Evaluation of Drilling and Blasting Using Explosives Based on General Adherence of the Drilling and Rock Blasting Plan
By Jair Koppe
The unsatisfactory blasting effect is mainly related to the improper selection of design parameters of drilling and blasting scheme. In order to evaluate the rationality of drilling and blasting schem
Feb 6, 2023
-
Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building
By M V. Van Bers, A L. McAnuff, A Curic
During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca
Jan 1, 1999
-
Rock Fragmentation Prediction Using Machine Learning
By Ankit Jha, RICHARD AMOAKO
In this paper, we examine the challenges associated with the use of empirical rock fragmentation models. We highlight key parameters omitted by these models, and propose a machine learning approach th
Feb 1, 2020
-
Use of Electronic Initiation System in Urban Shaft Sinking Project
By Richard Turnbull, James Purssey
"The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be
Jan 1, 2017
-
Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry
By Toby Forney, Joshua Schoonover
In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,
Feb 6, 2023
-
Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution
By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro
This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model
Jan 21, 2025
-
Structure Responses to a Confined Opening Cut Blast, Sumterville, FL
By Jeff Senules, Oana Meins, Catherine Aimone-Martin, Scott Lanker, Brent Meins
Global wall strains from 4 to 77 micro-strains were measured at three structures adjacent to a highly-confined Florida quarry blast when PPV amplitudes ranged up to 6.05 in/s. Increasing the peak zero
Feb 1, 2020
-
Pyrotechnic Mortar Pressure and Exit Velocity Study
By R. Sibley, K. Perry, E. McCorkle, M. Coy
Black powder has been used in fireworks since the 10 th century in China. To this day, black powder still has a variety of uses, including fireworks, and remains relatively unchanged. Black powder is
Jan 1, 2024
-
Explosives Cost Reduction and Fragmentation Improvement at Inco's McCreedy West Mine
By Steven Townend, Don Wadden
In today's global economy the need to stay competitive is essential for commercial survival and growth. To this end Inco is committed to continuous improvement in its operations. Various aspects of th
Jan 1, 1994
-
Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case Study
By Jose Pineda, Abraham Lindo
The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio
Jan 21, 2025
-
Reducing eyebrow break caused by rock blasting in Malmberget mine
By Zong-Xian Zhang
In sublevel caving mines, serious eyebrow break usually gives rise to lower ore recovery, higher dilution, and worse safety for the people working in the field. For example, chargers must go near the
Jan 1, 2011
-
Underwater Blasting Effects on Structures –A Model Approach
By Chris Breeds, Larry Leone, Jerry Wallace
One of the Authors was recently retained to provide a professional engineering analysis of the potential impacts from underwater blasts used to enlarge intake tunnels at the Cheesman Dam near Denver i
Jan 1, 2012
-
Examination and Comparison of Shock Wave Characteristics in Open-Air Arena Test vs. Shock Tunnel Confinement
By D J. McLane, J T. Rathbun, B T. Lusk
The dynamics of explosive detonations are understood, however recreating a real-world, full scale scenario is costly. The use of a shock-tunnel allows testing to be done on a smaller scale, with the s
Jan 1, 2013
-
Blasting for Rescue Applications
By John Norman
This paper will cover blasting techniques that are applicable to underground and other rescue that involves removing obstacles and breaking rock in close proximity to rescuers and subjects.
Feb 1, 2020
-
Worsey-Silva Equation for Modeling Fragmentation Caused by Row Timing
By J. Silva, T. Worsey
The Worsey-Silva equation determines the optimal row timing for the smallest fragmentation and allows fragmentation models to be adjusted due to row timing. The equation utilizes the concept of dynami
Jan 1, 2024
-
Wight Pit High Grade Wall Slash
By Art Frye, Lee Pratt, Gaichang Zhao, Greg Newman
This paper will discuss the Wight Pit wall slash at the Mount Polley open-pit copper-gold mine that scavenged a high grade block of ore from two double-benches of the pit wall. The Wight Pit orebody,
Jan 1, 2011
-
Journal: Haz Mat 101 / PART 3
By Tom Snyder, John Brulia
PART 3 – UN Identifi cation Markings for the Highway Transportation in Commerce of Bulk Explosives, Oxidizers, and Combustible Liquids
Jan 1, 2015
-
The Effects of Various Wet-Hole Loading Methods on Powder Factor
By Neal Lee
Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,
Jan 1, 2011
-
Gas and Dust Explosion Research at the UKERT Lab
By Jaco van den Berg, Dr. Todor Petrov, Dr. Josh Calnan, Dr. Jhon Silva
This paper shows and reviews the similitudes and differences in explosions generated by high explosives and gas explosions, the reasons why gas explosions are difficult to replicate using high explosi
Feb 1, 2020
-
Predictive Modelling for Equipment Blast Exclusion Zone Reduction
By Kim Henley, Chris Batten
This paper discusses the use of the Orica WildFireTM flyrock model to help mining operations in Australia and Asia minimise blast exclusion zones for equipment, increasing utilisation and productivity
Feb 1, 2020