Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A New Approach to the Shock Energy/Gas Energy Concept

    By Thierry Bernard

    Today, experimental measurement of the shock energy/gas energy pair, or pool test, has now become virtually standard. But pool" energy per m(exp 3) of bedrock has no significance for explosives used i

    Jan 1, 1994

  • ISEE
    Chemically Sensitised Bulk Emulsions and Pump Systems Used in Hong Kong Underground Civil Works

    By Weyman CT Ngain, Brian J. Kennedy

    Innovative chemically sensitised bulk emulsion explosives and pump delivery systems have provided contractors participating in the highly competitive Hong Kong underground construction market with a s

    Jan 1, 1997

  • ISEE
    Benefits of Drill Improvement Teams

    By Miles Huntly

    This paper will discuss the ideas and actions that led to the development of a Drill Improvement Team at an open cut coal mine in Australia. It will show significant cost savings can be attained by fo

    Jan 1, 1999

  • ISEE
    Components of Successful Test Blast Programs

    By C H. Dowding, P W. Linehan

    Many of the technical and non-technical or human problems associated with blasting can be minimized through a proper preconstruction test-blast program.

    Jan 1, 1986

  • ISEE
    Australian Open Cut Coal Mine Blasting Practices and Trends

    By B J. Kennedy, G W. Sengstock

    During the last two decades, many advances have been made in open cut coal mining technology as new mines have come on stream and old mines have faced increasingly difficult mining and operational con

    Jan 1, 1995

  • ISEE
    Recent progress with the European Directive on Pyrotechnic Articles (4e894ebd-b782-4676-b2a7-043caaabc442)

    By R. Wharton, M. Bagley

    Following a series of papers relating to the certification of explosives for sale in member states of the European Union presented at previous ISEE conferences, this poster paper has been prepared to

    Jan 1, 2008

  • ISEE
    Reactivity of ANFO Mixtures with Midwest High Sulfur Coals and Pyrites

    By John W. Brown

    For seventeen years, I have been involved in surface coal mining in the Mldwest coal fields only to find that once again, I have experienced a problem that was not known to exist in our area. The exis

    Jan 1, 1992

  • ISEE
    Blasting Agents for Use in Flammable Atmospheres

    By Michael J. Sapko, Eric S. Weiss, Richard W. Watson

    As part of the Bureau of Mines research into the hazards associated with the mining and processing of oil shale, experimental mine tests have been conducted to evaluate preferred combinations of explo

    Jan 1, 1989

  • ISEE
    Pre-Blast Surveys; a Public Relations and Claim Reduction Tool

    By David Harrison, Edward J. Walter, Meitra Ferek

    A pre-blast survey can be a great tool in the prevention of blasting complaints and subsequent damage claims. In today's highly competitive industry, we are always looking for ways to become more cost

    Jan 1, 1995

  • ISEE
    Blast Modifications at Island Copper

    By Cam B. Grundstrom

    This paper will describe blast design modifications that have been made at the Island Copper Mine, near Port Hardy, British Columbia. To date, two additional designs have been implemented in an effort

    Jan 1, 1994

  • ISEE
    Open-Pit Blast Vibration Prediction

    By Jaak J. K Daemen, Carol Geertson

    A portion of a tailings impoundment may need to be removed with the expansion of an open-pit mine in northeastern Nevada. The tailings are saturated and consist of fine silty soil. During the removal

    Jan 1, 1998

  • ISEE
    The Spare Technology of Hard Stone Blocks Cut by Using the Low Brisance Explosives

    By A N: Zditovetsky Shishov, M G. Menzhulin

    At present in a building industry demand for products from granite, gabbro and other rocks, steady to erosion, natural and chemical weathering, was essentially increased. It has caused the enlargement

    Jan 1, 1996

  • ISEE
    Quality-Controlled Blasting At Hobet Mining Inc.

    By Jim Simpson, John Waller, Scott Stewart

    The authors review the evolution of drilling and blasting procedures at this West Virginia surface coal mine where management seeks continually to improve and update the drilling and blasting programs

    Jan 1, 1992

  • ISEE
    Case Study - Pumpable Emulsion Trials in Tunneling and Stoping

    By Eduardo Berger

    This paper describes a mechanized loading system, the HYDRODOSE, which allows the use of pumpable emulsions in underground mining. It also describes a pumpable emulsion explosive for small diameter ho

    Jan 1, 1991

  • ISEE
    Effects of Muck Size Distribution on Scooping Operations

    By S. P. Singh, Turgut Yalcin

    The physical characteristics of blasted rock are fundamental variables affecting the economics of mining operations and are in fact the basis for evaluating the quality of a blast. A study was designe

    Jan 1, 2002

  • ISEE
    Sequential Timing for Ore Control Blasting in Nevada

    By Dale Nies, David P. Childs

    The open pit gold and silver mining operations in the State of Nevada have historically used simple row by row, echelon, or chevron delay patterns. Common practice has been to use detonating cord trun

    Jan 1, 1991

  • ISEE
    Vibration and Air Blast Levels of Natural Phenomena and Normal Activities Compared to Levels of Blasting

    By Judy Konya Bowles, Calvin J. Konya

    Blast vibration and air blast are commonly blamed for damages to residential as well as commercial structures. Mining and construction companies are often required to spend monies in court defending t

    Jan 1, 1992

  • ISEE
    Explosive Selection - A New Approach

    By J S. Gozon, R R. Britton

    Various methods have been proposed over the past two decades to predict the borehole pressure in decoupled boreholes. In an effort to establish which characteristics best accomodate present day explos

    Jan 1, 1985

  • ISEE
    Quantifying the Probability of Detonator Timing Overlap in Surface Mine Blasting by the Application of Monte-Carlo Simulations to Initiation Plans

    By Rob Farnfield

    The control of vibration from surface mine blasting by the application of detonator (cap) delay techniques has been universally accepted for many years. For almost as long it has been known that, for

    Jan 1, 1999

  • ISEE
    Development of the Remote Controlled Blasting System for Tunnel Construction

    By Minoru Kawamura, Yukio Kato, Yoshikazu Hirosaki, Satoru Suzuki

    A wireless blasting system for tunnel construction which consists of a loop antenna, oscillator and blaster, has been developed. The basic technology of this method had been studied in the 1970s to de

    Jan 1, 1998