Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Function of Nova Scotia Coal In a Time of High-Priced Energy

    By L. P. Chrismas

    "IN 1975, Nova Scotia produced 1.8 million tons of coal with a FOB mine value of $47.6 million. Of this total, about 30 per cent or 600,000 tons was coking coal and the remainder was steam and industr

    Jan 1, 1976

  • CIM
    Geology and exploration, McDame asbestos deposit, Cassiar, B.C.

    By A. A. Burgoyne

    "The McDame chrysotile asbestos deposit located near Cassiar in northern British Columbia isfound at depth and on trend to the southeast of the currently mined open-pit Cassiar asbestos deposit. The u

    Jan 1, 1986

  • CIM
    Adsorption of Gold From Au(III)-Chloride Solutions on Alternative Materials to Activated Carbon Inorganic Materials

    By T. Feldmann, G. P. Demopoulos

    The adsorption of gold complexes on inorganic metal oxides has been mainly discussed in geochemical literature, but it is also of interest to the hydrometallurgical industry. This is so because it cou

    Jan 1, 2015

  • CIM
    Géologie de la Mine Doyon, Cadillac, Québec

    By Pierre Sauvé, Guy Perrault, Armand Savoie, Pierre Trudel

    "La Mine Doyon est une entreprise détenue à parts égales par Cambior Inc. et par Minerais Lac Ltée qui en est l'opérateur. Les statistiques de production au 1"" janvier 1990 indiquent que, depuis le d

    Jan 1, 1990

  • CIM
    Underground Crusher Dust Control at Lake Shore Mine

    By O. E. Andrew

    THE object of this paper is to present a brief summary of the dust control system in use on the 3,825-foot level at the jaw crusher station, Lake Shore mine. During the years 1936 and 1937, dust surv

    Jan 1, 1941

  • CIM
    Les gisements d’or de la SOQUEM – Silver Stack, Canton Bousquet, Québec

    By Clermont Lavoie, Marc Filion, Marcel Vallée

    "Les mineralisation d'or des gîtes de la SOQUEM - Silver Stack dans is canton Bousquet se situent dans une bands de roches pyroclastiques asides du groupe de Blake River, d'âge archéen, dans le même h

    Jan 1, 1977

  • CIM
    A Modern Approach to Open-Pit Blast Design and Analysis

    By R. F. Favreau, L. C. Lang

    "In modern blasting technology blasts are designed and analysed on an energy-mass-time relationship. The energy of the explosive is derived by computer analysis and the work potential of the available

    Jan 1, 1972

  • CIM
    Lac Cinquante Uranium Deposit, Western Churchill Province, Nunavut, Canada

    By A. Berry, N. R. Banerjee, C. S. Finnigan, M. Fayek, N. J. Bridge

    Lac Cinquante is a mineralogically simple, vein-hosted uranium deposit in Archean basement rocks (Angikuni greenstone belt) that originally were unconformably overlain by Proterozoic sedimentary and v

    Jan 1, 2013

  • CIM
    Laboratory apparatus for measuring radon emanation from solids

    By M. P. Brameld, G. Archambault, R. H. McCorkell

    "The rates. J. at which materials emit radon are of interest in studies of the sources of radon in mines. buildings. soils overburden and other places where it may indicate the location of ore or be a

    Jan 1, 1981

  • CIM
    Selective Leaching of Gold from an Oxidized Copper-Gold Ore by Stage Cyanide Addition: Experimental Study and Industrial Application

    By P. L. Li, B. X. Song, C. H. Wang, T. Wang, Z. Hu

    "The treatment of an oxidized copper-gold ore by stage cyanide addition was investigated. For cyanidation, free cyanide ion concentration can be an indicator of whether there is copper dissolved in cy

    Jan 1, 2016

  • CIM
    Relationship between mineral deposits and geologic domains of the Abitibi Volcano-Plutonic Belt of Northwestern Quebec (1bfb6279-27f7-4a75-8482-2fe66a75eac0)

    By Alain Simard, André Gobeil, Sylvain Lacroix, Maurice Rive, Denis Racicot, Pierre Verpaelst

    "The Abitibi volcano-plutonic belt forms the major portion of the Abitibi lithotectonic subprovince in the Superior Province. The Abitibi belt is composed essentially of"" (1) approximately 2.7 Ga old

    Jan 1, 1990

  • CIM
    Relationship between mineral deposits and geologic domains of the Abitibi Volcano-Plutonic Belt of Northwestern Quebec

    By Alain Simard, Andre Gobeil, Sylvain Lacroix, Maurice Rive, Denis Racicot, Pierre Verpaelst

    "The Abitibi volcano-plutonic belt forms the major portion of the Abitibi lithotectonic subprovince in the Superior Province. The Abitibi belt is composed essentially of"" (1) approximately 2.7 Ga old

    Jan 1, 1989

  • CIM
    Advanced Blasting Technology for Large Scale Destress Blasts at Brunswick Mine

    By Qian Liu

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick Mine. Two large regional pillars were established on the 1000 m Level to support the ground for safe extra

    May 1, 2003

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • CIM
    Educating mining engineers for the 21st century

    By Jerry M. Whiting, Neil J. Duncan

    "Does Canada need a mining industry? Isn't it a chronically depressed collection of businesses that pollute the air and water and tear up the countryside? Wouldn't it be better if Canada&apo

    Jan 1, 1988

  • CIM
    The Apex Mine: a case study in small scale underground mining

    By R. W. Guill

    "The Apex Mine is currently scheduled to be brought back into production by Hecla in the first quarter of1990. Its projected productivity rate will be exceptionally high for a small underhand cut and

    Jan 1, 1990

  • CIM
    Carol pellet quality - a decade in review

    By D. Pearcey, S. T. Vessey, V. Hegde, J. Staples

    "Pellet quality has taken on a new dimension during the last ten years. Quality in the seventies was generally defined as adherence to certain physical and chemical specifications. Today, the talk is

    Jan 1, 1991

  • CIM
    Incremental Process Improvements at the Pogo Mill

    By J. Sliwinski, H. Kikutani, J. Atwood, D. Larimer, J. Pyecha

    "The Pogo mine start-up milling targets of 2005 are vastly different than the targets of today. Improvements have been driven by unintentional design oversight, continual circuit optimization or optim

    Jan 1, 2017

  • CIM
    Dispersion Modelling of Air Pollution From Open Pit Copper Mine

    By A. Torkian

    Copper mining operations have increased in Iran in the past decades due to price increases and potential for creating jobs in developing countries. Iran consists of many copper mines. The mining opera

    Aug 1, 2013

  • CIM
    The Aldermac Copper Deposit

    By J. E. Hawley

    "The Aldermac copper deposit is in Beauchastel township, Abitibi county, Quebec. It lies about 11 miles west of Noranda. It has been described by Cooke, James, and Mawdsley(2) and by Bruce(3) and has

    Jan 1, 1954