Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Los Angeles Tunnels Are Expanded With Help Of TBM Monitoring System
During the last 20 years, more than 80 km (50 miles) of tunnels have been constructed in the Los Angeles, CA area. Recent projects include The East Central Interceptor Sewer (ECIS), completed in 2004
Jan 1, 2008
-
Applying Human Factors Engineering To Mining Systems
By Craig Hartley
? A helper stands beside a continuous miner as the operator is at the controls. The operator means to push the stop button but hits the drum rotation start button by mistake. The drum begins to turn a
Jan 1, 1983
-
Mine Ventilation at Kiruna
By Lennart Mukka
The Kiruna Mine in Sweden currently has three ventilation systems. The first two (a new and old system) serve the production areas. The third system is used for the facilities on the former main hau
Jan 1, 2002
-
Two-Seam Mining Stability at OCI’s Big Island Trona Mina
By J. F. T. Agapito
OCI Wyoming mines two flat-lying trona seams that are 3- to 3.5-m- (10- to 11.5-ft-) thick, about10 m (33 ft) apart and 250-m- (820-ft-) deep at its Big Island Mine in Wyoming. Continuous miners and
Jan 1, 2000
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel
By Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
Prospectors and Developers Meeting – Some Reflections
By Bruce Gellar
In March, the Prospectors and Developers Association of Canada (PDAC) held its annual conference in Toronto, Ontario. This is the third PDAC meeting the author has attended. The following are some
Jan 1, 1999
-
A Report On Airborne AFMAG, The Theory, Equipment, And Operation In Western United States ? Introduction
By William Crowe Kellogg
By now the term AFMAG has been fairly well introduced to the mining industry. Several papers have been presented and published concerning AFMAG (references 1 and 2). However, the term AFMAG remains ra
Jan 1, 1960
-
Evaluation of Whole‑Body Vibration Exposure of Dozer Operators, a Task‑Based Approach
By Bülent Erdem, Zekeriya Duran, Tuğba Doğan
The objective of this study was to evaluate the potential health risk associated with exposure of dozer operators to whole-body vibration. Measurements were made on 31 dozers used in different surface
Jun 16, 2022
-
Synthetic Fiber Ropes In Haulage Systems in Underground Mining
By M. Michael, A. Felber
"Mining activities, especially underground mining operations, create great demands on utilized haulage means which cover a variety of different horizontal and vertical distances. In the course of the
Jan 1, 2015
-
Pregrouting in Rock: Contemporary Basic Principles
By Donald A. Bruce
Pregrouting is an extremely important part of many rock tunneling projects. However, poor and unsatisfactory performances have been frequently recorded often with very severe consequences, technically
Jan 1, 2005
-
A Review Of The Technology Of Glass Recovery From MSW ? Introduction
By Hugh R. Rhys
The question of the desirability of recovering cullet from MSW in order to recycle it into the manufacturing of glass containers remains a controversial one. The main factors appear to be: 1. The pos
Jan 1, 1975
-
Experimental Shaft Machine for Nuclear Waste Disposal
By Dennis Ofiara, Michael Lewis
An experimental 1.75 meter Shaft Boring Machine was designed and manufactured by The Robbins Company. The drill was used by contractor Drillcon Raise AB to drill test shafts at an SKB underground test
Jan 1, 2005
-
Identify the Influence of Risk Attitude, Work Experience, and Safety Training on Hazard Recognition in Mining "Mining, Metallurgy & Exploration (2020)"
By Brianna M. Eiter, Jennica L. Bellanca
Mineworkers face a challenging and dynamic work environment every workday. To maintain a safe workplace, mineworkers must be able to recognize worksite hazards while they perform their jobs. Though ha
Aug 31, 2020
-
Subsidence Potential In The Eastern Kentucky Coal Field
By C. A. Johnson, K. F. Unrug
The identification of the major subsidence areas in the Eastern Kentucky Coal Field has been made to distinguish the subsidence phenomena on the basis of geographical location. Further, this identific
Jan 1, 1986
-
The Athabasca Tar Sands - Developments To Date, And The Outlook For The Future ? Introduction
By L. B. McConville
The general term "tar sand" has been used to describe sand containing varying amounts of dense, viscous petroleum. Deposits of tar sands have been found throughout the world, often in the same geograp
Jan 1, 1974
-
Factors Influencing Use Of Mineral Admixtures For The Past Decade In The Western US - Preprint 09-081
By G. Hoffman
Sustainable development has brought social, environmental and energy efficiency concerns together with management and governance of natural resources. Cement manufacturing, an energy- and natural reso
Jan 1, 2009
-
Influence of highwall mining progression on web and barrier pillar stability
By M. J. Raffaldi, K. W. Harris, K. A. Perry
"Highwall miners have been widely used to extract additional coal reserves from existing surface operations, particularly on contour operations in the Appalachian coalfields. Using a continuous miner
Jan 1, 2014
-
Communication : The missing link in the minerals industry
By Pat C. Hautala, J. R. Hoskins
This is a new era for the minerals industry. Never before has there been more need for effective communication. So said Robert Anderson, chairman and chief executive officer of Hanna Mining Co. He was
Jan 1, 1985
-
MINExpo International 2004 Expects 40,000 Attendees
The latest in mining technology and equipment will be show-cased this month at MINExpo International 2004. The event, billed as the world’s largest mining equipment exhibition, is set for Sept. 27-30
Jan 1, 2004
-
El Abra - Two Years Later
By Rainer Kahrger
This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli
Jan 1, 1998