Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Preblast Surveys and a Look at Today's Seismographs: A General LookBy Randall M. Wheeler
Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a
Jan 1, 1992
-
Exclusion Zone Optimization: Application of New Digital Technologies Allowing Ore ProductionBy Jair Alarcón, Lucas Steffen, Leopoldo Muñoz
Flyrock is one of the most significant hazards associated with blasting in open pit mining, especially for blasting operations near communities. Flyrock can lead to severe injuries, fatalities, and pr
Jan 21, 2025
-
Gas control station for blasting process to fulfil the environmental goals set by the Chilean Ministry of Health.By Manuel Gutierrez, Roberto Gomez, Juan Aravena, Johan Gjoevad
The use of explosives in mining operations is a process that involves the search for an ideal explosive for the type of geological condition of the mineral to be extracted. For the explosives present
Jan 21, 2025
-
Seismic Blasting Between the North PolesBy Lloyd Litwin
The ARTA 2008 Project (Alpha Ridge Test of Appurtenance) was a Canadian Government sponsored deep water seismic survey carried out on the high arctic permanent polar ice cap. This Geological Survey of
Jan 1, 2011
-
Stem Induced Fracturing RevisitedBy Uli Leiste
Two papers are presented which examine Air Deck Blasting, one from a computational aspect and the other from a shock aspect.
Jan 1, 2016
-
Ring Blasting Design Modeling and OptimizationBy María Rocha, Benjamín Cebrián, Roberto Laredo
"Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all
Jan 1, 2017
-
Digitized, Integrated and Optimized Drill and BlastBy Sushil Bhandari, Amit Bhandari
In this paper, a case study is presented of a large global cement company using a cloud and mobile based platform across 17 of their mines consistently over a large number of users over a period of ov
Feb 1, 2020
-
How the USDA Uses Explosives to Remove Beaver Dams in Unique LocationsBy Bruce R. Leland, Steven H. Smith, John D. Paulson
The USDA - Wildlife Services has been removing beaver dams with explosives for over 30 years. This paper will discuss the history of the explosives program, summarize how we've evolved, and highlight
Feb 1, 2020
-
Correlation of Measurement-While-Drilling Parameters to FragmentationBy Kain Petterson, P D. Katsabanis
Blast fragmentation, determined using image analysis was correlated to drill monitoring parameters in an open pit operation. Average fragment size and 80% passing size showed strong correlation with s
Jan 1, 2013
-
A Review of Contemporary Blast Design Data and Rules of ThumbBy David La Rosa, Matthew Craft, Lee Julian
Rules of thumb are ubiquitous in blasting. Typically presented as ratios, they assist with the initial assumptions of blast design and provide guidance for best practice. Examples include the blast ho
Feb 6, 2023
-
Data-driven improvement of active rockburst prevention - case study from Polish underground copper minesBy M. Szumny, P. Mertuszka, K. Fuławka
Multi-face destress blasting is the basic method of reducing rock bursts hazard in Polish copper mines. Blasting operations of this type are carried out regularly, twice a day in order to minimize the
Jan 1, 2024
-
Electronic Initiation Applications at Barrick Goldstrike's Meikle MineBy Ray Slavin, Remi Proulx
The Meikle Mine is a mature underground gold mine utilizing primary and secondary longhole open stoping method with delayed backfill. Combined production with the newly developed Rodeo Mine is 4700 to
Jan 1, 2004
-
The Environmental Disturbance from Special Effects Blasting in Open WaterBy C. Adcock, R. Farnfield, G. Adderley
The use of explosives to create special effects in the film industry is a well-known past time. A recent production required simulation of a large scale water splash from the effect of a statue fallin
Jan 1, 2010
-
Comparison of Micro-Inch In-Plane and Out-of-Plane Resoponse of Cracks to Blast Vibration and WeatherBy Jeffrey Meissner, Mike Waldron, Charles Dowding
Most studies of crack response have focused on opening and closing of a crack in the plane of the wall in which the crack occurs. Crack movement also occurs perpendicular or normal to the plane of the
Jan 1, 2010
-
Preventing Blast Damage to Underground Infrastructure from Open Pit OperationsBy C. Liley
Open cut blasting at the Ernest Henry mine has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project which was conducted to
Jan 1, 2012
-
Ore guiding in underground mining using MWD and machine learningBy J. Sanchidrián, A. Fernández, P. Segarra
The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi
Jan 1, 2024
-
Black Thunder Coal Mine and Los Alamos National Laboratory Experimental Study of Seismic Energy Generated by Large Scale Mine BlastingBy Robert L. Martin, Brian W. Stump, David P. Anderson, David Gross
In an attempt to better understand the impact that large mining shots will have on verifying compliance with the international, worldwide, Comprehensive Test Ban Treaty (CTBT, no nuclear explosion tes
Jan 1, 1997
-
A Delay Sequencing Blasting SystemBy D O. Tan Sky
This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show
Jan 1, 1980
-
Highwall SafetyBy John C. Didlinger, John L. Didlinger
As we begin the pre-blast survey we need to decide on the number of holes needed for production and a detailed highwall inspection. The survey consists of checking the highwall and placement of barrie
Jan 1, 1996
-
Benchmarking Drill and Blast Compliance to Design, A Case StudyBy Alan Tordoir, Mark Roberts
The drill and blast process is a critical function within the production cycle which significantly impacts the ability of an operation to effectively meet its safety and production targets. Acknowledg
Jan 1, 2019