Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Examples Of The Use Of Temporary Works Soil Nailing In The UK And Ireland

    By Martin J. Pedley

    The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c

    Jan 1, 2000

  • DFI
    Innovative Construction Techniques Used At North Shore Construction Project

    By Kanchan K. Sen

    The North Shore Connector (NSC) project will extend the Allegheny County Port Authority?s Light Rail Transit System from downtown Pittsburgh below the Allegheny River to the North Shore via twin bore

    Jan 1, 2010

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • DFI
    Drilled Pier Foundations In Expansive Soils ? Synopsis

    By F. H. Chen

    the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri

    Jan 1, 2010

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • DFI
    Analysis Of Static And Dynamic Horizontal Load Tests On Steel Pipe Piles

    By Pastsakom Kitiyodom

    In order to estimate the deformation and load distribution of a single pile subjected to dynamic horizontal load as well as vertical load, a simplified method of three-dimensional numerical analysis,

    Jan 1, 2006

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • DFI
    Oakland Airport Roadway Project - Synopsis

    By David S. Yang

    The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc

    Jan 1, 2001

  • DFI
    Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading

    By Nabil F. Ismael

    The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al

    Jan 1, 2008

  • DFI
    Instrumentation And Interpretation ? Introduction

    By H. Mori

    The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content

    Jan 1, 1991

  • DFI
    Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.

    By Peter O. Wilkinson

    Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a

    Jan 1, 2006

  • DFI
    A Simple Evaluation Of Dynamic Pile Tests

    By D. Kolymbas

    A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r

    Jan 1, 1989

  • DFI
    Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - Synopsis

    By John A. Dal Pino

    This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th

    Jan 1, 1996

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • DFI
    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • DFI
    TPT Piling System - An Introduction To TPT Piles

    By Stan Merjan

    Composite piles with precast concrete tapered pile tips (TPT Composite Piles - U.S. and foreign patents) are a new and important addition to the piling types available to the construction industry. TP

    Jan 1, 1987

  • DFI
    Constructability Of Tiedback Wall Systems - I. Introduction

    By Thomas C. Anderson

    Tiedback walls are now recognized and accepted as a good solution for a variety of structural problems: ? Retaining Walls and Bridge Abutments in cut situations ? Landslide stabilization ? Rep

    Jan 1, 1991

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009