. 11 West Kentucky Seam
By Joel Bradley, Kot Unrug, Kyle Perry, Mark Klimek
"A West Kentucky mine operation in No. 11 seam, encountered floor heave, due to the localized increase of the thickness in the fireclay mine floor. Floor heave has overridden seals installed in two mi
Jan 1, 2015
-
International Practice in High Performance Underground Thick Coal Seam Extraction and Related Ground Control Challenges
By Bruce K. Hebblewhite
This paper provides an overview of the international ?state of the art? with respect to underground coal mining methods used in seams of thickness greater than 4.5 m, through a review of a selection o
Jan 1, 2013
-
Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming
By Collin L. Stewart
A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog
Jan 1, 1995
-
Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)
By Douglas Scott
Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research
Jan 1, 2004
-
Support Selection For The Multi-Lift Mining Method
By Claude A. Goode
Large quantities of high grade coal exist in thick seams in the United States. Many of these thick seams are too deep to be surface mined and do not lend themselves readily to underground extraction.
Jan 1, 1981
-
Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)
Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest
Jan 1, 1992
-
Roof Bolting in Low Seam Mining with Thick "Stack Rock" Roof under High Horizontal Stress
By Peter Zhang, Gary Deemer, Rod Lawrence, Scott Peterson, Scott Wade, Mike Mishra, Rick Smith, Robert Bottegal, Ed Zeglen
"Thinly-laminated silty shale that falls like ""stack rock"" is always difficult to support in underground coal mines. With thin laminations of 2.5 to 52 mm (0.1 to 2 in) thick and weak bonding betwee
Jan 1, 2010
-
Renewed Interest In Prop Supports As A Replacement For Wood Cribs
By Thomas M. Barczak
Wood cribs have been the dominant form of supplemental support in coal mining for many years. Recently, there has been a renewed interest in prop supports as a replacement for wood cribbing due to the
Jan 1, 1995
-
Status Of Longwall Research In CSIRO
By Michael Kelly
Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th
Jan 1, 2001
-
Longwall Production, Maintenance, And Roof Control System
By W. Mark Hart
The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position
Jan 1, 1994
-
Preventing Falls Of Ground In Coal Mines With Exceptionally Low-Strength Roof: Two Case Studies
By Christopher Mark
Mines with exceptionally low-strength roof (UCS <3,500 psi and CMRR <40) are much more likely to struggle with roof falls than other mines. Weak-roof is a particular problem for many room and pillar m
Jan 1, 2004