    Mountain Mass Surrenders to Man's Initiative & Daring

    By Yogesh Narula

    Nevis Bluff Landslide - On September 17” 2000, a rockfall measuring lO,OOOm3 at Nevis Bluff, New Zealand, triggered a loday emergency. It ended when a hazardous column of rock that towered over State

    Jan 1, 2002

  • ISEE
    Update on Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    This paper is an update on a paper presented at the 2022 ISEE conference. The original paper presented how the mine operator desired to open up ore reserves near several mine structures including two

    Jan 21, 2025

  • ISEE
    A Blasting-induced vibration control approach for resuming blasting activity near tailing dams in the Quadrilátero Ferrifero region after “Brumadinho Dam Colapse”.

    By Marcus Neves, Eventomar Junior, Adilson Castro, Leandro Silveira, Sérgio Augusto

    The collapse of the Vale S.A. mining tailings dam in 2019, a tragic event that shook Brazil and the world, had consequences that transcended the immediate pain and devastation. Among them, the suspens

    Jan 21, 2025

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    Enhancing Blast Performance Evaluation through 3D Muck-pile Fragmentation Analysis: Overcoming Surface-Based Limitations

    By O. Cermak, F. Degonld

    Although 3D fragmentation analysis is a relatively new technology, it is rapidly gaining popularity among mid-sized mining operations and quarries. The results provided by this technology are adequate

    Jan 1, 2024

  • ISEE
    Use of Visualization Tools for Drill and Blast Activities

    By Carlos Alvarado, Hernan Narea, Jhon Silva, Bryan Townsend, Katherine Gil, Brayan Caceres, Felipe Pontanilla

    With the promising development of new technologies, automation in Drill and Blasting (D&B) is on the horizon. The data generated in all D&B activities, which is currently segregated, can be linked to

    Jan 21, 2025

  • ISEE
    New Technologies in Electronic Blasting For Enhanced Safety and Productivity

    By Raphael Trousselle, William Reisz

    The blasting industry is now well into its second decade of commercial use of electronic detonators. As an increasing number of blasters are introduced to the technology, the benefits are becoming mor

    Jan 1, 2012

  • ISEE
    Analysis of Annual-Delayed Successive (4D) Geophysical Charges in a Borehole

    By D. Preece

    The mining and oil industry employs techniques such as geologic mapping, core drilling and electromagnetic and potential field techniques to explore for new deposits. Since new discoveries of major ne

    Jan 1, 2011

  • ISEE
    The Use of Numerical Modeling to Enhance Fines Predictions

    By A. S. Tawadrous

    Fines are produced in any blasting application. Depending on the application, fines may or may not be a desirable product of the blast. In most quarry and construction applications, fines are consider

    Jan 1, 2012

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011

  • ISEE
    More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design

    By Paul Klaric, Nicholas Bodley

    Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the

    Feb 6, 2023

  • ISEE
    Application, monitoring, and control of vibrations induced by underground rock blasting using a near-field methodology

    By A. Gontijo, A. Matos, P. Lincoln, L. Fonsecail

    This paper investigates how to manage and model the vibrations caused by rock blasting in a Brazilian underground mine. Considering the frequent detonations and the previous lack of effective vibratio

    Jan 1, 2024

  • ISEE
    Blasting Techniques to Prevent Coal Loss and Damage

    By Visitor Makiyi, Chris Batten

    Poor coal recovery due to coal damage or loss caused by blasting can have a significant impact on a mining operation. Increasing coal recovery by reducing blast damage can provide a significant opport

    Jan 21, 2025

  • ISEE
    Designing Blasts by Simulation Rather than Solely by Trial/Error

    By Roger Favreau, Patrice Favreau

    Without blasting there can be no roads, no hospitals, no factories, not even foundations for homes. Yet in 1960 the only way to design a blast was by trial/error. By comparison, bridges were already d

    Jan 1, 2013

  • ISEE
    NOx Detection in Video Data Based on Ensemble Machine Learning

    By Emmett J. Ientilucci, Martin Held, Xuesong Liu

    Mining is crucial for advancing technology and science by providing essential resources and materials. Quarry blasting, a necessary process in mining, releases these resources and chemicals, driving r

    Jan 21, 2025

  • ISEE
    Contribution of Up-to-date Modeling and Blast Surveying Technologies to the Improvement of Semi-empirical Flyrock Models

    By Ricardo Chavex, Adrien Letellier

    Flyrock remains one of the most critical issues in open-pit blasting. Despite the significant improvements made with modern surveying methods, the necessity remains to define sensible danger zones aro

    Jan 21, 2025

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    The Effect of Precise Millisecond Delay on Fragmentation at the Rock of Ages Quarry

    By Raymond H. Green, Mitchell W. Green

    The authors examined the application of precise millisecond delay electric blasting at a well-known Vermont quarry. The paper explains how the use of a new high-accuracy electric delay detonator has i

    Jan 1, 1986

  • ISEE
    Pump Safety Tests Regarding Emulsion Explosives

    By Hans Perlid

    In the handling of emulsion explosives pumping is a key operation. A number of serious accidents has shown that pumping can be a risky operation and should be care&lIy considered and investigated. Thi

    Jan 1, 1996