Load Testing Of Deep Foundations Using The Osterberg Load Cell
By David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line
By Suk han Jang
This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This
Jan 1, 2007
-
An Improved Method For The Prediction Of Pile Bearing Capacity From Dynamic Testing
By R. T. Stain
Dynamic methods of load testing piles using a drop hammer to generate the input force have been in use for many years. These systems are based on the wave equations developed at the Case Institute of
Jan 1, 1989
-
Simbat : High Strain Dynamic Test Of Piles
By Dominique Vié
Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera
Jan 1, 2002
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test
By Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.
By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part One
By Christian Divis
[ ]
Jan 1, 2002
-
Overview Of Earth Retaining Systems And Their Selection
By Raymond J. Castelli
The paper provides a general overview of the numerous types of earth retaining systems currently available, and organizes these various systems by several classification methods. These classifications
Jan 1, 2003
-
Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)
By Paul W. Mayne
Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model
Jan 1, 2009
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting
By Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire
By J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
New Method for Reduction of Settlement Drilling Casings for Steel Core Piles
By Larsson Lars-Erik, Rani Isa, Martin Jönsson, Håkan Bredenberg, Mats Larsson
"IntroductionSteel Core Piles are used extensively in Scandinavian countries, where hard rock is found within reasonable depths. A steel core is cast into a drilled steel tube casing and a rock hole i
Jan 1, 2014
-
Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam
By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett
"A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu
Jan 1, 2017
-
Wanapum Dam Repaired Using Post-Tensioning Anchors
By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein
In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o
Jan 1, 2018
-
Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project Description
By Daniel J. Rider
In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from
Jan 1, 1987
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
The Use of the Expander Body with Cast in Situ Piles in Sandy Soils
By Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology
By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Developments For Mitigating Measures From Deep Shafts Of North/South-Line Amsterdam
By Klaus Pöllath
This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions
Jan 1, 2006
-
A Historic Capitol And A Deep Excavation
By Richard F. Sliwoski
The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the
Jan 1, 2006