Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    SmartEXEC Implementation Goldcorp Eleonore Project

    By Michel Massé

    Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O

    Aug 1, 2013

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • CIM
    Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity Recoveries

    By Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon

    "Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have

    Jan 1, 2011

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken Rock

    By T. G. Joseph

    A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi

    May 1, 2002

  • CIM
    Development of AERO® MX3048 Promoter for MMG Sepon Concentrator, South Central Laos

    By Tony Moore, Peter Riccio

    "MMG (Minerals and Metals Group) operates the LXML Sepon’s mineral processing facility located 40 kilometers north of the town of Sepon, in the Savannakhet Province, Lao PDR. The Sepon copper plant pr

    Jan 1, 2011

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Island Copper Mine Milling for Copper and Molybdenum

    By Chris Brown

    "The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil

    Jan 1, 1975

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Improving Machinery Reliability Through Condition Based Maintenance

    By Alan D. Akerman

    This paper describes the significant advantages and improvements in operational availability, reduced breakdowns, and overall cost reductions that can be achieved through the application of a Reliabil

    May 1, 2002

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Assessment of the efficiencies of auxiliary ventilation systems using empirical methods

    Increasing depths and mechanization of underground mines have led to the production of large amounts of gaseous and particulate contaminants. Over 100 000 lives have been lost due to methane gas and d

    Sep 1, 2001

  • CIM
    Une analyse du développement minier du Nord-Ouest Quebecois

    By Jean-Marc Lulin

    "Depuis 1906, près de 130 gisements ont été découverts dans la inture archéenne polymétallique (Cu, Zn, Au, Ag) du nord-ouest québécois. Une étude régionale du développement du potentiel inier est pré

    Jan 1, 1989

  • CIM
    Mining Industry-Specific Institution Building for Environmental Reporting

    By Knud Sinding

    Environmental reporting by mining firms takes many forms and change frequently. The objective of these reports is related to increasing the legitimacy of mining firms with their diverse stakeholders.

    May 1, 2002

  • CIM
    Vibration analysis of mining shovels

    By P. N. Saavedra, E. A. Salamanca

    "The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl

    Jan 1, 2002

  • CIM
    A New Design Approach of Roadside Cut Rock Slope Based on Ecological Environment Protection

    By Lian-Jin Tao

    With fast development of China modernization, road construction obtains great achievement. However, in the construction process of highway, especially the high-grade highway in mountainous area, there

    May 1, 2009

  • CIM
    Is Your Management Control Loop Functioning

    By John D. Campbell

    "IS YOUR MANAGEMENT CONTROLLOOP FUNCTIONINGMineral processors make use of hundreds of control circuits in their mills, process plants, smelters and refineries, to optimize throughput and recovery and

    Jan 1, 1985