Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries
By William Bookshar
The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f
Jan 1, 1998
-
Further Improvements In The Roof Beam Tilt Method Of Gateroad Support Design
By Peter Cain
Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block
Jan 1, 1993
-
A Method To Determine Expander Spacing For Steel Pipelines In Mining Districts
By Axel Preusse
In the Ruhr district, pipelines of public and private infrastructure are made of cast iron, steel, plastics or asbestos cement. Legal framework, technical regulations and normative standards define wh
Jan 1, 2004
-
Development Of A Statistical Technique For Assessing Sandstone Escarpment Stability
By Hamid Maleki
During the last decade, a significant amount of research has been conducted by Energy West Mining Company, government agencies, academia, and consulting companies to develop predictive tools for asses
Jan 1, 2000
-
Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope Entries
By John Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans
Jan 1, 2011
-
A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines
A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic
Jan 1, 1988
-
Prevention. Control and Management of Coal and Gas Outbursts
By Lu Jiam Zhang
Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di
Jan 1, 1987
-
A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield
By David Newman
The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera
Jan 1, 2002
-
Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining
By Qiang Fu
ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element
Jan 1, 2002
-
Determination Of Limitation Of Roof Layer Separation (LRLS) In Entry Roof
By Wenjun Ju
It's very important to determine the limitation of bed separation in entry roof in order to predict roofs stability and take some necessary precautions. Based on numerical modeling and monitoring
Jan 1, 2001
-
Floor Failure Induced By Lateral Stress Ahead Of Longwall Supports
By J. A. Nemcik
Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein
Jan 1, 1995
-
A Novel System For Automatic Installation Of Cement Grouted Roof Bolts
By A. Mahyera
BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual
Jan 1, 1984
-
Economic Evaluation Of Subsidence Damage Mitigation Techniques
By David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
Effect of the Approaching Longwall Faces on Barrier and Entry Stability
By Klaus-Dieter Beck
RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred
Jan 1, 2004
-
Stability Behaviour Of Coal Mining Tunnels With Different Supports
By B. T. Wells
This work concerns the stress fields encountered around mining tunnels. A critical review is undertaken of the various analytical assessments of the support requirements for mining tunnels. Comments a
Jan 1, 1981
-
Methods Of Controlling Thick And Strong Roof In Longwall Mining
By Deren Zhu
The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat
Jan 1, 1990
-
Geomechanical Substantiation Of Extraction Of Undermined Ore Deposit
By M. V. Kurlenya
The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo
Jan 1, 1990
-
Comparison Of Multiple And Single Entry Roadways For Highly Stressed Longwalls
By Klaus Opolony
The world's most popular method of longwall mining requires multiple entry systems for the panels. In contrast to this mine layout the roadways in German coal mining are used for advanced mining
Jan 1, 2003
-
A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element Modelling
By A. K. Bhattacharyya
The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar
Jan 1, 1992
-
The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan
By S. Mehrdad Heidari
The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a
Jan 1, 2005