    Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons Learnt

    By M Weeks

    Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen

    Mar 8, 2011

  • AUSIMM
    Effect of Drilling Fluid Composition on Penetration Rate

    By Trois P

    A fully instrumented and bench-mounted diamond drilling machine, purpose designed and built, has been used for investigating the effect of aqueous solutions of various chemical compounds when used

    Jan 1, 1992

  • AUSIMM
    Investigation and Modelling of Gas Injection and Mixing in Molten Liquid Processes

    By Nilmani M, Fountain CR

    Injection of gases into slag-melt mixtures produces various zones as a result of bubble formation and disintegration within the melt. The extent of these zones depends on the type of reactor used.

    Jan 1, 1984

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.

    THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,

    Jan 1, 1930

  • AUSIMM
    Mill Scaleup: Ball Collision Frequency and Collision Energy Density in Laboratory and Plant-Scale Mills

    By Mishra BK, Agrawala S

    The traditional method of scale-up uses the population-balance model. In particular, the selection function values for a material are determined in a laboratory mill and a variety of correlations ar

    Jan 1, 1993

  • AUSIMM
    Recovery of Monazite from the Beach Sand Deposits of Eastern Australia

    By Blaskett K. S

    The physical properties of monazite and the minerals with which it is associated in east coast beach sands are studied and discussed. Possible means for improving recovery are examined. In particular,

    Jan 1, 1958

  • AUSIMM
    Acid Mine Drainage Treatment at Herbert Stream, Stockton

    By M Watts, P Lindsay

    Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration

    Jan 1, 2007

  • AUSIMM
    Operation of Large Davcra Flotation Cells in Production and Test Circuits

    Development of the Davcra flotation cell has continued over the past seven years. Preliminary testwork on single cells has now been extended to a com- plete Davcra flotation circuit, to cells ranging

    Jan 1, 1971

  • AUSIMM
    Impact of Longwall Width on Overburden Behaviour

    By Grady PO

    The longwall panels at Clarence Colliery have experienced intermittent sudden weightings on the face that have caused some production delays. These weightings have typically been more severe on the wi

    Jan 1, 1998

  • AUSIMM
    Development of a Coal Seam Water Jet Longhole Drill

    By Just GD, Phillips R

    The application of high pressure water jet technology to the drilling of longholes in coal has resulted in the development of a system currently capable of drilling to lengths greater than 200m. Field

    Jan 1, 1991

  • AUSIMM
    Mining Truck Operations in Association with Truch-Jig Apparatus

    This paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv

    Jan 1, 1989

  • AUSIMM
    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Economic Factors

    A minimum target of economic growth in Australia has been set at 5% per annum growth in G.N.P. at constant prices (Vernon Committee). 2. The core of the problem of sustaining steady growth at this o

    Jan 1, 1971

  • AUSIMM
    Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace

    By Brown D. N, Troth D. A

    Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b

    Jan 1, 1976

  • AUSIMM
    The Geita and Kukuluma Mineralised Trends, Lake Victoria Goldfield, Tanzania ù Orebody Characteristics and Project Planning

    By M Skead, H Michael, R Chase, A Davidson

    Ashanti Goldfields CompanyÆs (AshantiÆs) most recent development is the Geita Project in the Lake Victoria Goldfield of NW Tanzania. It comprises six distinct gold deposits within two mineralised tren

    Jan 1, 2000

  • AUSIMM
    Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid Effluent

    By M M. Collisson

    The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c

    Jan 1, 2001

  • AUSIMM
    Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metal

    By Y Zhang, Z Zhao

    The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t

    Aug 21, 2024

  • AUSIMM
    Performance Enhancement at BHP BillitonÆs Newman Beneficiation Plant

    By G McSpadden

    At September 2001 the beneficiation plant at BHP Billiton Iron OreÆs Mt Whaleback mine is set to treat 9.5 million tonnes per annum (Mtpa) of iron ore, 40 per cent better than original design. This pa

    Jan 1, 2002

  • AUSIMM
    Developments in Ore Handling Methods at Mount Isa Mines Limited

    By Palmer C. G, Rowe P. G

    Ore handling improvements at Mount Isa Mines Limited were necessary to keep abreast of technological advances in all phases of sublevel stoping practice.In the early 1930s an efficient ore handling sy

    Jan 1, 1961