Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ecological Engineering and Biological Polishing Methods to Economize Waste Management

    By M. Kalin

    "SUMMARYWaste management in general, and the water treatment of mine and mill effluents, has become an ever increasing burden for mining operations. A reduction in these expenditures would undoubtedly

    Jan 1, 1988

  • CIM
    Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation Method

    By G. Zhu

    The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist

    May 1, 2008

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • CIM
    The Use of a Laboratory Centrifugal Separator to Study Gravity Recovery in Industrial Circuits

    By Y. Shu, A. R. Laplante

    "A laboratory Knelson Concentrator (LKC), 7.5 cm in diameter, was used to study the performance of a similar unit at plant scale, 76 cm in diameter, This paper reports on sampling and assaying procedu

    Jan 1, 1992

  • CIM
    The Lonmin Floatability Characterization Test Rig (FCTR) experience

    By E. V. Manlapig, K. R. Rahal, J-P Franzidis

    "The Floatability Characterisation Test Rig or FCTR is a highly instrumented, mobile flotation pilot plant built by Baker Process (now EIMCO) for the AMIRA P9 Project for use in flotation plant modell

    Jan 1, 2002

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    Au L3-edge XANES Analyses for spr-Au/Al2O3 Catalyst

    By S. Nagamatsu

    Alumina supported gold catalyst prepared by spray reaction method (spr) provides gold particle with about 20 nm of diameter. The gold particle size is larger than conventional gold catalysts. However,

    Oct 1, 2003

  • CIM
    The use of wetlands for effluent polishing at Placer Dome, Campbell Mine

    By Benoit Bissonnette, David Gelderland

    "The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi

    Jan 1, 2003

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015

  • CIM
    Aerophine® 3418A Promoter – The Canadian Collector – 50 Years of Improved Metallury in Various Applications

    By F. Bruey, T. Bruce, D. R. Nagaraj, W. Thomas, P. Riccio, E. Guitard

    "AEROPHINE® 3418A Promoter is a flotation collector that has been an industry standard in the Canadian mineral processing industry since its first commercial use at the Kidd Creek concentrator in 1980

    Jan 1, 2015

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    Interactions between Slurry Density and Grinding Media Size

    By Claude Bazin, Patricia Obiang

    "The slurry density (pulp percentage of solids) and the size of the grinding media are often used for the optimization of an operating ball mill. In many cases a change of ball size is made at the slu

    Jan 1, 2007

  • CIM
    Biological Sulphide Production for Process and Environmental Applications

    By Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil

    "The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be

    Jan 1, 2006

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • CIM
    Validation of High Fidelity Simulation Wear Predictions in Various Types of Mineral Processing Equipment

    By John A. Herbst, Xiangjun Qiu

    "Prediction of wear on a microscale level in mineral processing equipment turns out to be a challenging undertaking. This is particularly true for cases in which the objective is to use such predictio

    Jan 1, 2007

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Freeport McMoran El Paso Refinery Steam Control

    By Bradford C. Wesstrom, Ricardo Parra

    The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at

    Jan 1, 2019