Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining

    By Guo Wenbing

    "INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody

    Jan 1, 2015

  • SME-ICGCM
    The Effect of Discontinuities Characteristics on Coal Mine Stability and Sustainability: A Rock Fall Prediction Approach

    By Nikzad Oraee, Parham Khajehpour, Kazam Oraee, Arash Goodarzi

    "Rock fall related accidents continue to occur in coal mines, although artificial support mechanisms have been used extensively [1]. Roof stability is primarily determined in many underground mines by

    Jan 1, 2015

  • SME-ICGCM
    To What Extent the Mechanical Properties of Coal Play Role in Coal Mine Bumps? A Comparison Between Bump and Non?Bump Prone Coal

    By Gamal Rashed

    Coal bump is a sudden manifestation of the release of strain energy stored in a coal pillar (Peng, 2008). It is a very serious mining hazard that adversely affects the safety and productivity of the m

    Jan 1, 2014

  • SME-ICGCM
    Strata Behavior Monitoring of the Sub-Inclination Fully Mechanized Top-Caving Face in Steeply Dipping Extra Thick Coal Seam

    By Dongfeng Yun, Zhu Liu, Wendong Cheng, Zhendong Fan, Dongfang Wang, Yuanhao Zhang

    "For the purpose of studying the strata behavior due to multislicing top coal caving longwall mining along-the-strike direction in steeply dipping extra thick coal seams, the shield support pressures

    Jan 1, 2016

  • SME-ICGCM
    Evaluation Of Mobile Roof Support Technologies

    By Hamid Maleki

    This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l

    Jan 1, 2001

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Study of the Backfill Confined Consolidation Law and Creep Constitutive Model under High Stress

    By Zhikai Wang, Wensheng Lyu, Peng Yang

    "To better understand the mechanical behavior of the compression deformation of backfill under high stresses corresponding to large depths, consolidation compression tests were performed for cemented

    Jan 1, 2017

  • SME-ICGCM
    Stress Environment of Entry Driven Along Gob-Side through Numerical Simulation Incorporating the Angle of Break

    By Pengfei Wang, Guorui Feng

    "The angle of break is the acute angle created by the coal seam bedding plane and caving line formed by roof strata movement after extraction of a longwall panel. It has a significant influence on str

    Jan 1, 2018

  • SME-ICGCM
    A New Approach to the Integrity Testing of Ground Anchorages

    By Andrew Starkey

    Ground anchorage systems in the form of rock bolts are used extensively throughout the world as supporting devices for civil engineering structures such as bridges and tunnels. It is widely recognized

    Jan 1, 2001

  • SME-ICGCM
    Mechanics of Rib Deformation—Observations and Monitoring in Australian Coal Mines

    By Yvette Heritage

    "The risk of fatalities from rib failure is still prevalent in the coal mining industry. This risk has prompted further research to be conducted on rib deformation in order to understand the mechanism

    Jan 1, 2018

  • SME-ICGCM
    Failure Mechanics of Multiple Seam Mining Interactions (f9d85dbe-da66-4f30-9b39-e277c41aff64)

    By R. Karl Zipf

    Multiple seam mining interactions caused by full extraction mining, whether due to undermining or overmining, frequently involve tensile failure of the affected mine roof. The adverse ground control c

    Jan 1, 2005

  • SME-ICGCM
    Bolt Load Changes During Initial Face Advance And Cross-Cut Breakthrough

    By Steve Signer

    The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w

    Jan 1, 2004

  • SME-ICGCM
    Effects of Longwall-lnduced Stress and Deformation on the Stability and Mechanical Integrity of Shale Gas Wells Drilled through a Longwall Abutment Pillar

    By Daniel W. H. Su

    "This paper presents results from a recent study conducted to evaluate the effects of longwall-induced stresses and deformations on the mechanical integrity of shale gas wells drilled over a longwall

    Jan 1, 2016

  • SME-ICGCM
    Letter Of Nomination - 26th International Conference on Ground Control in Mining

    By Christopher Mark

    Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl

    Jan 1, 2007

  • SME-ICGCM
    A Study of the Performance of Glass Fibre Rock Reinforcement Components

    By Jonathan P. Furniss

    The paper describes a range of laboratory tests undertaken on full column resin anchored glass fibre rockbolt systems, to assess all aspects of their performance. Laboratory instrumentation has been d

    Jan 1, 1997

  • SME-ICGCM
    Case Study of the Barro Branco Coal Mine Pillar Burst

    By Fernando O. L. Xavier

    "The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul

    Jan 1, 2017

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010

  • SME-ICGCM
    Coal Pillar Design in Tabas Central Mine of Iran

    By Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar

    "The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the

    Jan 1, 2010

  • SME-ICGCM
    Sandy Creek Waterfall?Case Study of Successful Management of the Potential Impacts of Longwall Mining on a Sensitive Natural Surface Feature

    By Bruce K. Hebblewhite

    BHP Billiton Illawarra Coal operates Dendrobium Mine in an area 10-20km west-northwest of Wollongong in the Southern Coalfield of New South Wales, Australia. The mine recently completed longwall mini

    Jan 1, 2014

  • SME-ICGCM
    Development and Application of the TT Anti?Friction Washer for Use with Tensioned Roof Bolt Systems

    By Thomas A. Cook

    The effectiveness of tensioned roof bolt systems has been well researched and documented over the years (Stankus, 1990, 1991, 1997; Guo, 1997; Denton, 2000; Su, 2007). Higher and more consistent inst

    Jan 1, 2014