Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Ernest Henry Mine Project - "The Mining Cycle"By T Amiconi
Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly pro
Jan 1, 1998
-
Mine-to-Mill Optimisation ù Research and PracticeMining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v
Jan 1, 2000
-
Extraction Techniques for Airborne Dust ControlBy Browning E. J
The application of conventional dust control systems in British Coal mines has considerably reduced the incidence of pneumoconiosis. A number of new techniques have been developed involving extrac
Jan 1, 1988
-
Reducing the Variability in Dragline Operator PerformanceAustralian coal mines have spent considerable capital on dragline improvements over the last two years. This has included ~$30 M on UDD conversions, >$20 M on new buckets, boom upgrades, electrical up
Jan 1, 2005
-
The Economic Life of a Rock Drill (e7c90118-9ca4-4519-bb2c-97419e088a80)With the use of 36 rock drills of the jackhammer type at the West Lyell Open Cuts of the Mt Lyell Mining & Railway Co, it is of importance to determine the economic as well as the physical life of
Jan 1, 1994
-
Modern Design Practice in Post-Combustion Off-Gas Systems for Metallurgical FurnacesBy B Wiggins, M Russell
Off-gas handling systems are a critical component of modern metallurgical furnaces and typically represent as much as 50 per cent of the total installed smelter capital cost. Inadequate off-gas system
Jan 1, 2002
-
Metals Refining Operations Gold Refining in PNG--A Case Study for the Developing, Operating and Marketing Precious Metals Refining in a Challenging EnvironmentBy Russo S
Metals Refining Operations Pty Ltd (MRO) began refining gold in PNG in 1991 and has undergone continuing growth since then in servicing an everchanging and growing market. MRO's ownership combine
Jan 1, 1997
-
Unravelling the adsorption modes of flotation reagents by atomistic simulationsBy J Lainé, M Badawi, A C. de Araujo, Y Foucaud, C Veloso
Flotation is the one of the most used techniques for the mineral separation of non-ferrous ores worldwide. However, the increase of the complexness along with the decrease of ores liberation sizes oug
Aug 24, 2022
-
A reliable solution for pumping mineral froth with challenging froth volumeBy A Roudnev, P Loderer
Mineral froth pumping utilising centrifugal slurry pumps is a major engineering challenge for both the end users and pump manufacturers. The traditional approach has been to oversize the pump for pump
Aug 29, 2018
-
The Batch Phase Disengagement TestBy Pollard D. M
In the batch phase disengagement test, an organic and an aqueous phase are mixed together for a known period to produce a dispersion which may be either organic continuous (aqueous phase droplets)
Jan 1, 1987
-
Metalliferous Mineralization in the Antarctic PeninsulaThe Antarctic Peninsula consists of accretion complex sedimentary and volcanic rocks, talc-alkaline magmatic are rocks, marginal basin sediments and extension-related alkali basalts, dominantly of
Jan 1, 1987
-
An Investigation Into The Use Of Pyrrhotite As A Cementing Agent For BackfillPyrrhotite is pyrophoric when in a finely divided form. The problems of disposing of large quantities of finely divided pyrrhotite separated out by metallurgical processing from ore are formidable
Jan 1, 1973
-
A Reconnaissance Map of the Bulolo Gold-Fields, Territory of New GuineaTHE absence of any locality maps of the district of Morobe has been seriously felt by mining engineers engaged on the goldfields, and as it was evident at the beginning of operations that the administ
Jan 1, 1928
-
Optimising Coal Seam Preparation Operations with Dozers - an Important Phase in the Mine to Mill ChainBy Scott A
This paper summarises some of the results of the ACARP-JKMRC project 'Optimisation of Dozer Operations in Open Cut Mines'. The work has involved an industry review, design and conduct of f
Jan 1, 1998
-
Latest Experience with Dust Suppression in TunnellingBy Girnau G
The necessity of effective dust suppression measures during excavation work is just as uncontroversial in tunnelling as it is in mining. In many respects, in fact, the applied technology is compara
Jan 1, 1987
-
Crushing and Screening Operations at Bougainville Copper LimitedBy Koginmo V. I
The concentrator at Bougainville Copper Limited has an annual throughput of 48.2 million tonnes/year producing approximately 175,000 tonnes copper, 16.1 tonnes gold, and 50 tonnes silver. Convention
Jan 1, 1988
-
The Western Australian Mineral Research Centre: A Resource for Metallurgical Testwork and R&DThe Mineral Research Centre is located at Perth in the suburb of Waterford, adjacent to Curtin University of Technology and within a Technology Precinct which includes Technology Park. The Centre,
Jan 1, 1996
-
Mine to Mill Reconciliations at Paddington Gold MinePaddington processing plant is located approximately 30 km north of Kalgoorlie on the Menzies Highway and is owned by Placer Dome Asia Pacific. First mining was from the Paddington Pit, but in subsequ
Jan 1, 2003
-
Model Studies of Mining Pillar StabilityBy Szwedzicki T
Uniaxial testing was performed on model pillars to determine the effect of width to height ratio on pillar and surrounding rock mass stability. Samples were modelled in a shape similar to that of du
Jan 1, 1994
-
Gold, Silver and Base Metal Deposits of the Chillagoe District, Australia: Hypothermal to Epithermal Overprinting (33335b9b-7938-472c-8a61-62e4b140b295)By Nethery JE
At the Red Dome and Mungana deposits in north Queensland, Australia, it is proposed that mineralisation and alteration developed as a "telescoped" overprinting continuum, ranging in style from hypoth
Jan 1, 1995