Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009

  • AUSIMM
    Using Geostatistics to Assist in Optimising Grade Control Estimation at KCGM's Fimiston Open Pit

    By Kelly D, Moore C

    The Golden Mile, which has been mined continuously for the past 100 years by both underground and more recently open pit methods, occupies an area of 1.2 km by 4 km adjacent to the city of Kalgoorli

    Jan 1, 1994

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Calculating Similarity Among Geological Simulated Images and Reference Images Using Principal Component Analysis

    By E Cunha, D Roldao, TáTamantini, J F. C L Costa, T Webber, C Monteiro

    The main problem of geostatistical simulations is to reproduce the real characteristics of the mineral deposit when there are few conditioning data. In this case, the geological interpretation, based

    Sep 26, 2011

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Australia's Mineral Resources- A Vital Role: An Uncertain Future

    The long-term outlook Tor Australla's traditional mining products is for flat demand and continuing low prices. This has come about because of three far-reaching changes since earlier boom day

    Jan 1, 1987

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    New Insights into the Formation, Structural Development and Preservation of Iron Ore Deposits in the Northern Cape Province, South Africa

    By D J. Alchin

    Most of South AfricaÆs high-grade iron ore resources are hosted within a fault-controlled structural basin in rocks of the Palaeoproterozoic Transvaal Supergroup in the Northern Cape Province of South

    Jan 1, 2007

  • AUSIMM
    Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston Mine

    By G E. Smith, G N. Lye

    Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional

    Jan 1, 2001

  • AUSIMM
    Geochemical Characteristics of River Deposited Mine Wastes and Associated Contact Waters Downstream of the Ok Tedi Mine, Papua New Guinea ù Implications for ARD Management

    By H Kundapen, B R. Bolton, H Davies

    The Ok Tedi porphyry copper-gold mine is located in the Star Mountains of Western Province, Papua New Guinea. Open-cut mine commenced in 1984 and is due to cease around 2010. The mine produces a total

    Jan 1, 2003

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    Using X-Ray Diffraction for Grade Control and Minimising Environmental Impact in Iron and Steel Industries

    By U König

    The use of high speed detectors made X-ray diffraction (XRD) an important tool for quality and process control in the mining industries. Besides knowledge about the mineralogy of a sample it provides

    Jul 11, 2011

  • AUSIMM
    Impact of Electronic Blasting Detonators on Rock Quarry Environment, Productivity and Energy Savings

    By M Bilodeau, G Caro, R Beaudoin, D Labrie

    In 2005, Dyno Nobel Canada Inc, DynoConsult and CANMET-MMSL used their pool of expertise in blasting, ground control, open pit and underground mining, mineral processing, information technology and ap

    Jan 1, 2007

  • AUSIMM
    Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed Permeability

    By A M. Nyembwe, A M. Garbers-Craig, R Cromarty

    With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an

    Jul 13, 2015

  • AUSIMM
    The Rationale for use of Three Heading Gate Roads in Australian Underground Coal Mines

    By R G. Moreby

    The purpose of this paper is to provide the rationale for decision making when considering the use of three heading gate roads in Australian underground coal mines.There are currently 30 underground l

    Jul 1, 2013

  • AUSIMM
    Some Notes on the Equipment of the Electrolytic Zinc Company of Australasia Limited, at Rosebery, Tasmania

    The purpose of this paper is to list by tabulation and flow sheet, the operating equipment and installations in use at Rosebery, and to refer to particular items which may be of interest for purposes

    Jan 1, 1949

  • AUSIMM
    Getting the Burden Right

    By J Poniewierski, Varcos D

    Efficient blasting requires constant vigilance with respect to the actual layout being used in the field. Objective measurement techniques are required in laying out a pattern as the 'by eye&ap

    Jan 1, 1994