Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blasters Initiate Quality Control of ANFO at the BoreholeBy George E. Jackson
ANFO, as a blasting agent, is used in large quantities in coal surface mines. It can be purchased on the open market or through reliable suppliers. The blaster in the field must assume that his ANFO i
Jan 1, 1978
-
Achieving Non-Duplicated Firing Times in Multipledeck Priming of Individual Blast Holes in Surface Coal Mining Using Non-Electric Down-the-Hole Primers and Electric Surface InitiationBy James Ludwiczak
We are coming to an end of an era in Midwest surface coal mining. For many years, large tracts of coal lands were readily available for sale or lease to surface mine operators.
Jan 1, 1980
-
Fixortm -A New Approach to Neutralizing Landmines and UxoBy Bill Bauet, John Anderson
There are always security concerns when explosives are transported and stored, and these concerns are intensified in peacekeeping operations where explosives could fall into the wrong hands. MREL Spec
Jan 1, 2001
-
Geophysical Exploration, Blasting Parameters, and Fragmentation in QuarriesBy Ivan Kovac, Pero Marjanovic, Branko Bozic
"The paper deals with results of geophysical survey of the rock masses, and the blasting parameterswhich have effect on the fragmentation in quarries . A relationship between the burden, which is the
Jan 1, 1999
-
Influence of Blast Delay Time on Rock Fragmentation in a 22-FT BenchBy Mark S. Stagg, Stephen A. Rholl
The Bureau of Mines is studying blast delay timing influences on rock fragmentation in a series of tests that started in 3-ft concrete blocks, progressed to 45in-bench reduced-scale tests in massive d
Jan 1, 1988
-
Strategy, Innovation and Change - Challenging the Future at the Gregg River MineBy Rick W. Bellenie, Ronald L. Woolf
The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.
Jan 1, 1994
-
Trial Study--Self Consuming Detonators to Reduce Ore ContaminationBy Kurt B. Oakes, Brian M. Fortelka
Unimin Corporation operates an underground Silica Sand mine at Guion, AR located in North Central Arkansas. The Silica Sand deposit at Guion is part of the St. Peter Sandstone Formation, which is over
Jan 1, 1999
-
Priming Procedures Employed at the Tallya QuarryBy Janos Foldesi, Calvin J. Konya
The determination of the number of primers necessary to efficiently initiate an explosive column charge is essential to good blasting. If the number of primer is insufficient, the total energy stored
Jan 1, 1976
-
Pressure Effects on Density of Small Diameter ExplosivesBy R Deshaise, B Mbhanty
The importance of controlling density of commercial explosives, and the various means to achieve it are described. m e field conditions responsible for density changes during blasting and their effect
Jan 1, 1989
-
Improved Methods of Blasting Concrete for Welland Canal RehabilitationBy Ray Jambakhsh, Craig Copping
The St. Lawrence Seaway's Welland Canal has been undergoing a rehabilitation program that requires the removal of deteriorated concrete from the 25 meter high lock walls. Multi million dollar contract
Jan 1, 1994
-
Blast Noise AnnoysBy David E. Siskind
Increased mineral consumption and environmental concern have caused much interest in potential damage and annoyance from ground vibration and airblast produced by production blasting in surface mines
Jan 1, 1977
-
Transient Vibration and Complaints an Emperical Study of Coal Mine DetonationBy Gerald R. Coonan
Laboratory research is being conducted to substantiate suggested levels for voluntary standards on human response to transient vibration. The application of those findings to actual field conditions,
Jan 1, 1982
-
The Electronic Detonator, Security, Handling, Effectiveness and GeophysicsBy Detlef Sulzer, Winfried Rosenstock
"At the end of this century a great breakthrough in the field of blasting technology is finally going tobecome reality. That, in the true sense of the word, is the long expected and desired “HighTechn
Jan 1, 1999
-
The Other Building Boom: Guidelines for the Technical Application of Explosives to Industrial and Commercial Structure DemolitionBy Walt Meglasson
"Developing technologies in demolition equipment and processes have produced a newsophistication within the demolition industry. Yet, with increasing frequency, owners,architects, engineers, and contr
Jan 1, 1993
-
Pneumatic Loading of ANFO UndergroundBy J J. F Smith
The application of pneumatically loaded ANFO for underground mining has continued to increase year by year since the technique was first developed and introduced underground during the early 1960's. I
Jan 1, 1982
-
Use of Corrtex to Measure Explosive Performance and Stem Behavior in Oil Shale Fragmentation TestsBy Gerald G. Schmitt, Richard D. Dick
Continuous Reflectometry for Radius vs Time Experiments (CORRTEX) was used to monitor several conditions of blasts such as the detonation velocity of the explosive column, the functioning of different
Jan 1, 1985
-
Improving Fragmentation and Ore Displacement Control at Homestake McLaughlin Mine Lower Lake, CaliforniaBy Roger Lucas, Dale Nies
The McLaughlin Mine is an open-pit disseminated gold mining operation. Homestake Mining Company's approach to solving some of the blasting problems inherent to this type of deposit provide an interest
Jan 1, 1990
-
Digital Imaging Techniques for Blasting Process Evaluation in FieldBy Stephen H. Chung
Direct visualization of rock movement during blasting is an important key to understanding the blasting process, as well as optimizing blast designs and explosives performance. To achieve this, a digi
Jan 1, 1996
-
A Linear Shape Charge System for Contour BlastingBy Finn Ouchterlony, Gert Bjarnholt, Robert Holmberg
A system for contour blasting with a linear shape charge principle has been studied /10/. In one operation the charge creates two notches along the bore hole wall and breaks the rock mass. The built i
Jan 1, 1983
-
Dewatering Small Diameter Bore HolesBy R J. Hill
Blasters are well aware of the problems and expense faced when trying to load in wet bore holes; problems of poor coupling and poor density, as well as the expense of higher priced cartridge product.
Jan 1, 1986