Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fundamentals to Produce Fe-Mn Alloy by Smelting-Reduction Process
By da Silva C A, Tenorio J. A S, de Assis R M, de Oliveira J R
For Fe-Mn alloy production, two reactions are responsible for this process: the MnO reduction in the slag and the carbon dissolution in the bath. The smelting-reduction process has been studied as a
Jan 1, 1999
-
Commissioning of the Barrytown Ilmenite Pilot Plant
By T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990
-
A Tool for Benchmark Study of Roadway Development Performances
In responding to why some longwall roadway development rates are different among mines, the Roadway Development Task Group (RDTG) of Australian Coal Association Research Program (ACARP) has initiated
Dec 6, 2010
-
The Application of Fuzzy Analytical Hierarchy Processing to Define Optimal Post Mining Land use for Pit Area to Recognise Reclamation Costs in Open Pit Mining
Open pit mining has considerable damaging effects on the environment of the mining region. These harmful influences have to be controlled during mining operation until mine closure. Different sections
Dec 6, 2010
-
Notes on Some Carbonate Minerals in the Iron Ore Deposits of the Iron Duke Area, South Middleback Range, S.A.
Difficulties were experienced in the identification of carbonate minerals intimately associated with iron oxides in the so called carbonate ore, which occurs at depth in the Iron Duke Orebody.Determin
Jan 1, 1963
-
A Cathode Headbar for Zinc Electrolysis: Developments at Risdon, 1917-1957
By Bain J. H
Since zinc was first deposited at Risdon in February, 1917, provision of the most economical cathode assembly has been a subject of extensive research, the major problems being corrosion and efficient
Jan 1, 1958
-
Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania
A unique sluicing process for recovering tailing impounded in a valley was developed by Electrolytic Zinc Company of Australasia Ltd., West Coast Mines, Rosebery, Tasmania.Earthmoving equipment could
Jan 1, 1973
-
Early History of Colonial Mining, in Connection with "Is Scientific Management a Success?"
When the Mining Bill came before the Victorian Legislature not so many months ago, the question arose whether mining managers required education, and to what extent. Some members of the House expresse
-
Reverberatory Smelting Plant, Mount Morgan
During the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States
Jan 1, 1939
-
The New Updraught Sinter Plant at Mount Isa Mines Limited
As part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The
Jan 1, 1968
-
Comparing Drilling Patterns for Coal Reserve Assessment
The criterion for assessing the accuracy of coal reserve estimates proposed by Philip and Watson (1982) is criticized.Following Royle (1977), it is suggested that the global estimation variance found
Jan 1, 1983
-
Evaluation of Post-tertiary Training Programmes Designed to Develop Practical Skills
By Baxter J. L
Post-tertiary training programmes have been designed and produced for geologists at different levels of understanding and expertise in the relationship between gold mineralization and shear zones.
Jan 1, 1989
-
Gold Mining in the Shotover and Kawarau Rivers
Gold was first discovered in the Shotover by Thomas Arthur in 1862. He left his job as a shearer and soon there were up to 3000 miners working over the length of the river. Some parts were extremely r
Jan 1, 1987
-
Valuable Components Recovery from Lead-Zinc Metallurgical Slag
Valuable Components Recovery from Lead-Zinc Metallurgical Slag
Sep 13, 2010
-
The Truth is Stranger than Fiction – the Story of Ridgeway Gold Mine
By G Dunstan
The Ridgeway gold mine has been an enigma of the international underground hard rock community for nearly 20 years. It nearly didn’t eventuate as it was more than 500 m below a farmer’s paddock in Cen
May 9, 2016
-
Swamp Works – A New Approach to Develop Space Mining and Resource Extraction Technologies at NASA’s Kennedy Space Center: Prospecting, Excavation, Load, Haul and Dump for In Situ Resource Utilisation
By A J. Nick, I I. Townsend, J M. Schuler, J D. Smith, R P. Mueller, L Sibille, K Leucht, J J. Fox
The first steps for in situ resource utilisation (ISRU) on target bodies such as the Moon, Mars and near-Earth asteroids (NEA), and even comets, involve the same sequence of steps as in the terrestria
Nov 4, 2015
-
The Pyroxene Granulites and Associated Gabbros of the Fraser Range, Western Australia, and their Economic Significance
The Fraser Range is composed dominantly of basic pyroxene granulites derived from basalts, many of which appear to have been vesicular and pillowed. Acidic and basic garnet-bearing granulites are impo
Jan 1, 1969
-
Geophysical Characteristics, Deep Structure, Magmatism and Metallogeny of the Pacific Belt
By L A. Maslov
We have considered the following characteristics of the crust and upper mantle of the Pacific Belt: seismic wave velocity anomalies, mechanical stress and shear deformation rate fields, heat flow and
Jan 1, 1995
-
High Grade Metamorphic Structures in the Broken Hill Orebody
The Broken Hill orebody ,occurs in the Willyama Complex, a block of Precambrian rocks which have been strongly folded and metamorphosed at moderate to high grade. Although -the origin of the silver-le
Jan 1, 1975
-