    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity

    By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang

    A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr

    Feb 1, 2020

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Quantifying Shovel Performance Through Blast Pattern Boundaries

    By K. Taylor

    In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera

    Jan 1, 2024

  • ISEE
    Explosion Hazards and Quantity-Distance Regulations – A Review of their Physical Basis

    Currently there exist several explosive quantity-distance (Q-D) rules variously exercised by most countries to protect personnel and property against the effects of accidental explosions. These regula

    Jan 1, 2011

  • ISEE
    EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and Quarries

    By Matthew Clay, Colin Chambers, Susan Hookham

    Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed

    Jan 1, 2017

  • ISEE
    Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control

    By Peter Dare-Bryan, Will Hunt, Lee Julian

    It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule

    Feb 6, 2023

  • ISEE
    Blast Modeling for Underground Mining

    By Gordon K. Jorgeonson

    Much of the modelling of blasting operations has been devoted to simulating blasts in open pit mines and quarries . This has been the most obvious application and has been reported in many papers and

    Jan 1, 1990

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    Journal: Blast Vibration and Seismograph Section: A History of the Development of Instruments for Measuring Vibrations of the Earth - Part 3

    By Robert Hopler

    The 1800’s were a time of tremendous advancements in science and experimentation, and earthquakes were a subject of great interest. The meetings of the British Association for the Advancement of Scien

    Jan 1, 2006

  • ISEE
    An Analysis of Recent Accidents During Use of Commercial Explosives

    By Lon Santis

    This paper analyzes 110 serious accidents that occurred during the use of commercial explosives in mining, construction, and other industries since 1992. Data from the Mine Safety and Health Administr

    Jan 1, 2003

  • ISEE
    Blasters' Survival

    By John C. Brulia

    The IME member companies, the ISEE along with its chapter organizations, the Federal, state and municipal regulatory agencies, and the industry consultants and suppliers have developed safety equipmen

    Jan 1, 1994

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    Investigative Blast Programme on Check Lap Kok - Site for the New Hong Kong Airport

    By Alastair Torrance, George Boucher, Roger Keller

    An investigative blast programme has been carried out to provide information on the best blasting methods to excavate Chek Lap Kok island in Hong Kong for the new airport. The objectives of the progra

    Jan 1, 1992

  • ISEE
    Structural Response and Human Response to Blasting Vibration Effects - Is There a Connection?

    By G Alan Foster

    Many complaints generated from blasting operations result from the marked human response to ground transmitted vibrations and air blast effects and so many authorities have considered the regulation o

    Jan 1, 1981

  • ISEE
    Vibration Effects of Coal Pit Blasts on Tower Pithead Concrete Structures

    By Mark Svinkin

    To save time for construction of coal pits, the contractor decided to combine erection of the tower pitheads with digging of skip shafts to the depth necessary for placing proper coal pit equipment. I

    Jan 1, 2004

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023