Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Experimental Investigation into the TNT Equivalency of Electric, Non-Electric and Electronic Detonators

    By Emily Johnson, Catherine Johnson, Ben Sonpon, Kelly Williams

    The effect of length to diameter of the detonator is compared using Ansys/Autodyn 2-D simulations, the results of which are validated experimentally. It was found that higher pressure comes with a lar

    Feb 1, 2020

  • ISEE
    Ring Blasting Mine to Mill Optimization

    By Joel Chipana, Roberto Laredo, Benjamin Cebrian

    Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro

    Jan 1, 2017

  • ISEE
    Air Overpressure Monitoring for Underground Production Blasting Operation in Limestone

    By B S. Petri, N T. Rouse

    Underground limestone mines generally lack air pressure monitoring procedures and instrumentation guidelines. The blasting industry also lacks an applicable source for air overpressure levels that are

    Jan 1, 2014

  • ISEE
    Effect of Presplit Perimeter Control in an Underground Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders

    Feb 6, 2023

  • ISEE
    Perimeter Control Utilising Electronic Detonators

    By John Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration is small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Jan 1, 2012

  • ISEE
    Optimization of Blast Evacuation Zones using the "Exclusion Zone" Module

    By C. Morel, P. Fredes, L. Rojas

    This article presents a comprehensive study on the development and application of the specific module called "Exclusion Zone" created by Orica to determine blast evacuation exclusion zones. This modul

    Jan 1, 2024

  • ISEE
    The Impact of the Explosive’s Energy on Shovel Diggability in an Open Pit Gold Mine

    By Paulo Couceiro, Juan Navarro

    The impact of rock blasting fragmentation and heave on digging performance in open-pit mining operations is usually the first true indicator of blasting outcomes. Within the typical excavation cycle,

    Jan 21, 2025

  • ISEE
    The History of Intraline Distance in the United States

    By Michelle Crull, Susan Hamilton

    Explosives safety requirements in the United States began in 1909 when the American Railroad Institute questioned explosives manufacturers regarding distances necessary to protect employees and proper

    Jan 1, 2010

  • ISEE
    Improving Quarry Production Rates by Reducing Bucket Fill Time

    By Elliott Giles

    "Measuring a blast’s performance based on the bucket fill time or “diggability” has always been achallenge due to the subjectivity generally involved. The diggability of a blast is often based onopini

    Jan 1, 2016

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ISEE
    Baseline Corrections for Mining Blast Vibrations

    By Jhon J. Silva Castro

    Blast vibration records used in mining contain unwanted information in the form of noise due to long-period drifts, background noise, and noise due to the conversion of the analogue signal to a digita

    Jan 1, 2015

  • ISEE
    JKVBOC Blast Movement Model Applications for Ore Control at Open Pit Mines

    By Constanza Bujes, Mark Jones, Graham Crook, Yansan Jamyanbaatar, Sedat Esen

    Tracking ore characteristics such as grade and hardness from its original position into the material handling and processing stages remains one of the key challenges in open pit mining of hard rock de

  • ISEE
    Underground Mega Mass Blasting with Electronic Initiation Near Urban Area (d4770d5b-0062-4b3c-9658-460485a3a3f4)

    By Jean-Francois Lagueux, Andre Pomerleau

    Goldex Mine is an underground mine located near the town of Val-d’Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco

    Jan 1, 2011

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Journal: Haz Mat 101, PART 1 - Hazardous Materials Shipping Papers and Emergency Response Information for Public Highway Transportation

    By Tom Snyder, John Brulia

    Part I is the first of a series of articles by the authors on hazardous materials (HM) transportation safety and compliance for shippers and carriers who offer and transport commercial explosives in c

    Jan 1, 2014

  • ISEE
    Instrumentation of a Structure for comparison of regulations worldwide - Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part II

    By Thierry Bernhard, Johan Finsteen, Charles Dowding, Mathias Jern

    To bring some clarity to how different standards relate to each other a project was initiated within the European Federation of Explosives Engineers (EFEE). The first part of the project was a literat

    Feb 1, 2020

  • ISEE
    OSM Blaster Training Modules for Western Coal Mines and Quarries

    By Cory Loukides, Cathy Aimone-Martin

    Blaster training manuals used by the Office of Surface Mining (OSM) and others are outdated and cumbersome. A new approach has been developed using Microsoft PowerPoint with a Visual Basic overlay to

    Jan 1, 2004

  • ISEE
    Relative Shock And Heave – Underwater, Rock And Thermodynamic Irreversibility

    By Michael Wieland

    The work principle from thermodynamics is used to model the shock and heave for explosives shot in rock or under water, with the latter compared to reported results. The work principle utilizes restri

    Jan 1, 2007

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023