                Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
 - 
                    
                Effect of Drilling Fluid Composition on Penetration RateBy Trois P
A fully instrumented and bench-mounted diamond drilling machine, purpose designed and built, has been used for investigating the effect of aqueous solutions of various chemical compounds when used
Jan 1, 1992
 - 
                    
                Investigation and Modelling of Gas Injection and Mixing in Molten Liquid ProcessesBy Nilmani M, Fountain CR
Injection of gases into slag-melt mixtures produces various zones as a result of bubble formation and disintegration within the melt. The extent of these zones depends on the type of reactor used.
Jan 1, 1984
 - 
                    
                Development and permitting of an underground mine at Cowal Gold OperationsBy J Northfield, L Neesham
The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri
Mar 15, 2021
 - 
                    
                Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,
Jan 1, 1930
 - 
                    
                Mill Scaleup: Ball Collision Frequency and Collision Energy Density in Laboratory and Plant-Scale MillsBy Mishra BK, Agrawala S
The traditional method of scale-up uses the population-balance model. In particular, the selection function values for a material are determined in a laboratory mill and a variety of correlations ar
Jan 1, 1993
 - 
                    
                Recovery of Monazite from the Beach Sand Deposits of Eastern AustraliaBy Blaskett K. S
The physical properties of monazite and the minerals with which it is associated in east coast beach sands are studied and discussed. Possible means for improving recovery are examined. In particular,
Jan 1, 1958
 - 
                    
                Acid Mine Drainage Treatment at Herbert Stream, StocktonBy M Watts, P Lindsay
Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration
Jan 1, 2007
 - 
                    
                Operation of Large Davcra Flotation Cells in Production and Test CircuitsDevelopment of the Davcra flotation cell has continued over the past seven years. Preliminary testwork on single cells has now been extended to a com- plete Davcra flotation circuit, to cells ranging
Jan 1, 1971
 - 
                    
                Impact of Longwall Width on Overburden BehaviourBy Grady PO
The longwall panels at Clarence Colliery have experienced intermittent sudden weightings on the face that have caused some production delays. These weightings have typically been more severe on the wi
Jan 1, 1998
 - 
                    
                Development of a Coal Seam Water Jet Longhole DrillBy Just GD, Phillips R
The application of high pressure water jet technology to the drilling of longholes in coal has resulted in the development of a system currently capable of drilling to lengths greater than 200m. Field
Jan 1, 1991
 - 
                    
                Mining Truck Operations in Association with Truch-Jig ApparatusThis paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv
Jan 1, 1989
 - 
                    
                Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)By Brimblecombe P
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres
Jan 1, 1989
 - 
                    
                Economic FactorsA minimum target of economic growth in Australia has been set at 5% per annum growth in G.N.P. at constant prices (Vernon Committee). 2. The core of the problem of sustaining steady growth at this o
Jan 1, 1971
 - 
                    
                Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast FurnaceBy Brown D. N, Troth D. A
Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b
Jan 1, 1976
 - 
                    
                The Geita and Kukuluma Mineralised Trends, Lake Victoria Goldfield, Tanzania ù Orebody Characteristics and Project PlanningBy M Skead, H Michael, R Chase, A Davidson
Ashanti Goldfields CompanyÆs (AshantiÆs) most recent development is the Geita Project in the Lake Victoria Goldfield of NW Tanzania. It comprises six distinct gold deposits within two mineralised tren
Jan 1, 2000
 - 
                    
                Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid EffluentBy M M. Collisson
The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c
Jan 1, 2001
 - 
                    
                Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metalBy Y Zhang, Z Zhao
The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t
Aug 21, 2024
 - 
                    
                Performance Enhancement at BHP BillitonÆs Newman Beneficiation PlantBy G McSpadden
At September 2001 the beneficiation plant at BHP Billiton Iron OreÆs Mt Whaleback mine is set to treat 9.5 million tonnes per annum (Mtpa) of iron ore, 40 per cent better than original design. This pa
Jan 1, 2002
 - 
                    
                Developments in Ore Handling Methods at Mount Isa Mines LimitedBy Palmer C. G, Rowe P. G
Ore handling improvements at Mount Isa Mines Limited were necessary to keep abreast of technological advances in all phases of sublevel stoping practice.In the early 1930s an efficient ore handling sy