Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway

    By Chris Bennett, Drupad Desai, Kirit Mevawala

    INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg

    Jan 1, 2005

  • SME
    Geophysical Assessment Of The Mount Princeton Geothermal Area, Colorado ? Summary

    By M. Batzle

    The upper Arkansas basin has some of the greatest potential for geothermal development in Colorado. Over several summers, students conducted an investigation using seismic, gravity, and magnetics in

    Jan 1, 2011

  • SME
    The Tai Po to Butterfly Valley Aqueduct in Hong Kong

    By Derek. C. Arnold

    In order to meet increasing demands for water supply in the next millennium, the Government of the Hong Kong Special Administrative Region have identified the need for a major new water treatment and

    Jan 1, 1999

  • SME
    Transparency, Deep Sea Mining, and Good Governance

    By Jeff Ardron

    Unlike the first predicted deep-sea mining (DSM) boom 35 years, the public response to the re-emergent possibility of DSM is this time round is not entirely optimistic, with serious economic, social,

    Sep 1, 2014

  • SME
    A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall Mine

    By Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay

    "Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o

    Jan 1, 2019

  • SME
    Study on the effects of scrubber operation on the face ventilation

    For the past four years, the Department of Mining Engineering at the University of Kentucky has conducted a validation study of the CFD Fluent code, by comparing its results against mining-related ben

    Jan 1, 2009

  • SME
    Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method

    By John F. MacDonald

    This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp

    Jan 1, 1985

  • SME
    The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario Operations

    By T. Weatherwax

    As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects

    Jan 1, 2008

  • SME
    Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit Definition

    By R. Benito

    This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace

    Jan 1, 2008

  • SME
    Annual Review 2005 – Mining Review

    By P. A. Plunkert, D. E. Morse, L. McCartan, J. F. Papp

    The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages —basic (mining), intermediate processing, manufacturing of fini

    Jan 1, 2006

  • SME
    Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract

    By David Hake, David Salisbury

    The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT

    Jan 1, 2005

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002

  • SME
    CFD Modeling Of Air Flow In An Open Pit Mine

    By W. Collingwood

    As open pit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in open pit mines i

    Jan 1, 2011

  • SME
    Expediting the Environmental Planning Process for Small Mine Permit Applications

    By Gary J. Fletcher

    Mining and processing activities which are proposed on private land, state leases, or unpatented mining claims are governed by numerous local, state, and federal laws which identify the procedures and

    Jan 1, 1987

  • SME
    Introduction (f248dc61-7d23-42d4-878e-d425d635fc78)

    By Christopher J. Bise

    PRINCIPLES OF MINE PLANNING During the initial planning stages, all mining operations are analyzed and evaluated in a similar fashion. This similarity holds true because the mine-planning procedure ca

    Jan 1, 1986

  • SME
    Injury Prevention: Dependent, Independent, And Interdependent

    By D. E. Poole

    Injury Prevention: Dependent, Independent and Interdependent In recent years, management-directed (dependent)safety programs have lost ground to the more successful self-directed (independent) prog

    Jan 1, 2000

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • SME
    Evaluating Underground Mining Hazards By Fuzzy FMEA

    By S. K. Oraee

    Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he

    Jan 1, 2011

  • SME
    Owner Procured Tunnel Boring Machines––A Discussion

    By A. R. Biggart, A. Walters, G. J. E. Kramer

    The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma

    Jan 1, 2005

  • SME
    Expanding The Limitations Of The MFire Simulation Model

    In 2002 the authors updated the MFire model developed by the US Bureau of Mines. MineFire, developed by Mine Ventilation Services, Inc. (MVS), uses the MFire model to perform mine fire simulations on

    Jan 1, 2011